Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Caspian continues finding oil

18 Sep 2006 11:04

Caspian Holdings plc18 September 2006 18 September 2006 Caspian Holdings Plc ("Caspian" or "the Company") Caspian continues finding oil - update on wells 102, 104, 109 and 118 Caspian Holdings Plc (AIM: CSH), the oil and gas production and explorationCompany in Kazakhstan, issues a further set of positive results from thedrilling campaign at its Zhengeldy oil field. Commercial oil production rateshave been tested in wells 102 and 104 and the interpretation of log results onrecently drilled wells - 109 and 118 - shows good oil pays. Well 102 was perforated and tested at the interval, 178-180.5 metres and iscurrently producing 25 barrels of oil per day ("bopd"). Well 104 was perforatedand tested in early August and yielded production rates of 16 bopd. Well 109 was drilled to a depth of 734 metres in the south of Zhengeldy dry saltlake. Analysis of the open hole log results shows a good oil bearing reservoirbelow 170 metres with a gross pay of 13.9metres and a net pay of 5.1metres.Porosity in this well is high, at 35%, with oil saturation of 58%. Well 118 was drilled to a depth of 400 metres in the middle of the Zhengeldy drysalt lake, near the successful Well 103. Analysis of the open hole log resultsshows potentially two oil-bearing reservoirs between 255metres and 355metres.The best level is at 255metres with a gross pay of 4.9metres and a net pay of3.1metres with porosity of 32% and an oil saturation of 52%. It appears thatthere is a gas cap above the oil bearing level which should support higherproduction rates. Wells 109 and 118 will be perforated and tested during September and October. Detailed re-evaluation of logs indicates a gas cap in the Jurassic level inblock 2 covering wells 103, 113 and 118. The gas cap can be used to sustainproduction rates from this block. As a result Well 103 will be reperforated inthe oil bearing reservoir below the gas cap. There will be short term reductionin production during the work over process. With the arrival from Schlumberger, of our new operations manager, EssienUmoren, we are in the process of conducting an extensive petrophysical review ofwell data with a view to identifying new production zones and increasingproduction. An updated summary of the 2006 wells is shown below. Overall thefield has very good porosity and good oil saturation. Results of 2006 Drilling programme Well Depth Drilling Oil Zones Net Pay Oil Saturation % Porosity % Tested rate metres bopd metres Days 101 455 22 1 8 42% 31% 45 102 400 16 2 9.5 70% 29% 25 103 302 13 2 5.8 63% 29% 120 104 710 30 1 2.7 55% 27% 16 105 575 20 2 5 60% 28% 35 109 734 25 1 5.1 58% 35% TBT 118 400 14 2 3.1 52% 32% TBT Commenting on the results, Michael Masterman, CEO of Caspian said: "These recentresults from Well 109 and 118 demonstrate that we are consistently finding oilfrom our 2006 drilling programme and are building a solid production capacity." ENDS Enquiries: Caspian Holdings Plc Hoodless Brennan Parkgreen CommunicationsMichael Masterman Luke Cairns Justine Howarth / Ana RibeiroT: +44 (0) 7791288381 T: +44 (0) 20 7538 1166 T: +44 (0) 20 7493 3713www.caspianoil.co.uk Mr Dietmar Greil, Executive Director and Chief Operating Officer of CaspianHoldings Plc is a "qualified person" with over 20 years experience inExploration and Development in the oil industry. This press release has beenprepared under Mr Greil's supervision. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
21st Jun 201710:12 amRNSTPI Investor Evening
16th Jun 20179:57 amRNSPlacing to Directors to raise £100,000
14th Jun 20178:54 amRNSPlacing to Raise £650,000
14th Jun 20177:00 amRNSLa Parrilla Maiden JORC Reserves
30th May 20177:00 amRNSNotice of Annual General Meeting
17th May 20177:00 amRNSFinal Application for La Parrilla Grant
16th May 20179:41 amRNSDevelopment and Financing of La Parrilla Update
11th May 20177:00 amRNSIncrease in Grades and Quality of La Parrilla
3rd May 201712:20 pmRNSFinal Results for the Year Ended 31 December 2016
27th Apr 201711:37 amRNSChange to Significant Shareholder
12th Apr 20177:00 amRNSJig and Mill Contract Including Vendor Finance
9th Mar 20177:00 amRNSStrategic Review and Placing to raise £750k
19th Jan 20177:00 amRNSLa Parrilla Equipment Finance, Grants ,Development
17th Jan 20177:00 amRNSSão Martinho SMD-009 Hits 56.4m of Gold
2nd Dec 20161:14 pmRNSGrant of Share Options
18th Nov 20167:00 amRNSFirst Hole at São Martinho Intersects Gold
1st Nov 201611:52 amRNSPlacing to Raise £1 million
19th Oct 20167:00 amRNSLa Parrilla Commences Tungsten Shipments
17th Oct 20167:00 amRNSHigh Tin and Tungsten Grades at La Parrilla FTM
30th Sep 20167:00 amRNSHalf Yearly Report
26th Sep 20167:00 amRNSSão Martinho Gold Drilling Commences
23rd Sep 20169:42 amRNSInvestor Presentation - September 2016
22nd Sep 20167:00 amRNSProduction Commences at La Parrilla
1st Sep 20167:00 amRNSHigh Tungsten and Tin Grades from La Parrilla
19th Aug 20167:00 amRNSInvestor Presentation - 22 September 2016
17th Aug 20161:31 pmRNSPlacing Completes Finance Package for First Phase
16th Aug 20167:00 amRNSFinance & Offtake Package Secured for La Parrilla
27th Jul 20167:00 amRNSMining Starts at La Parrilla with First Mine Blast
25th Jul 201612:01 pmRNSNew Portuguese Licence Granted
20th Jul 20167:00 amRNSLa Parrilla Mine update
1st Jul 201610:45 amRNSIssue of Equity: Performance Shares
29th Jun 201612:59 pmRNSResults of Annual General Meeting
16th Jun 20161:32 pmRNSExercise of Warrants
9th Jun 20167:00 amRNSSão Martinho Gold Deposit Maiden JORC Estimate
1st Jun 20167:00 amRNSNotice of Annual General Meeting
27th May 20167:30 amRNSFinal Results for the Year Ended 31 December 2015
28th Apr 20169:56 amRNSWRES to present at Mining Capital Conference
18th Apr 20167:00 amRNSLa Parrilla Strong Metal Recovery Results
15th Mar 20167:00 amRNSPlacing to Raise additional £100k
11th Mar 20167:00 amRNSPlacing to raise £750,000
7th Mar 20167:00 amRNSLa Parrilla Scalable Development
2nd Mar 201611:35 amRNSResults at São Martinho and Tarouca
19th Feb 20167:00 amRNSInvestor Presentation - 2 March 2016
5th Feb 20167:49 amRNSLa Parrilla JORC estimate
21st Jan 20167:00 amRNSShare dealing
16th Dec 20152:42 pmRNSStrong Assay Results from La Parrilla Drilling
7th Dec 20157:00 amRNSDrilling at La Parrilla results
25th Nov 201511:03 amRNSLa Parrilla Mine Development Approval Granted
5th Nov 20157:00 amRNSPlacing to Raise £600k
27th Oct 20159:01 amRNSIncreased JORC Indicated Resource at Regua

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.