The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update

28 Jan 2013 07:00

RNS Number : 4552W
W Resources PLC
28 January 2013
 



 

 

 

 

 

28 January 2013

 

 

W Resources Plc

("W" or the "Company")

 

Drilling Update - La Parrilla IP07, IP08 and IP09

 

W Resources (AIM:WRES), the tungsten and gold exploration and development company, announces the latest update on drilling at its La Parrilla tungsten project, located in southwest Spain, in which it has an exclusive option to purchase a 100% interest.

Drilling of the extension of the La Parrilla ore body is now complete, drill results are being progressively received and W expects to complete the compilation of a new JORC compliant resource estimate in the second quarter of 2013.

Assay results have been confirmed for core Holes 7, 8 and 9 of the extended La Parrilla drilling programme. Key highlights include 8 metres at 0.29% Tungsten Trioxide (WO3) in hole 9, three times the average grade of the current La Parrilla resource in hole 9. Holes 7, 8 and 9 were drilled to final depths of 200.0m, 200.0m and 250.50m and are located 640m, 470m and 200m, respectively, to the northwest of the main ore body and continue the series of strong results from the extension drilling programme.

Chairman of W, Michael Masterman, commented: "The Board continues to be encouraged by the results on the extension drilling programme, with the process of further delineating a more significant increase in both the grade and tonnage of the resource at La Parrilla nearing completion. Drilling has been completed on budget and on schedule and we expect positive results from the re-estimation of the resources incorporating these results."

With the final approval for the La Parrilla tailings project granted by the Mining Department of the regional authority of the Junta de Extremadura, (announced 22 January) the Company is making good progress towards first production in H2 2013.

W has completed 11 holes on its drilling programme with assays received on holes 1-9. The full weighted averaged results of Holes 7, 8 and 9 are shown in the tables below:

DRILL HOLE IP-09 (VERTICAL) 250.50 m LONG

FROM

TO

INT

TRUE THICKNESS

WO3 %

Sn %

86.00

94.00

8.00

6.93

0.286

0.011

118.00

122.00

4.00

3.46

0.063

0.089

184.00

200.00

16.00

13.86

0.081

0.007

228.00

236.00

8.00

6.93

0.114

0.011

 

 

 

 

 

DRILL HOLE IP-08 (VERTICAL) 200.0 m LONG

FROM

TO

INT

TRUE THICKNESS

WO3 %

Sn %

37.00

43.00

6.00

3.00

0.132

0.003

113.00

119.00

6.00

2.05

0.098

0.005

145.00

151.00

6.00

5.46

0.053

0.004

 

 

 

 

DRILL HOLE IP-07 (VERTICAL) 200.0 m LONG

FROM

TO

INT

TRUE THICKNESS

WO3 %

Sn %

69.00

77.00

8.00

5.68

0.017

0.010

109.00

117.00

8.00

4.56

0.041

0.009

109.00

111.00

2.00

1.14

0.145

0.009

 

The weighted average grades have been calculated for intersections through mineralised envelopes defined by quartz veining and no cut off grade has been used.

 

A detailed map of the La Parrilla site including the drill hole locations can be found on the Company's website at http://www.wresources.co.uk/projects/la-parrilla/

 

Enquiries:

W Resources Plc

Grant Thornton Corporate Finance - Nomad

Michael Masterman

Gerry Beaney / Melanie Frean / Jen Clarke

T: +44 (0) 20 7193 7463

T: +44 (0) 20 7383 5100

 www.wresources.co.uk

Simple Investments - Broker

Gable Communications

Andy Thacker / Nick Emerson

Justine James

T: +44 (0) 1483 413500

T: +44 (0) 20 7193 7463

www.simple-investments.co.uk

M: +44 (0) 7525 324431

 

About La Parrilla

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site is accessed directly from the highway along a 3km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The historic mine resource estimated by SRK in 2008 is 36.0m tonnes at 0.09% WO3, making it one of the largest tungsten deposits in the western world.

The technical design of the La Parrilla tailings project has now been finalised and the final approval has been granted by the Mining Department of the regional authority of the Junta de Extremadura. Annual plant feed will be 330,000 tonnes and annual production is anticipated to be 28,000 MTU Tungsten (W) and 26 tonnes Tin (Sn), which will deliver over €7million per annum in revenue at current tungsten and tin prices. The tailings project is expected to be in production in H2 2013.

The price of tungsten has increased rapidly over the last 3 years by more than double. The La Parrilla tailings deposit and tungsten mine development offer a low cost, high margin resource development opportunity for W Resources.

 

Sampling, Assaying and Quality Assurance / Quality Control (QA/QC) Measures

Drill sample intervals are reported as metres (m) down hole. True widths of mineralised intersections have been calculated assigning an average dip of the mineralised zones of 45º-55º for hole IP-07, 60º for hole IP-08 and 30º for hole IP-09. All drill core is transported by the Company personnel from drill site to a nearby secure storage facility for logging, by an experienced geologist, and sampling. The core is halved using a rotary diamond blade core saw, with one half of the core sent for analysis, while the other half is retained in the core boxes for reference. Sampling is mainly carried out over two-metre intervals.

All half-core samples are sent for preparation to ALS Minerals facility in Seville (Spain). The resulting pulps are shipped to their laboratory in Vancouver (Canada) for assay using the ME-MS81 method (38 elements by lithium borate fusion and ICP-MS). Samples exceeding the upper detection limit (10,000 ppm W) are re-assayed by the lithium borate fusion and XRF determination ME-XRF10 method. Tungsten assays are reported by ALS Minerals as W and converted to WO3 using a factor of 1.26108.

Reference samples (blanks, duplicates and certified standards) are routinely inserted in each sample batch as quality control measure in addition to the laboratory's own internal QA/QC standards and duplicates.

W Resources changed its name from Caspian Holdings plc in July 2012 to align with its revised strategy focussing on projects in the mining sector.

Technical information in this report has been prepared in accordance with the JORC Code and approved for inclusion by Mr Fernando de la Fuente, who is a "qualified person" in respect of the AIM Rules for Companies with over 37 years experience in the Exploration and Mining Geology industry. Mr de la Fuente holds a B.Sc. in Geology and a MSc in Geology from the University of Granada in Spain. He is also a member of the Spanish College of Geologists (Number 49), the Spanish Society of Mineralogy, founder member of the Spanish Society of Geology, member of the Spanish Association of Applied Geology to Mineral Deposits, member of the Society for Mining, Metallurgy and Exploration, Inc., member of PDAC.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBRMBTMBTTBBJ
Date   Source Headline
26th May 20227:00 amRNSCancellation - W Resources plc
25th May 202212:33 pmRNSDelisting from AIM
23rd May 20225:30 pmRNSW Resources
23rd May 20227:00 amRNSDrawdown from BlackRock Additional Loan Facility
25th Apr 20227:02 amRNSResignation of Nomad and Broker
8th Apr 202212:36 pmRNSHolding(s) in Company
5th Apr 20227:40 amRNSStatement re. Suspension
5th Apr 20227:30 amRNSSuspension - W Resources Plc
18th Mar 20227:00 amRNSLa Parrilla Update
2nd Mar 20227:00 amRNSBlackRock Additional US$5.5m Loan Facility
24th Feb 20227:00 amRNSFinance Update
18th Feb 20225:30 pmRNSFinance Update
15th Feb 202211:06 amRNSSecond Price Monitoring Extn
15th Feb 202211:01 amRNSPrice Monitoring Extension
15th Feb 20228:16 amRNSProduction Report and Finance Update
31st Jan 20227:00 amRNSTotal Voting Rights
11th Jan 20228:01 amRNSHolding(s) in Company
5th Jan 20227:00 amRNSLa Parrilla Update and Placing for £0.83m
1st Dec 202110:45 amRNSTotal Voting Rights
15th Nov 20212:12 pmRNSPlacing to Raise £750,000
1st Nov 20217:03 amRNSRégua Awarded Mining Licence and Portugal Update
21st Oct 20217:00 amRNSQ3 2021 Production Report
11th Oct 20217:00 amRNSAppointment of Non-executive Director
11th Oct 20217:00 amRNSBoard Change and Management Update
5th Oct 20215:31 pmRNSTotal Voting Rights
30th Sep 20217:00 amRNSHalf-year Report to 30 June 2021
24th Sep 20212:00 pmRNSPrice Monitoring Extension
24th Sep 20217:00 amRNSAtlas Conversion Notice & Total Voting Rights
15th Sep 20217:00 amRNSLa Parrilla Update
13th Sep 20217:00 amRNSAtlas Conversion Notice and Total Voting Rights
31st Aug 202112:00 pmRNSTotal Voting Rights
27th Aug 202111:12 amRNSPDMR Shareholding and Total Voting Rights
9th Aug 20217:00 amRNSLa Parrilla Update
4th Aug 20218:35 amRNSAtlas Conversion Notice and Total Voting Rights
15th Jul 20217:19 amRNSQ2 2021 Production Report
30th Jun 202111:58 amRNSResult of AGM
30th Jun 20217:00 amRNSTotal Voting Rights
28th Jun 20217:00 amRNSHolding(s) in Company
24th Jun 202111:30 amRNSAGM Arrangements
18th Jun 202111:43 amRNSDirector Subscription and additional share issues
16th Jun 20217:00 amRNSLa Parrilla: Completion of the 500,000m3 dam
4th Jun 20217:00 amRNSFinal Results and Notice of AGM
2nd Jun 20217:00 amRNSHolding(s) in Company
2nd Jun 20217:00 amRNSTotal Voting Rights
17th May 20214:40 pmRNSSecond Price Monitoring Extn
17th May 20214:36 pmRNSPrice Monitoring Extension
17th May 20217:00 amRNSPlacing to Raise £2.5m. Total Voting Rights
10th May 20217:00 amRNSExtremadura Government Grant Received
30th Apr 20217:00 amRNSTotal Voting Rights
23rd Apr 20217:00 amRNSLa Parrilla Management Team and Shipments Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.