Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says. Watch here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Caspian continues finding oil

18 Sep 2006 11:04

Caspian Holdings plc18 September 2006 18 September 2006 Caspian Holdings Plc ("Caspian" or "the Company") Caspian continues finding oil - update on wells 102, 104, 109 and 118 Caspian Holdings Plc (AIM: CSH), the oil and gas production and explorationCompany in Kazakhstan, issues a further set of positive results from thedrilling campaign at its Zhengeldy oil field. Commercial oil production rateshave been tested in wells 102 and 104 and the interpretation of log results onrecently drilled wells - 109 and 118 - shows good oil pays. Well 102 was perforated and tested at the interval, 178-180.5 metres and iscurrently producing 25 barrels of oil per day ("bopd"). Well 104 was perforatedand tested in early August and yielded production rates of 16 bopd. Well 109 was drilled to a depth of 734 metres in the south of Zhengeldy dry saltlake. Analysis of the open hole log results shows a good oil bearing reservoirbelow 170 metres with a gross pay of 13.9metres and a net pay of 5.1metres.Porosity in this well is high, at 35%, with oil saturation of 58%. Well 118 was drilled to a depth of 400 metres in the middle of the Zhengeldy drysalt lake, near the successful Well 103. Analysis of the open hole log resultsshows potentially two oil-bearing reservoirs between 255metres and 355metres.The best level is at 255metres with a gross pay of 4.9metres and a net pay of3.1metres with porosity of 32% and an oil saturation of 52%. It appears thatthere is a gas cap above the oil bearing level which should support higherproduction rates. Wells 109 and 118 will be perforated and tested during September and October. Detailed re-evaluation of logs indicates a gas cap in the Jurassic level inblock 2 covering wells 103, 113 and 118. The gas cap can be used to sustainproduction rates from this block. As a result Well 103 will be reperforated inthe oil bearing reservoir below the gas cap. There will be short term reductionin production during the work over process. With the arrival from Schlumberger, of our new operations manager, EssienUmoren, we are in the process of conducting an extensive petrophysical review ofwell data with a view to identifying new production zones and increasingproduction. An updated summary of the 2006 wells is shown below. Overall thefield has very good porosity and good oil saturation. Results of 2006 Drilling programme Well Depth Drilling Oil Zones Net Pay Oil Saturation % Porosity % Tested rate metres bopd metres Days 101 455 22 1 8 42% 31% 45 102 400 16 2 9.5 70% 29% 25 103 302 13 2 5.8 63% 29% 120 104 710 30 1 2.7 55% 27% 16 105 575 20 2 5 60% 28% 35 109 734 25 1 5.1 58% 35% TBT 118 400 14 2 3.1 52% 32% TBT Commenting on the results, Michael Masterman, CEO of Caspian said: "These recentresults from Well 109 and 118 demonstrate that we are consistently finding oilfrom our 2006 drilling programme and are building a solid production capacity." ENDS Enquiries: Caspian Holdings Plc Hoodless Brennan Parkgreen CommunicationsMichael Masterman Luke Cairns Justine Howarth / Ana RibeiroT: +44 (0) 7791288381 T: +44 (0) 20 7538 1166 T: +44 (0) 20 7493 3713www.caspianoil.co.uk Mr Dietmar Greil, Executive Director and Chief Operating Officer of CaspianHoldings Plc is a "qualified person" with over 20 years experience inExploration and Development in the oil industry. This press release has beenprepared under Mr Greil's supervision. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
13th May 20143:05 pmRNSPlacing
24th Apr 20149:40 amRNSFinal Results for the Year Ended 31 December 2013
17th Apr 20149:49 amRNSEncouraging Gold and Copper Values in Portalegre
14th Apr 20147:00 amRNSFirst production from La Parrilla
6th Mar 20147:00 amRNSDrilling starts at high grade Tarouca Project
28th Feb 20147:01 amRNSLa Parrilla Tailings Update
26th Feb 201412:45 pmRNSResignation of Director
22nd Jan 20147:00 amRNSLa Parrilla Grades exceed expectations
13th Jan 20147:00 amRNSCommissioning of Pre-Concentration Plant
10th Dec 20134:45 pmRNSPlacing
24th Oct 20139:39 amRNSTrenching at Tarouca continues to deliver
26th Sep 201310:25 amRNSInterim Results
13th Sep 201311:45 amRNS3.5km Gold Anomaly Identified at Portalegre
30th Aug 20138:37 amRNSLa Parrilla Mine Acquisition
19th Jul 201310:12 amRNSDirector dealing
17th Jul 20139:05 amRNSPlacing
28th Jun 201312:40 pmRNSResult of AGM
18th Jun 201311:30 amRNSLa Parilla JORC Resource Increase of 30%
4th Jun 20134:15 pmRNSNotice of AGM
9th May 20139:35 amRNSW Resources commences construction of facility
24th Apr 201312:11 pmRNSAnnual Financial Report
18th Apr 201310:45 amRNSPlacing
19th Mar 20139:05 amRNSTarouca Early Exploration Success
8th Mar 201312:56 pmRNSHolding(s) in Company
25th Feb 20137:00 amRNSLa Parrilla Extension Drilling Completed
20th Feb 201310:09 amRNSPlacing
8th Feb 201310:00 amRNSDirector dealing
30th Jan 201310:27 amRNSW Resources completes Placing
28th Jan 20137:00 amRNSDrilling Update
22nd Jan 20137:00 amRNSLa Parrilla Tailings Project Approved
28th Nov 20129:56 amRNSHolding(s) in Company
16th Nov 20127:00 amRNSLa Parrilla Tailings Environmental Authorisation
8th Nov 20122:00 pmRNSW Resources Completes Placing
31st Oct 20127:00 amRNSPortalegre drilling update
30th Oct 20123:37 pmRNSHolding(s) in Company
29th Oct 20127:00 amRNSLa Parrilla Tailings Project Update
18th Oct 20127:00 amRNSCompany Presentation
4th Oct 20125:17 pmRNSJORC resources at Regua increase 30%
27th Sep 20127:00 amRNSInterim Results
10th Sep 20127:00 amRNSHigh Grade Assay Results Continue at La Parrilla
20th Aug 20127:00 amRNSHigh Grade Assay Results Continue at La Parrilla
13th Jul 201210:10 amRNSIssue of Equity
11th Jul 20124:20 pmRNSChange of Company Name
26th Jun 20124:15 pmRNSCaspian announces Placing
26th Jun 20122:05 pmRNSFirst assay results from Portalegre
22nd Jun 201211:48 amRNSResult of AGM
25th May 201210:00 amRNSCaspian to Acquire Assets in Portugal
16th May 20129:14 amRNSHigh Grade Assay Results
27th Apr 20129:45 amRNSFinal Results for the Year End 31 December 2011
16th Apr 20127:00 amRNSDrilling update - La Parrilla

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.