PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksZephyr Energy Regulatory News (ZPHR)

Share Price Information for Zephyr Energy (ZPHR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.40
Bid: 5.30
Ask: 5.50
Change: -0.05 (-0.92%)
Spread: 0.20 (3.774%)
Open: 5.45
High: 5.45
Low: 5.40
Prev. Close: 5.45
ZPHR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Grant of final approvals for State 16-2 well

2 Dec 2020 08:23

RNS Number : 2581H
Zephyr Energy PLC
02 December 2020
 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR"). With the publication of this announcement via a Regulatory Information Service, this inside information is now considered to be in the public domain.

 

2 December 2020

Zephyr Energy plc

("Zephyr" or the "Company")

 

Grant of final approvals for State 16-2 well

Zephyr Energy plc (AIM: ZPHR), the Rocky Mountain oil and gas company focused on responsible resource development, provides an update on its project in the Paradox Basin, Utah, U.S.A (the "Paradox project"), where the Company is preparing to spud the 'dual-use' State 16-2 well before the end of the year.

 

The Company is pleased to announce that it has now received all the final approvals required to proceed with the spud of the State 16-2 well. These approvals include surface rights and rights to drill from the Utah School and Institutional Trust Lands Administration ("SITLA"), federal Right of Way approvals from the Bureau of Land Management ("BLM"), and Application to Drill ("APD") approval from the Utah Division of Oil, Gas and Mining ("DOGM"). In addition, the Company has received all necessary consents from its joint-venture partner on the Paradox project.

 

With these approvals and permits in place, the Company is working to finalise project contracts to enable rig mobilisation over the coming days. The road and site preparation work for the well has now been successfully completed, and work to responsibly plug and abandon the existing inactive well on site has commenced.

 

Colin Harrington, Zephyr's Chief Executive said "I am delighted that we have secured the final approvals and consents required to facilitate the commencement of drilling of the State 16-2 well.

 

"I would like to thank all parties involved in this process for their commitment, flexibility and hard work in enabling us to reach this major milestone within the required timeframe.

 

"With work on the ground already underway, we are in the final stages of operational preparations to ensure the safe and successful spud of the well by our year-end goal."

 

For further information please visit https://www.zephyrplc.com/ or contact:

Zephyr Energy plc

Colin Harrington (CEO)

Chris Eadie (CFO)

 

 Tel: +44 (0)20 7225 4590

Allenby Capital Limited - AIM Nominated Adviser

Jeremy Porter / Liz Kirchner

 

 Tel: +44 (0)20 3328 5656

 

Turner Pope Investments - Broker

Andy Thacker / Zoe Alexander

 

Flagstaff Strategic and Investor Communications

Tim Thompson / Mark Edwards / Fergus Mellon

 Tel: +44 (0)20 3657 0050

 

 

Tel: +44 (0) 20 7129 1474

 

 

 

Background to the 16-2 well

 

As announced on 2nd September 2020, the Company has been working with a project team led by the EGI in collaboration with the UGS and other Utah-based partners. The project is entitled "Improving Production in Utah's Emerging Northern Paradox Unconventional Oil Play" and its goal is to assess and perform optimisation analyses for more focused, efficient and less environmentally-impactful oil production strategies in the northern Paradox Basin, particularly in the Pennsylvanian Paradox Formation's Cane Creek shale and adjacent clastic zones. This project is sponsored by the U.S. Department of Energy and its National Energy Technology Laboratory (the "DOE").

 

As part of this study, the EGI and UGS originally planned to drill a vertical stratigraphic test well to gather data to improve the understanding of the Paradox Basin play. It was planned that the proposed well would target the Cane Creek and potentially the C18/19 reservoirs, acquiring both core data and a comprehensive well log suite in order to provide valuable new basin data.

 

Over a period of several months, the project team analysed multiple potential well locations across the Paradox Basin, and the Company was delighted that the EGI and UGS selected Zephyr's Paradox acreage as the location on which to drill the well.

 

The Company's location was selected for a number of reasons, including the quality of the Group's underlying 3D seismic data (which can be tied into the well results to build a stronger integrated predictive model) as well as a favourable surface location which will be sited on a pre-existing pad.

 

Since Zephyr's Paradox acreage was selected as the location for the test well, Zephyr has been working with its project partners to construct a project plan that maximises the opportunity for all parties.

 

A key part of this plan is to design the well in such a way that not only can it be used to obtain all the data required by the research project, but that it can also be re-used by the Company in the future as the host for a lateral appraisal well. This approach not only reduces environmental impact but it will also potentially significantly reduce future well costs for the Company.

 

It is currently expected that the total cost of the vertical well activity is forecast to be between US$2.5 million to US$3 million, of which the first US$2million will be funded by grant funding from the DOE and up to US$1 million will be funded by Zephyr. Neither party is liable for any costs in excess of the US$3 million combined project limit.

 

The primary objectives of the initial stratigraphic well are to drill vertically to an approximate true vertical depth ("TVD") of 9,850 feet, and to acquire up to 90 feet of continuous core from the Cane Creek reservoir. The results from the analysis of the core and from other drilling data are expected to be available within three months from the completion of drilling.

 

Once the vertical well is completed it will be temporarily plugged back to 6,500 feet TVD. Zephyr (or a farm-in partner) will then have the opportunity to re-utilise the vertical wellbore as a sidetrack host from which a horizontal appraisal well can drilled. By re-utilising the vertical portion of the stratigraphic well, the Company estimates the total costs of drilling a future horizontal appraisal well will be reduced from circa US$6.0m to circa US$3.0m.

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDUUUWRRAUURRA
Date   Source Headline
28th May 20215:00 pmRNSTotal Voting Rights
24th May 20214:41 pmRNSSecond Price Monitoring Extn
24th May 20214:36 pmRNSPrice Monitoring Extension
11th May 20213:50 pmRNSExercise of warrants and change to TVR
5th May 20214:41 pmRNSSecond Price Monitoring Extn
5th May 20214:35 pmRNSPrice Monitoring Extension
4th May 20217:00 amRNSFirst North Dakota revenues, acquisition & Paradox
30th Apr 20215:00 pmRNSTotal Voting Rights
30th Apr 202112:06 pmRNSHolding(s) in Company
29th Apr 20213:04 pmRNSHolding(s) in Company
29th Apr 20217:00 amRNSHolding(s) in Company
19th Apr 20218:30 amRNSDirector/PDMR/PCA Shareholdings
16th Apr 202110:50 amRNSResult of GM & change to TVR
9th Apr 202111:46 amRNSHolding(s) in Company
1st Apr 20217:00 amRNSCompletion of acquisition in the Bakken Formation
31st Mar 20215:00 pmRNSTotal Voting Rights
29th Mar 20217:00 amRNSProposed acquisition and £10m placing
22nd Mar 20214:57 pmRNSExercise of warrants and change to TVR
16th Mar 20217:00 amRNSHolding(s) in Company
15th Mar 20217:00 amRNSBoard approval to proceed with State 16-2 lateral
26th Feb 20215:00 pmRNSTotal Voting Rights
25th Feb 20215:44 pmRNSHolding(s) in Company
24th Feb 202111:35 amRNSExercise of warrants and change to TVR
16th Feb 202112:00 pmRNSExercise of warrants and change to TVR
11th Feb 20215:48 pmRNSPresentation & updated well & project economics
9th Feb 20217:00 amRNSInvestor Presentation
3rd Feb 202110:50 amRNSExercise of warrants and change to TVR
2nd Feb 20216:24 pmRNSHolding(s) in Company
29th Jan 20215:00 pmRNSTotal Voting Rights
29th Jan 202111:58 amRNSExercise of warrants and change to TVR
29th Jan 20217:00 amRNSInitial evaluation of State 16-2 well log data
28th Jan 20217:00 amRNSExercise of warrants and change to TVR
26th Jan 202110:46 amRNSExercise of warrants and change to TVR
25th Jan 20215:45 pmRNSHolding(s) in Company
25th Jan 20217:00 amRNSCorporate Update (inc. State 16-2 well)
20th Jan 202112:13 pmRNSExercise of warrants and change to TVR
15th Jan 20219:22 amRNSHolding(s) in Company
14th Jan 20217:00 amRNSState 16-2 Well Update
4th Jan 20217:00 amRNSState 16-2well, business development & '21 outlook
21st Dec 20207:55 amRNSPhoto gallery of State 16-2 well operations
18th Dec 20207:00 amRNSState 16-2 well commencement of drilling
10th Dec 20207:00 amRNSParadox State 16-2 well update
3rd Dec 20207:00 amRNSAward of drilling contract to Cyclone Drilling Inc
2nd Dec 20208:23 amRNSGrant of final approvals for State 16-2 well
30th Nov 20205:00 pmRNSTotal Voting Rights
27th Nov 20208:49 amRNSInvestor Presentation ahead of drilling campaign
19th Nov 20204:38 pmRNSHolding(s) in Company
19th Nov 20201:30 pmRNSHolding(s) in Company
19th Nov 20207:00 amRNSParadox well -commencement of operational activity
12th Nov 20207:00 amRNSPresentation re Paradox Basin: History & Potential

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.