La Parrilla Tailings Update

15 Sep 2014 13:15

RNS Number : 6926R
W Resources PLC
15 September 2014
 



15 September 2014

 

 

 

 

 

 

W Resources Plc

("W" or the "Company")

 

 

La Parrilla Tailings Update

W Resources Plc (AIM:WRES), the tungsten, copper and gold production, exploration and development company with assets in Spain and Portugal, is pleased to provide an update on the La Parrilla Tailings project.

 

Following a scheduled 8-day shutdown in August, the La Parrilla tailings facility has been producing tungsten concentrate since 25 August on a continuous basis.

 

Additional improvements have been made to the pre-concentration plant that uses screens and hydro-cyclones to produce upgraded ore to be fed to the concentrate plant with production ratios now close to our design levels. There is scope to further improve plant availability and the proportion of upgraded concentrate feed generated from each tonne of tailings which we believe can be achieved progressively during the second half of 2014 and into 2015.

 

The concentrate plant has also steadily increased its performance with improvements in feed, plant availability and overall recoveries. Recoveries are expected to steadily increase over the coming quarter.

 

In addition to achieving steady operating performance, we will implement three main initiatives over the next quarter to further improve performance:

1. Switch from high cost diesel power to low cost Spanish grid-supplied power, halving energy costs. The saving is estimated at EUR400,000 annually and is scheduled to be implemented in the December quarter.

2. Produce a separate tin concentrate through the installation of an electrostatic separator. Currently there is no revenue recognition of the approximately 7% Tin (Sn) in the tungsten concentrate; production of a separate tin concentrate will increase revenues and profitability.

3. Install improved feed systems to ensure a steady feed to concentration plant and improve overall recoveries.

 

Michael Masterman, Chairman of W Resources commented "The La Parrilla tailings facility is on track to reach target production levels of 25 tonnes per month of 60%-63% WO3 in September/October 2014. Based on current performance indications, we believe there is scope to further increase production beyond the current 25 tonne per month target and this will be reassessed in October."

 

W is also pleased to confirm it has now entered into contractual off-take agreements with one of Europe's largest tungsten consumers and is shipping product on a regular basis. With physical product being picked-up from the La Parrilla mine site and delivered by single truck movements to the customer, these sales contracts enjoy both simple logistics and good payment terms. Terms of the offtake agreements remain 'commercial in confidence' but we are pleased to confirm they are broadly linked to the European APT price.

 

 

Enquiries:

W Resources Plc

Grant Thornton UK LLP

Michael Masterman

Colin Aaronson / Melanie Frean / Jen Clarke

T: +44 (0) 20 7193 7463

T: +44 (0) 20 7383 5100

www.wresources.co.uk

SI Capital

Gable Communications

Andy Thacker / Nick Emerson

John Bick

T: +44 (0) 1483 413500

T: +44 (0) 20 7193 7463

www.sicapital.co.uk

M: +44 (0) 7872 061007

 

About La Parrilla

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site is accessed directly from the highway along a 3 km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The mine resource estimated by Golder in June 2013 is 46.92 million tonnes at 0.09% WO3, making it one of the largest tungsten deposits in the western world.

Annual plant feed will be c330,000 tonnes and annual production is anticipated to be 450 tonnes of tungsten trioxide (WO3) and 26 tonnes of tin (Sn), which will deliver over €7million per annum in revenue at current tungsten and tin prices.

 

Technical information in this report and on the W website has been prepared in accordance with the JORC Code and approved for inclusion by Mr Fernando de la Fuente, who is a "qualified person" in respect of the AIM Rules for Companies with over 39 years' experience in the Exploration and Mining Geology industry. Mr de la Fuente holds a B.Sc. in Geology and a MSc in Geology from the University of Granada in Spain. He is also a member of the Spanish College of Geologists (Number 49), the Spanish Society of Mineralogy, founder member of the Spanish Society of Geology, member of the Spanish Association of Applied Geology to Mineral Deposits, member of the Society for Mining, Metallurgy and Exploration, Inc., member of PDAC.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQKPDKBBKDOCD
Date   Source Headline
7th Oct 201511:02 amRNSCAA / Portalegre Licence Expanded
30th Sep 20159:00 amRNSHalf Yearly Report
29th Sep 201511:01 amRNSLa Parrilla FTM Development Update
9th Sep 20159:17 amRNSHolding(s) in Company
26th Aug 20152:49 pmRNSChanges to Significant Shareholders
10th Aug 20157:00 amRNSRégua drilling update
14th Jul 20157:00 amRNSEnvironmental Approval for La Parrilla
10th Jul 20157:00 amRNSFast Track Mine Infill Drilling Advances
26th Jun 201511:11 amRNSPlacing and Appointment of Broker
19th Jun 20151:30 pmRNSResult of AGM
16th Jun 20157:00 amRNSLa Parrilla Definition Study Completed
5th Jun 20157:00 amRNSFast Track Mine Infill Drilling Advances
26th May 20157:01 amRNSNotice of AGM
22nd May 20157:00 amRNSFinal Results for the Year Ended 31 December 2014
12th May 20157:00 amRNSUpdate on CAA / Portalegre
28th Apr 20157:00 amRNSExcellent Drilling Results Continue at Regua
13th Apr 20159:51 amRNSBergen Facility Fully Repaid
26th Mar 20152:17 pmRNSAdditional Placing of 200,000 GBP
20th Mar 20158:39 amRNSCorrection: Repayment of Bergen Facility
20th Mar 20157:00 amRNSRepayment of Bergen Facility and Placing
9th Mar 20159:28 amRNSRegua Project Update
13th Feb 201510:59 amRNSLa Parrilla Mine and Tailings Update
6th Feb 20159:25 amRNSChanges to Significant Shareholders
20th Jan 20151:09 pmRNSPlacing to Raise £1.4m
29th Dec 201412:31 pmRNSDirector Dealing
24th Dec 201411:11 amRNSIssue of Equity
24th Dec 20147:00 amRNSLa Parrilla Operations and Development Update
18th Dec 20147:00 amRNSDirectorate Change
15th Dec 20147:00 amRNSLa Parrilla Mine Connects to Spanish Grid
4th Dec 20147:00 amRNSCAA / Portalegre Drilling Campaign Commences
24th Nov 20147:00 amRNSRegua Development Campaign Commences
19th Nov 20147:00 amRNSLa Parrilla Tailings Plant Improvement Update
4th Nov 20147:00 amRNSDirector Dealing
30th Oct 20147:00 amRNSStrong Trenching Exploration Results
27th Oct 20147:00 amRNSBergen First Closing Completed
22nd Oct 20147:00 amRNSTrading and operations update
16th Oct 201410:56 amRNSConvertible security & private placement facility
30th Sep 20147:00 amRNSInterim results to 30 June 2014
17th Sep 20147:00 amRNSTarouca Drilling Programme Completion
15th Sep 20141:15 pmRNSLa Parrilla Tailings Update
8th Sep 201410:43 amRNSLa Parrilla mine development plan
11th Aug 20147:00 amRNSFirst Tungsten Shipment Cash Proceeds
8th Aug 20145:20 pmRNSDirector Shareholding
29th Jul 20141:35 pmRNSPlacing to raise £1.2 million
28th Jul 20147:00 amRNSTarouca Drilling Update
10th Jul 20147:00 amRNSProduction Ramp-up at La Parrilla Tailings
27th Jun 20143:32 pmRNSShare transfer
23rd Jun 20147:00 amRNSTrial Mining Licence Awarded at Régua
20th Jun 201412:41 pmRNSResult of AGM
27th May 20144:44 pmRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.