Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Drilling update - La Parrilla

16 Apr 2012 07:00

RNS Number : 3447B
Caspian Holdings plc
16 April 2012
 



 

Caspian Holdings Plc

 

 

 

 

16 April 2012

 

Caspian Holdings Plc

("Caspian" or the "Company")

 

 

 Drilling Update: High Grade Results from First Hole at La Parrilla Tungsten Project

 

 

Caspian (AIM:CSH), is pleased to provide an update on drilling at its La Parrilla tungsten project, located in southwest Spain. Caspian has an option to purchase a 100% interest in La Parrilla, a former producing open pit mine which closed in the 1980s.

 

Caspian has drilled three out of five holes in a 1,500 metre diamond core drilling campaign to appraise extensions to the La Parrilla orebody which is targeting an open zone to the west of the existing open pit. To date a total of 887.4 meters have been drilled in three vertical holes. The 4th hole is underway.

 

Assay results have been received for the first hole IP-01 which indicate thick high grade intersections well above the average mine grade of 0.1% WO3. All holes drilled to date have intersected visible tungsten mineralisation. Significant intersections from the first hole include:

 

HOLE

FROM

TO

INTERVAL

TRUE THICKNESS

WO3

Sn

m

m

m

m

%

%

IP-01

32.00

48.00

16.00

10.00

0.2755

0.0321

IP-01

108.00

144.00

36.00

22.50

0.3551

0.0104

IP-01

154.00

170.00

16.00

10.00

0.1257

0.0251

IP-01

202.00

226.00

24.00

15.00

0.0624

0.0057

 

Michael Masterman, Executive Chairman, commented: "We are pleased with the promising results of the drilling programme at La Parrilla, which is testing the western extension of the high grade mineralisation. The results should enable us to commence initial mine development planning and proceed to exercise the acquisition option."

 

The technical design of the La Parrilla tailings project has now been finalised and approval documents submitted to the mining authorities. All approvals are expected to be granted by the end of Q3 2012. Annual plant feed will be 330,000 tonnes and annual production is anticipated to be 28,000 MTU Tungsten (W) and 26 tonnes Tin (Sn), which will deliver over 7million per annum in revenue at current tungsten and tin prices.

 

 

Enquiries:

Caspian Holdings Plc

Grant Thornton Corporate Finance - Nomad

Michael Masterman

Gerry Beaney / Melanie Frean / Jen Hatter

T: +44 (0) 7791 288381

T: +44 (0) 20 7383 5100

www.caspianoil.co.uk

Simple Investments - Broker

Gable Communications

Andy Thacker / Nick Emerson

Justine James

T: +44 (0) 1483 413500

T: +44 (20 7193 7463

www.simple-investments.co.uk

M: +44 (0) 7525 324431

 

About La Parrilla

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site is accessed directly from the highway along a 3km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The historic mine resource estimated by SRK in 2008 is 36.0m tonnes at 0.09% WO3 making it one of the largest tungsten deposits in the western world.

 

Thetailings project is expected to be in production within the next 12-18 months (from December 2011). In 2010 a detailed survey of the coarse tailings dumps showed a total volume of 1.2 million cubic metres equivalent to 2.5 million tons.

 

The price of tungsten has increased rapidly over the last 3 years by more than double. The La Parrilla tailings deposit and tungsten mine development offer a low cost, high margin resource development opportunity for Caspian.

 

 

Technical information in this report has been prepared and approved for inclusion by Mr Fernando de la Fuente, who is a "qualified person" in respect of the AIM Rules for Companies with over 37 years experience in the Exploration and Mining Geology industry. Mr de la Fuente holds a B.Sc. in Geology and a MSc in Geology from the University of Granada in Spain. He is also a member of the Spanish College of Geologists (Number 49), the Spanish Society of Mineralogy, founder member of the Spanish Society of Geology, member of the Spanish Association of Applied Geology to Mineral Deposits, member of the Society for Mining, Metallurgy and Exploration, Inc., member of PDAC.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEASLDFSXAEFF
Date   Source Headline
26th May 20227:00 amRNSCancellation - W Resources plc
25th May 202212:33 pmRNSDelisting from AIM
23rd May 20225:30 pmRNSW Resources
23rd May 20227:00 amRNSDrawdown from BlackRock Additional Loan Facility
25th Apr 20227:02 amRNSResignation of Nomad and Broker
8th Apr 202212:36 pmRNSHolding(s) in Company
5th Apr 20227:40 amRNSStatement re. Suspension
5th Apr 20227:30 amRNSSuspension - W Resources Plc
18th Mar 20227:00 amRNSLa Parrilla Update
2nd Mar 20227:00 amRNSBlackRock Additional US$5.5m Loan Facility
24th Feb 20227:00 amRNSFinance Update
18th Feb 20225:30 pmRNSFinance Update
15th Feb 202211:06 amRNSSecond Price Monitoring Extn
15th Feb 202211:01 amRNSPrice Monitoring Extension
15th Feb 20228:16 amRNSProduction Report and Finance Update
31st Jan 20227:00 amRNSTotal Voting Rights
11th Jan 20228:01 amRNSHolding(s) in Company
5th Jan 20227:00 amRNSLa Parrilla Update and Placing for £0.83m
1st Dec 202110:45 amRNSTotal Voting Rights
15th Nov 20212:12 pmRNSPlacing to Raise £750,000
1st Nov 20217:03 amRNSRégua Awarded Mining Licence and Portugal Update
21st Oct 20217:00 amRNSQ3 2021 Production Report
11th Oct 20217:00 amRNSAppointment of Non-executive Director
11th Oct 20217:00 amRNSBoard Change and Management Update
5th Oct 20215:31 pmRNSTotal Voting Rights
30th Sep 20217:00 amRNSHalf-year Report to 30 June 2021
24th Sep 20212:00 pmRNSPrice Monitoring Extension
24th Sep 20217:00 amRNSAtlas Conversion Notice & Total Voting Rights
15th Sep 20217:00 amRNSLa Parrilla Update
13th Sep 20217:00 amRNSAtlas Conversion Notice and Total Voting Rights
31st Aug 202112:00 pmRNSTotal Voting Rights
27th Aug 202111:12 amRNSPDMR Shareholding and Total Voting Rights
9th Aug 20217:00 amRNSLa Parrilla Update
4th Aug 20218:35 amRNSAtlas Conversion Notice and Total Voting Rights
15th Jul 20217:19 amRNSQ2 2021 Production Report
30th Jun 202111:58 amRNSResult of AGM
30th Jun 20217:00 amRNSTotal Voting Rights
28th Jun 20217:00 amRNSHolding(s) in Company
24th Jun 202111:30 amRNSAGM Arrangements
18th Jun 202111:43 amRNSDirector Subscription and additional share issues
16th Jun 20217:00 amRNSLa Parrilla: Completion of the 500,000m3 dam
4th Jun 20217:00 amRNSFinal Results and Notice of AGM
2nd Jun 20217:00 amRNSHolding(s) in Company
2nd Jun 20217:00 amRNSTotal Voting Rights
17th May 20214:40 pmRNSSecond Price Monitoring Extn
17th May 20214:36 pmRNSPrice Monitoring Extension
17th May 20217:00 amRNSPlacing to Raise £2.5m. Total Voting Rights
10th May 20217:00 amRNSExtremadura Government Grant Received
30th Apr 20217:00 amRNSTotal Voting Rights
23rd Apr 20217:00 amRNSLa Parrilla Management Team and Shipments Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.