Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Caspian continues finding oil

18 Sep 2006 11:04

Caspian Holdings plc18 September 2006 18 September 2006 Caspian Holdings Plc ("Caspian" or "the Company") Caspian continues finding oil - update on wells 102, 104, 109 and 118 Caspian Holdings Plc (AIM: CSH), the oil and gas production and explorationCompany in Kazakhstan, issues a further set of positive results from thedrilling campaign at its Zhengeldy oil field. Commercial oil production rateshave been tested in wells 102 and 104 and the interpretation of log results onrecently drilled wells - 109 and 118 - shows good oil pays. Well 102 was perforated and tested at the interval, 178-180.5 metres and iscurrently producing 25 barrels of oil per day ("bopd"). Well 104 was perforatedand tested in early August and yielded production rates of 16 bopd. Well 109 was drilled to a depth of 734 metres in the south of Zhengeldy dry saltlake. Analysis of the open hole log results shows a good oil bearing reservoirbelow 170 metres with a gross pay of 13.9metres and a net pay of 5.1metres.Porosity in this well is high, at 35%, with oil saturation of 58%. Well 118 was drilled to a depth of 400 metres in the middle of the Zhengeldy drysalt lake, near the successful Well 103. Analysis of the open hole log resultsshows potentially two oil-bearing reservoirs between 255metres and 355metres.The best level is at 255metres with a gross pay of 4.9metres and a net pay of3.1metres with porosity of 32% and an oil saturation of 52%. It appears thatthere is a gas cap above the oil bearing level which should support higherproduction rates. Wells 109 and 118 will be perforated and tested during September and October. Detailed re-evaluation of logs indicates a gas cap in the Jurassic level inblock 2 covering wells 103, 113 and 118. The gas cap can be used to sustainproduction rates from this block. As a result Well 103 will be reperforated inthe oil bearing reservoir below the gas cap. There will be short term reductionin production during the work over process. With the arrival from Schlumberger, of our new operations manager, EssienUmoren, we are in the process of conducting an extensive petrophysical review ofwell data with a view to identifying new production zones and increasingproduction. An updated summary of the 2006 wells is shown below. Overall thefield has very good porosity and good oil saturation. Results of 2006 Drilling programme Well Depth Drilling Oil Zones Net Pay Oil Saturation % Porosity % Tested rate metres bopd metres Days 101 455 22 1 8 42% 31% 45 102 400 16 2 9.5 70% 29% 25 103 302 13 2 5.8 63% 29% 120 104 710 30 1 2.7 55% 27% 16 105 575 20 2 5 60% 28% 35 109 734 25 1 5.1 58% 35% TBT 118 400 14 2 3.1 52% 32% TBT Commenting on the results, Michael Masterman, CEO of Caspian said: "These recentresults from Well 109 and 118 demonstrate that we are consistently finding oilfrom our 2006 drilling programme and are building a solid production capacity." ENDS Enquiries: Caspian Holdings Plc Hoodless Brennan Parkgreen CommunicationsMichael Masterman Luke Cairns Justine Howarth / Ana RibeiroT: +44 (0) 7791288381 T: +44 (0) 20 7538 1166 T: +44 (0) 20 7493 3713www.caspianoil.co.uk Mr Dietmar Greil, Executive Director and Chief Operating Officer of CaspianHoldings Plc is a "qualified person" with over 20 years experience inExploration and Development in the oil industry. This press release has beenprepared under Mr Greil's supervision. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
28th Mar 20123:20 pmRNSIssue of Equity
7th Feb 20122:50 pmRNSCaspian announces £460,000 Placing
6th Feb 20129:30 amRNSOption Extension at La Parrilla Tungsten Mine
11th Jan 20127:00 amRNSDrilling Campaign Commences at La Parrilla
30th Dec 20117:00 amRNSCaspian Completes £210,000 Placing
19th Dec 201111:00 amRNSResult of General Meeting
30th Nov 20117:00 amRNSCaspian to acquire La Parrilla Tungsten Project
9th Sep 201111:48 amRNSHalf Yearly Report
1st Jul 201111:28 amRNSResult of AGM
24th Jun 201110:06 amRNSCaspian Completes £80,000 Placing
10th Jun 20117:00 amRNSAnnual Report and Notice of AGM
12th Apr 20114:51 pmRNSHolding in Company
29th Sep 20107:00 amRNSHalf Yearly Report
19th Jul 20104:50 pmRNSHolding in Company
9th Jul 201011:47 amRNSHolding in Company
7th Jul 20105:38 pmRNSDirector Shareholding
29th Jun 201011:18 amRNSResult of AGM
22nd Jun 201011:57 amRNSHolding in Company
14th Jun 20104:25 pmRNSOperational Update
14th Jun 20104:25 pmRNSCaspian Completes ?200,000 Placing
8th Jun 20103:07 pmRNSNotice of AGM and Annual Report
24th May 201011:00 amRNSFinal Results
9th Apr 20107:00 amRNSTrading Update
22nd Dec 20097:54 amRNSFirst Oil Shipment in Kentucky
30th Oct 20094:19 pmRNSIssue of Shares
12th Oct 20095:44 pmRNSStatement Regarding Share Price Movement
30th Sep 20093:45 pmRNSInterim Results
10th Jul 200911:54 amRNSTrading Update
29th Jun 200912:51 pmRNSResult of AGM and Issue of Equity
3rd Jun 20095:14 pmRNSCircular to Shareholders and Notice of AGM
28th May 20093:23 pmRNSIssue of Shares
22nd May 20093:29 pmRNSFinal Results
22nd May 20093:00 pmRNSDebt for Equity Swap Agreement
29th Apr 20099:23 amRNSTrading Update
11th Feb 200912:33 pmRNSKazakhstan Court Case Update and Trading Update
14th Jan 200912:47 pmRNSCaspian Completes ?42,000 Placement
14th Jan 20098:43 amRNSCaspian wins Initial Kazakhstan Court Case
25th Nov 200812:09 pmRNSCaspian Completes ?50,000 Placement
7th Nov 20088:42 amRNSDirectorate Change
26th Sep 200811:48 amRNSInterim Results
18th Sep 20087:00 amRNSExpands Black Gold Lease Holdings in Irvine Field
1st Sep 200812:52 pmRNSZhengeldy Regulatory Update
4th Aug 200811:27 amRNSResult of AGM
25th Jul 20087:00 amRNSDirector Shareholding
17th Jul 20081:51 pmRNSHolding in Company
9th Jul 20088:30 amRNSHolding in Company
8th Jul 200810:44 amRNSFuther Expansion into the USA
27th Jun 20088:00 amRNSApproval to Restart Productio
27th Jun 20087:00 amRNSAnnual Report and Accounts
28th May 20089:01 amRNSPlacing and USA Lease Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.