Q3 2021 Production Report

21 Oct 2021 07:00

RNS Number : 7889P
W Resources PLC
21 October 2021
 

 

 

 

21 October 2021

W Resources Plc

("W" or the "Company")

Q3 2021 Production Report

W Resources Plc (AIM:WRES), the tungsten, tin and gold mining company with assets in Spain and Portugal, announces its Q3 2021 quarterly production report for the La Parrilla mine in Spain, a period in which the Company achieved record tungsten recovery rates, grades and production.

Q3 Highlights

· Tungsten recovery rate of 58% up from 47% in Q2 2021 and tungsten concentrate recovery grades of 66.7% up 3% on Q2 2021

· Tungsten production of 168.3 tonnes ("t") up 58% on Q2 2021

· 11 shipments made - nine tungsten concentrate shipments (180t) and two tin concentrate shipments (40.8t)

· Construction of the second water dam underway with target completion in November 2021

· Robust commodity pricing with tungsten and tin increasing in the period

· Plant utilisation remains high at 87.1% compared to 88.2% in Q2 2021

· Moved to a 24 / 7 operation on 7 September 2021

Key Metrics

· A total of 279,196t of Run of Mine ("ROM") ore fed to the La Parrilla plant in Q3 2021

· Total tungsten and tin concentrate production of 192.4t

· Tungsten ("WO3") concentrate production of 168.3t

· Tin ("Sn") concentrate production of 24.1 dry metric tonnes ("dmt")

La Parrilla Production Summary

Whilst Q3 2021 recorded a number of record performance milestones, production was impacted by a number of challenges which resulted in an estimated production loss of circa 40t of tungsten concentrate, including:

· A number of power outages were caused by technical problems with the LNG generators. This has been resolved by the supplier after isolating the cause of the stoppages. To mitigate against future power outages the Company is installing an additional connection to the grid power supply. This is expected to be finalised in 2022 and will supply sufficient electricity to power the entire plant.

The pro-rata below adjusts for the variance in production days.

 

Q3 2021

Q2 2021

Variance

Variance

La Parrilla Production Summary

Actual

Actual

Comparison

Pro rata

WO3 contained metal (mtu)

11,229

6,919

62.3%

18.4%

Sn contained metal (dmt)

12.5

12.4

0.8%

-26.4%

Total contained metal (dmt)

124.8

81.6

53.0%

11.6%

('dmt' - dry metric tonnes, 'mtu' - metric tonne unit (1 mtu = 10kg of contained metal))

Michael Masterman, Chairman of W Resources, commented: "Q3 2021 was our best performing quarter to date and we expect to see this growth continue as we head towards the end of the year. Notwithstanding a number of challenges towards the end of the quarter, the result is testament to the management team at the La Parrilla mine which reacted quickly to minimise any disruption.

"In September, the Extremadura region of Spain, where the La Parrilla mine is located, experienced torrential rain fall for a period of time. Although the mine continued to work, production did slow due to the wet feed being fed into the plant. The team at La Parrilla is looking to introduce a silo to hold a minimum of one weeks' supply of dry stock which should negate the problems caused by similar flash flooding.

"Work at the mine has continued with new staff recruited and the introduction of a 24 / 7 operation seeing activities increase throughout the mine. In Q3 2021, work commenced on the second water dam which we expect will be completed in November 2021 and will serve to protect the mine from further water issues.

"Work continues apace and the La Parrilla team has a clear focus on increasing production and efficiencies as the reality of continuous production becomes the norm."

Q3 2021 Overview

The final phase of the project to provide a permanent solution to the water issues at La Parrilla, comprising of a second dam, is currently underway and is expected to be completed in November.

The recovery rate for tungsten during Q3 2021 was 58%, the highest to date for any quarter notwithstanding further work is needed to improve tin recoveries.

ROM feed increased to 279,196t for the quarter, another record and up 21% on Q2 2021.

11 shipments of concentrate were made during Q3 2021, almost doubling the number of shipments made in Q2 2021.

 

 

Q3 2021

Q2 2021

Variance

Variance

La Parrilla Production Summary

 

Actual

Actual

Comparison

Pro rata

 

 

 

 

 

 

ROM feed: tonnes mined (wmt)

 

279,196

231,613

21%

-12%

Strip ratio

 

3.53

2.89

22%

 

Jig plant: tonnes processed (dmt)

 

207,327

173,901

19%

-13%

 

 

 

 

 

 

WO3 feed grade (ppm)

 

934

855

9%

 

WO3 recovery (%)

 

58%

47%

23%

 

WO3 concentrate (dmt)

 

168.3

106.4

58%

15%

WO3 concentrate grade (%)

 

66.7

65.0

3%

 

WO3 contained metal (mtu)

 

11,229

6,919

62%

18%

 

 

 

 

 

 

Sn feed grade (ppm)

 

263

259

2%

 

Sn recovery (%)

 

23%

27%

-15%

 

Sn concentrate (dmt)

 

24.1

23.8

1%

-26%

Sn concentrate grade (%)

 

51.9

51.9

0%

-27%

Sn contained metal (dmt)

 

12.5

12.4

1%

-26%

 

 

 

 

 

 

Total concentrate (dmt)

 

192.4

130.2

48%

8%

Total contained metal (dmt)

 

124.8

81.6

53%

12%

Recovery

Tungsten recovery increased by 23% during Q3 2021, rising from 47% to 58%, although tin recovery fell by 15% from 27% to 23%.

Health and Safety

During the period there were three serious and one minor accident and three reported Covid-19 incidences. The Company believes its robust measures for controlling entry to and from the mine help in reducing Covid-19 events. Additional training is always provided to employees following serious accidents at the mine.

Plant Utilisation

Plant utilisation decreased to 87% slightly down from 88% in Q2 2021 - adversely impacted by the number of power outages experienced during the quarter.

Shipments

Nine shipments of tungsten concentrate totalling 180t and two shipments of tin concentrate totalling 40.8t were completed in Q3 2021.

 

Q3 2021

Q2 2021

Variance

Variance

La Parrilla Shipment Summary

Actual

Actual

Comparison

Pro rata

Tungsten concentrate (t)

180.0

100.0

80%

31%

Tin concentrate (t)

40.8

19.3

111%

54%

Commodity Pricing

European ammonium paratungstate ("APT") pricing remains strong and has further increased to US$315-320 as at 15 October 2021 - Fastmarkets MB.

The LME Tin price continues to strengthen reaching a three-month forward price of US$37,875 per tonne as per Fastmarkets MB, 14 October 2021.

Production Guidance

The Company is leasing a water treatment plant to improve water quality in the feed to the process plant and expects this measure to reduce maintenance issues and improve productivity.

Associated maintenance issues and supply chain bottlenecks for replacement parts have led to lower plant availability and as a result W Resources has adjusted its full year production guidance to between 650t and 750t of concentrate.

The Company expects Q4 2021 production to be greater than Q3 2021 production. However, production volumes will not reach the T2 run rate until Q1 2022.

The months of August and September were both EBITDA positive for W's operating subsidiary Iberian Resources Spain ("IRS") and the Company firmly expects Q4 2021 to be EBITDA positive as well for IRS with the mine at La Parrilla increasing production as the quarter progresses.

Employees

The number of staff employed at La Parrilla mine as at 30 September 2021 was 124 compared to 90 as at 30 June.

The historic La Parrilla mine production summary is as follows:

La Parrilla Historic Production

Q1 2020

Q2 2020

Q3 2020

Q4 2020

Q1 2021

Q2 2021

Q3 2021

Summary

Actual

Actual

Actual

Actual

Actual

Actual

Actual

No. of working days

 

 

39

52

45

54

74

 

 

 

 

 

 

 

 

ROM feed: tonnes mined (wmt)

273,656

253,256

171,454

261,841

196,094

231,613

279,196

Strip ratio

1.07

0.58

1.38

1.19

5.13

2.89

3.53

Jig plant: tonnes processed (dmt)

240,926

228,060

148,417

236,677

163,866

173,901

207,327

 

 

 

 

 

 

 

 

WO3 feed grade (ppm)

800

845

857

943

744

855

934

WO3 recovery (%)

17%

16%

30%

31%

32%

47%

58%

WO3 concentrate (dmt)

58.9

47.6

54.7

100

63.5

106.4

168.3

WO3 concentrate grade (%)

56.1

57.4

69.8

67.0

61.6

65.0

66.7

WO3 contained metal (mtu)

3,306

2,756

3,820

6,698

3,916

6,919

11,229

 

 

 

 

 

 

 

 

Sn feed grade (ppm)

282

307

181

321

228

259

263

Sn recovery (%)

22%

25%

37%

26%

44%

27%

23%

Sn concentrate (dmt)

23.3

41.2

22.9

33.4

28.9

23.8

24.1

Sn concentrate grade (%)

51.9

48.5

42.7

56.3

56.6

51.9

51.9

Sn contained metal (dmt)

12.1

20.0

9.8

18.8

16.3

12.4

12.5

 

 

 

 

 

 

 

 

Total concentrate (dmt)

82.2

88.8

77.6

133.4

92.4

130.2

192.4

Total contained metal (dmt)

45.2

47.6

48

85.8

55.5

81.6

124.8

Shipments

The historic tungsten and tin concentrate shipments from the La Parrilla mine are as follows:

 

Q1 2020

Q2 2020

Q3 2020

Q4 2020

Q1 2021

Q2 2021

Q3 2021

 

Actual

Actual

Actual

Actual

Actual

Actual

Actual

Tungsten concentrate (t)

30.1

58.9

62.1

100.2

59.2

100.0

180.0

Tin concentrate (t)

20.2

20.6

38.1

26.1

20.0

19.3

40.8

The information contained within this announcement is deemed to constitute inside information as stipulated under the retained EU law version of the Market Abuse Regulation (EU) No. 596/2014 (the "UK MAR") which is part of UK law by virtue of the European Union (Withdrawal) Act 2018. The information is disclosed in accordance with the Company's obligations under Article 17 of the UK MAR. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

Enquiries:

W Resources Plc

Paul Hailes

investor@wresources.com

www.wresources.com

Grant Thornton UK LLP

Colin Aaronson / Harrison Clarke / Lukas Girzadas

T: +44 (0) 20 7383 5100

Alternative Resource Capital / Shard Capital

Alex Wood

T:+44 (0) 207 186 9004

www.altrescap.com

Damon Heath

T:+44 (0) 207 186 9952

www.shardcapital.com

Alma PR

Justine James

M: +44 (0) 7525 324431

wres@almapr.co.uk

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLMBBATMTJTMMB
Date   Source Headline
26th May 20227:00 amRNSCancellation - W Resources plc
25th May 202212:33 pmRNSDelisting from AIM
23rd May 20225:30 pmRNSW Resources
23rd May 20227:00 amRNSDrawdown from BlackRock Additional Loan Facility
25th Apr 20227:02 amRNSResignation of Nomad and Broker
8th Apr 202212:36 pmRNSHolding(s) in Company
5th Apr 20227:40 amRNSStatement re. Suspension
5th Apr 20227:30 amRNSSuspension - W Resources Plc
18th Mar 20227:00 amRNSLa Parrilla Update
2nd Mar 20227:00 amRNSBlackRock Additional US$5.5m Loan Facility
24th Feb 20227:00 amRNSFinance Update
18th Feb 20225:30 pmRNSFinance Update
15th Feb 202211:06 amRNSSecond Price Monitoring Extn
15th Feb 202211:01 amRNSPrice Monitoring Extension
15th Feb 20228:16 amRNSProduction Report and Finance Update
31st Jan 20227:00 amRNSTotal Voting Rights
11th Jan 20228:01 amRNSHolding(s) in Company
5th Jan 20227:00 amRNSLa Parrilla Update and Placing for £0.83m
1st Dec 202110:45 amRNSTotal Voting Rights
15th Nov 20212:12 pmRNSPlacing to Raise £750,000
1st Nov 20217:03 amRNSRégua Awarded Mining Licence and Portugal Update
21st Oct 20217:00 amRNSQ3 2021 Production Report
11th Oct 20217:00 amRNSAppointment of Non-executive Director
11th Oct 20217:00 amRNSBoard Change and Management Update
5th Oct 20215:31 pmRNSTotal Voting Rights
30th Sep 20217:00 amRNSHalf-year Report to 30 June 2021
24th Sep 20212:00 pmRNSPrice Monitoring Extension
24th Sep 20217:00 amRNSAtlas Conversion Notice & Total Voting Rights
15th Sep 20217:00 amRNSLa Parrilla Update
13th Sep 20217:00 amRNSAtlas Conversion Notice and Total Voting Rights
31st Aug 202112:00 pmRNSTotal Voting Rights
27th Aug 202111:12 amRNSPDMR Shareholding and Total Voting Rights
9th Aug 20217:00 amRNSLa Parrilla Update
4th Aug 20218:35 amRNSAtlas Conversion Notice and Total Voting Rights
15th Jul 20217:19 amRNSQ2 2021 Production Report
30th Jun 202111:58 amRNSResult of AGM
30th Jun 20217:00 amRNSTotal Voting Rights
28th Jun 20217:00 amRNSHolding(s) in Company
24th Jun 202111:30 amRNSAGM Arrangements
18th Jun 202111:43 amRNSDirector Subscription and additional share issues
16th Jun 20217:00 amRNSLa Parrilla: Completion of the 500,000m3 dam
4th Jun 20217:00 amRNSFinal Results and Notice of AGM
2nd Jun 20217:00 amRNSHolding(s) in Company
2nd Jun 20217:00 amRNSTotal Voting Rights
17th May 20214:40 pmRNSSecond Price Monitoring Extn
17th May 20214:36 pmRNSPrice Monitoring Extension
17th May 20217:00 amRNSPlacing to Raise £2.5m. Total Voting Rights
10th May 20217:00 amRNSExtremadura Government Grant Received
30th Apr 20217:00 amRNSTotal Voting Rights
23rd Apr 20217:00 amRNSLa Parrilla Management Team and Shipments Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.