Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. View here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Caspian continues finding oil

18 Sep 2006 11:04

Caspian Holdings plc18 September 2006 18 September 2006 Caspian Holdings Plc ("Caspian" or "the Company") Caspian continues finding oil - update on wells 102, 104, 109 and 118 Caspian Holdings Plc (AIM: CSH), the oil and gas production and explorationCompany in Kazakhstan, issues a further set of positive results from thedrilling campaign at its Zhengeldy oil field. Commercial oil production rateshave been tested in wells 102 and 104 and the interpretation of log results onrecently drilled wells - 109 and 118 - shows good oil pays. Well 102 was perforated and tested at the interval, 178-180.5 metres and iscurrently producing 25 barrels of oil per day ("bopd"). Well 104 was perforatedand tested in early August and yielded production rates of 16 bopd. Well 109 was drilled to a depth of 734 metres in the south of Zhengeldy dry saltlake. Analysis of the open hole log results shows a good oil bearing reservoirbelow 170 metres with a gross pay of 13.9metres and a net pay of 5.1metres.Porosity in this well is high, at 35%, with oil saturation of 58%. Well 118 was drilled to a depth of 400 metres in the middle of the Zhengeldy drysalt lake, near the successful Well 103. Analysis of the open hole log resultsshows potentially two oil-bearing reservoirs between 255metres and 355metres.The best level is at 255metres with a gross pay of 4.9metres and a net pay of3.1metres with porosity of 32% and an oil saturation of 52%. It appears thatthere is a gas cap above the oil bearing level which should support higherproduction rates. Wells 109 and 118 will be perforated and tested during September and October. Detailed re-evaluation of logs indicates a gas cap in the Jurassic level inblock 2 covering wells 103, 113 and 118. The gas cap can be used to sustainproduction rates from this block. As a result Well 103 will be reperforated inthe oil bearing reservoir below the gas cap. There will be short term reductionin production during the work over process. With the arrival from Schlumberger, of our new operations manager, EssienUmoren, we are in the process of conducting an extensive petrophysical review ofwell data with a view to identifying new production zones and increasingproduction. An updated summary of the 2006 wells is shown below. Overall thefield has very good porosity and good oil saturation. Results of 2006 Drilling programme Well Depth Drilling Oil Zones Net Pay Oil Saturation % Porosity % Tested rate metres bopd metres Days 101 455 22 1 8 42% 31% 45 102 400 16 2 9.5 70% 29% 25 103 302 13 2 5.8 63% 29% 120 104 710 30 1 2.7 55% 27% 16 105 575 20 2 5 60% 28% 35 109 734 25 1 5.1 58% 35% TBT 118 400 14 2 3.1 52% 32% TBT Commenting on the results, Michael Masterman, CEO of Caspian said: "These recentresults from Well 109 and 118 demonstrate that we are consistently finding oilfrom our 2006 drilling programme and are building a solid production capacity." ENDS Enquiries: Caspian Holdings Plc Hoodless Brennan Parkgreen CommunicationsMichael Masterman Luke Cairns Justine Howarth / Ana RibeiroT: +44 (0) 7791288381 T: +44 (0) 20 7538 1166 T: +44 (0) 20 7493 3713www.caspianoil.co.uk Mr Dietmar Greil, Executive Director and Chief Operating Officer of CaspianHoldings Plc is a "qualified person" with over 20 years experience inExploration and Development in the oil industry. This press release has beenprepared under Mr Greil's supervision. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
7th Oct 201511:02 amRNSCAA / Portalegre Licence Expanded
30th Sep 20159:00 amRNSHalf Yearly Report
29th Sep 201511:01 amRNSLa Parrilla FTM Development Update
9th Sep 20159:17 amRNSHolding(s) in Company
26th Aug 20152:49 pmRNSChanges to Significant Shareholders
10th Aug 20157:00 amRNSRégua drilling update
14th Jul 20157:00 amRNSEnvironmental Approval for La Parrilla
10th Jul 20157:00 amRNSFast Track Mine Infill Drilling Advances
26th Jun 201511:11 amRNSPlacing and Appointment of Broker
19th Jun 20151:30 pmRNSResult of AGM
16th Jun 20157:00 amRNSLa Parrilla Definition Study Completed
5th Jun 20157:00 amRNSFast Track Mine Infill Drilling Advances
26th May 20157:01 amRNSNotice of AGM
22nd May 20157:00 amRNSFinal Results for the Year Ended 31 December 2014
12th May 20157:00 amRNSUpdate on CAA / Portalegre
28th Apr 20157:00 amRNSExcellent Drilling Results Continue at Regua
13th Apr 20159:51 amRNSBergen Facility Fully Repaid
26th Mar 20152:17 pmRNSAdditional Placing of 200,000 GBP
20th Mar 20158:39 amRNSCorrection: Repayment of Bergen Facility
20th Mar 20157:00 amRNSRepayment of Bergen Facility and Placing
9th Mar 20159:28 amRNSRegua Project Update
13th Feb 201510:59 amRNSLa Parrilla Mine and Tailings Update
6th Feb 20159:25 amRNSChanges to Significant Shareholders
20th Jan 20151:09 pmRNSPlacing to Raise £1.4m
29th Dec 201412:31 pmRNSDirector Dealing
24th Dec 201411:11 amRNSIssue of Equity
24th Dec 20147:00 amRNSLa Parrilla Operations and Development Update
18th Dec 20147:00 amRNSDirectorate Change
15th Dec 20147:00 amRNSLa Parrilla Mine Connects to Spanish Grid
4th Dec 20147:00 amRNSCAA / Portalegre Drilling Campaign Commences
24th Nov 20147:00 amRNSRegua Development Campaign Commences
19th Nov 20147:00 amRNSLa Parrilla Tailings Plant Improvement Update
4th Nov 20147:00 amRNSDirector Dealing
30th Oct 20147:00 amRNSStrong Trenching Exploration Results
27th Oct 20147:00 amRNSBergen First Closing Completed
22nd Oct 20147:00 amRNSTrading and operations update
16th Oct 201410:56 amRNSConvertible security & private placement facility
30th Sep 20147:00 amRNSInterim results to 30 June 2014
17th Sep 20147:00 amRNSTarouca Drilling Programme Completion
15th Sep 20141:15 pmRNSLa Parrilla Tailings Update
8th Sep 201410:43 amRNSLa Parrilla mine development plan
11th Aug 20147:00 amRNSFirst Tungsten Shipment Cash Proceeds
8th Aug 20145:20 pmRNSDirector Shareholding
29th Jul 20141:35 pmRNSPlacing to raise £1.2 million
28th Jul 20147:00 amRNSTarouca Drilling Update
10th Jul 20147:00 amRNSProduction Ramp-up at La Parrilla Tailings
27th Jun 20143:32 pmRNSShare transfer
23rd Jun 20147:00 amRNSTrial Mining Licence Awarded at Régua
20th Jun 201412:41 pmRNSResult of AGM
27th May 20144:44 pmRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.