The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAsiamet Res Share News (ARS)

Share Price Information for Asiamet Res (ARS)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.525
Bid: 1.45
Ask: 1.60
Change: 0.15 (10.91%)
Spread: 0.15 (10.345%)
Open: 1.375
High: 1.55
Low: 1.375
Prev. Close: 1.375
ARS Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Asiamet Aiming To Deliver USD1.27 Billion In Revenue From Indonesia

Tue, 05th Apr 2016 08:30

LONDON (Alliance News) - Asiamet Resources Ltd shares rose on Tuesday as it published the results of the preliminary economic assessment for the Beruang Kanan Main copper deposit in Indonesia which forecasts the company can deliver USD1.27 billion of revenue over an eight-year mine life.

Asiamet shares were trading down 1.9% to 4.00 pence per share on Tuesday morning, after having initially spiked to a new 52-week high of 6.00p at the open following the announcement.

The study evaluated the the economics of developing an open-pit mine and heap leach solvent extraction electro-winning facility to produce copper cathode from the near-surface copper deposit.

"Results of the preliminary economic assessment study demonstrate excellent potential for developing a robust, low strip ratio, low capital intensity copper project with low operating costs, strong cash flow generation capacity and significant upside potential through further resource growth," said the company in a statement.

The company plans to build a project capable of producing 25,000 tonnes of copper metal classed as grade A material of 99.99%, which will cost the company around USD163.8 million in initial capital expenditure.

That gives the project a net present value after tax of USD204.3 million and an after-tax internal rate of return of 38.7%, providing a 2.4 year payback period.

The company said the cash operating cost is estimated to be around USD1.28 per pound, and said based on a copper price of USD3.25 per pound, would yield USD1.27 billion of revenue over the eight-year mine life.

Production will be taken from the company's resources, of which 71% are inferred resources whilst the other 29% is classified as indicated resources. Asiamet said there is potential to grow its resource base at the project.

"Copper mineralization at Beurang Kanan Main remains open in several directions and locally at depth. Adjacent high-potential prospects at Beruang Kanan South, Beruang Kanan West and BKZ Polymetallic also represent attractive targets for additional mineralization as demonstrated by the strong surface and drilling results returned to date," said the company.

"Increasing the mineral resource base, and thus the potential feed available to the processing facilities evaluated in the current [study], is likely to have a strongly positive impact on the BKM copper project value and will be a key focus for Asiamet going forward," it added.

By Joshua Warner; joshuawarner@alliancenews.com; @JoshAlliance

Copyright 2016 Alliance News Limited. All Rights Reserved.

More News
18 Dec 2018 12:48

Asiamet Resources' drilling results imminent as external rigs hasten progress

(Sharecast News) - Asiamet Resources reported on Tuesday that the initial results of its 4,500 metre drilling program at its flagship Beruang Kanan Main (BKM) copper project in Indonesia are due imminently.

Read more
30 Nov 2018 12:55

Friday broker round-up

(Sharecast News) - BTG: Jefferies downgrades to hold with a target price of 840p.

Read more
28 Nov 2018 14:44

Asiamet Resources To Raise USD3.3 Million Via Share Placing (ALLISS)

LONDON (Alliance News) - Asiamet Resources Ltd said Wednesday that it is planning a placing of up to 60.7 million shares to raise USD3.3 million.The company will issue the shares at 4.25 up

Read more
18 Oct 2018 13:35

Asiamet Intersects Copper In Beutong But Extends Drilling In Beruang

LONDON (Alliance News) - Asiamet Resources Ltd said Thursday it has intersected "broad copper intervals" at its Beutong porphyry project but will require further "limited" at a

Read more
25 Sep 2018 13:53

Asiamet Resources Interim Loss Widens On Higher Expenses

LONDON (Alliance News) - Asiamet Resources Ltd on Tuesday said its loss widened in the first half of 2018 due to an increase in costs.The copper-gold deposits developer said its loss to in

Read more
29 Aug 2018 13:30

Asiamet Resources Says Copper Core May Connect Beutong East And West

LONDON (Alliance News) - Asiamet Resources Ltd said Wednesday it has intersected copper mineralisation beyond its previous expectations at its Beutong West porphyry mine in Indonesia.The of

Read more
10 Aug 2018 10:36

Asiamet Resources Nears Feasibility Study Completion At Beruang Kanan

LONDON (Alliance News) - Asiamet Resources Ltd on Friday said its bankable feasibility study for the Beruang Kanan Main copper project, located in central Kalimantan, Indonesia, is nearing company

Read more
7 Aug 2018 12:49

Asiamet Reports "Excellent Results" From Beutong Copper Project

LONDON (Alliance News) - Asiamet Resources Ltd said Tuesday it has received positive results from a current infill and extension drilling programme at its Beutong copper project in company said a

Read more
7 Aug 2018 12:04

Asiamet chuffed with recent drilling at Beutong

(Sharecast News) - Asiamet Resources reported further "excellent" results from the current infill and extension drilling program being undertaken at its 80%-owned Beutong Project on Tuesday.

Read more
18 Jun 2018 15:58

UK Shareholder Meetings Calendar - Next 7 Days

Tuesday 19 JuneEvrazMetals ExplorationHC SlingsbyTrinity Exploration & In Direct

Read more
14 Jun 2018 13:51

Asiamet Resources Finds Copper Mineralisation At Beutong Project

LONDON (Alliance News) - Asiamet Resources Ltd said Thursday it has intersected a "broad" zone of copper mineralisation at the Beutong project in Indonesia.The company said hole a

Read more
1 Jun 2018 12:09

Asiamet Resources Appoints Dominic Heaton As Non-Executive Director

LONDON (Alliance News) - Copper and gold exploration company Asiamet Resources Ltd said Friday it appointed Dominic Heaton as non-executive director with effect from June 26.Heaton is chief

Read more
16 May 2018 14:27

Asiamet Releases Maiden Mineral Resource Estimate For Indonesian Mine

LONDON (Alliance News) - Asiamet Resources Ltd released its maiden mineral resource estimate on Wednesday for its BKZ Polymetallic deposit located in Indonesia.The inferred mineral estimate

Read more
18 Apr 2018 16:21

Asiamet Resources Raises CAD128,855 Following Warrants Exercise (ALLISS)

LONDON (Alliance News) - Asiamet Resources Ltd on Wednesday said that it raised CAD128,855 after Optiva Securities Ltd exercised its warrants.The minig company issued 2.2 million shares at

Read more
3 Apr 2018 13:52

Asiamet Gets Encouraging Results From BKM Project Drilling

LONDON (Alliance News) - Asiamet Resources Ltd said Tuesday it has received higher than expected grades after further drilling at its BKM copper project in included 17 metres

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.