The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmur Minerals Share News (AMC)

  • This share is currently suspended. It was suspended at a price of 0.09

Share Price Information for Amur Minerals (AMC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.09
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.09
AMC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Amur Reports Rise In Kun Manie Resource After Evaluating Deposits

Tue, 10th May 2016 08:30

LONDON (Alliance News) - Amur Minerals Corp Tuesday said it has now updated the resources in all of the deposits that will provide production at the Kun Manie project in Russia after completing the evaluation of the Kubuk nickel and copper deposit.

Amur said the update to Kubuk completes the resource evaluation phase for the definitive feasibility study covering the Kun Manie project, and the metallurgical grade recovery curves for each of the four deposits are being updated to determine which metals can be extracted from the ore and recovered by the treatment facility, which will produce a concentrate that is suitable for smelting.

"We are now reviewing available metallurgical test work to establish grade recovery curves for each of the four deposits that will be sources to the mill. The curves will allow us to define the unique operating profits per ore tonne as each deposit does display differing metallurgical recoveries," said Chief Executive Robin Young.

The Kubuk deposit is the third largest deposit to be drilled on the project so far, holding around 16% of the ore mineralisation that has been found in total. The deposit contains 25.7 million tonnes of ore with a nickel grade of 0.52%, a copper grade of 0.15% and also holds some platinum group metals.

Overall, Kubuk is thought to hold 133,000 tonnes of nickel, 39,400 tonnes of copper and around 7,200 kilogrammes of platinum group metals.

The resource within Kubuk has increased from the previous estimate that the deposit had 20.6 million tonnes of ore containing 118,900 tonnes of nickel, 32,900 tonnes of copper and 1,800 kilogrammes of platinum group metals.

That means the amount of nickel thought to lie in Kubuk has risen by 12% from the previous estimate whilst the amount of copper has increased by 20%. The platinum group metals contained within Kubuk is now three times larger than the previous forecast.

Notably, 75% of the nickel, 67% of the copper and 58% of the platinum group metals contained within Kubuk lie within high grade structures.

With Kubuk updated, the total drill defined resource within all of the deposits in Kun Manie stands at 164.7 million tonnes of ore containing 740,100 tonnes of nickel, 212,900 tonnes of copper and 42,300 kilogrammes of platinum group metals. That includes measured and indicated resources as well as proven and probable reserves.

Looking at the measured and indicated resources, the overall project now has 484,100 tonnes of nickel and 136,600 tonnes of copper.

That has increased from the previous estimate covering the measured and indicated resources at all of the deposits, which implied there 292,200 tonnes of nickel and 85,100 tonnes of copper.

That means the measured and indicated resources at the overall project has increased, with contained nickel rising by 66% from the previous estimate whilst the measured and indicated copper resource contained in the project has increased by 61%.

"On finalisation of the recovery curves, we will be awarding the reserve definition stage of work to an independent consultant to be done to definitive feasibility study standards. The scope of services will be the definition of the right mining method for the right style of mineralisation at the correct location," said Young.

Amur shares were trading up 0.7% to 4.25 pence per share on Tuesday morning.

By Joshua Warner; joshuawarner@alliancenews.com; @JoshAlliance

Copyright 2016 Alliance News Limited. All Rights Reserved.

More News
4 May 2020 18:27

Amur Minerals Repays Initial Advance Of Plena Global Loan Note

Amur Minerals Repays Initial Advance Of Plena Global Loan Note

Read more
17 Apr 2020 06:03

Amur Minerals Raises GBP750,000 Through Share Placing

Amur Minerals Raises GBP750,000 Through Share Placing

Read more
12 Mar 2020 15:49

Amur Minerals Gets GBP1.5 Million Loan For Kun-Manie Feasibility Study

Amur Minerals Gets GBP1.5 Million Loan For Kun-Manie Feasibility Study

Read more
17 Feb 2020 09:42

Testing For Saleable Copper Begins At Amur Minerals's Kun-Manie

Testing For Saleable Copper Begins At Amur Minerals's Kun-Manie

Read more
28 Jan 2020 14:11

Amur Minerals Completes Rock Mechanics Study At Kun-Manie

Amur Minerals Completes Rock Mechanics Study At Kun-Manie

Read more
15 Jan 2020 15:52

Amur Minerals submits environmental assessment for Kun-Manie

(Sharecast News) - Russia-focussed nickel-copper sulphide exploration and development company Amur Minerals Corporation announced on Wednesday that the baseline environmental assessment (BLEA) for its Kun-Manie nickel copper sulphide project was now complete, and had been filed and approved by the necessary Russian Federation agencies.

Read more
15 Jan 2020 11:09

Amur Minerals Completes Environmental Survey At Kun-Manie, Russia

Amur Minerals Completes Environmental Survey At Kun-Manie, Russia

Read more
6 Dec 2019 16:00

UK Shareholder Meetings Calendar - Next 7 Days

UK Shareholder Meetings Calendar - Next 7 Days

Read more
18 Nov 2019 14:15

Amur Minerals Shares Surge As It Repays Convertible Loan In Full

Amur Minerals Shares Surge As It Repays Convertible Loan In Full

Read more
12 Nov 2019 15:52

Amur Minerals identified water sources for Kun-Manie development

(Sharecast News) - Eastern Russia-focussed nickel-copper sulphide exploration and development company Amur Minerals Corporation announced on Tuesday that the hydrological assessment - a component of the permanent conditions 'TEO', a Russian equivalent to a feasibility study - for its Kun-Manie nickel copper sulphide project was now complete, and had been approved by the necessary Russian agencies.

Read more
12 Nov 2019 11:40

Amur Minerals Completes Hydrological Assessment For Kun-Manie Project

Amur Minerals Completes Hydrological Assessment For Kun-Manie Project

Read more
4 Nov 2019 10:39

UK WINNERS & LOSERS SUMMARY: Egdon Resources Hit By UK Fracking Ban

UK WINNERS & LOSERS SUMMARY: Egdon Resources Hit By UK Fracking Ban

Read more
4 Nov 2019 10:21

Amur Minerals Raises GBP1.2 Million Through Share Subscription

Amur Minerals Raises GBP1.2 Million Through Share Subscription

Read more
1 Oct 2019 14:56

Amur Minerals Half-Year Loss Narrows As Progresses Kun-Manie Work

Amur Minerals Half-Year Loss Narrows As Progresses Kun-Manie Work

Read more
23 Sep 2019 14:37

Amur Minerals TEO And Definitive Feasibility Study Making Progress

Amur Minerals TEO And Definitive Feasibility Study Making Progress

Read more

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.