Less Ads, More Data, More Tools Register for FREE

Pin to quick picksWRES.L Regulatory News (WRES)

  • There is currently no data for WRES

Drilling Update

28 Jan 2013 07:00

RNS Number : 4552W
W Resources PLC
28 January 2013
 



 

 

 

 

 

28 January 2013

 

 

W Resources Plc

("W" or the "Company")

 

Drilling Update - La Parrilla IP07, IP08 and IP09

 

W Resources (AIM:WRES), the tungsten and gold exploration and development company, announces the latest update on drilling at its La Parrilla tungsten project, located in southwest Spain, in which it has an exclusive option to purchase a 100% interest.

Drilling of the extension of the La Parrilla ore body is now complete, drill results are being progressively received and W expects to complete the compilation of a new JORC compliant resource estimate in the second quarter of 2013.

Assay results have been confirmed for core Holes 7, 8 and 9 of the extended La Parrilla drilling programme. Key highlights include 8 metres at 0.29% Tungsten Trioxide (WO3) in hole 9, three times the average grade of the current La Parrilla resource in hole 9. Holes 7, 8 and 9 were drilled to final depths of 200.0m, 200.0m and 250.50m and are located 640m, 470m and 200m, respectively, to the northwest of the main ore body and continue the series of strong results from the extension drilling programme.

Chairman of W, Michael Masterman, commented: "The Board continues to be encouraged by the results on the extension drilling programme, with the process of further delineating a more significant increase in both the grade and tonnage of the resource at La Parrilla nearing completion. Drilling has been completed on budget and on schedule and we expect positive results from the re-estimation of the resources incorporating these results."

With the final approval for the La Parrilla tailings project granted by the Mining Department of the regional authority of the Junta de Extremadura, (announced 22 January) the Company is making good progress towards first production in H2 2013.

W has completed 11 holes on its drilling programme with assays received on holes 1-9. The full weighted averaged results of Holes 7, 8 and 9 are shown in the tables below:

DRILL HOLE IP-09 (VERTICAL) 250.50 m LONG

FROM

TO

INT

TRUE THICKNESS

WO3 %

Sn %

86.00

94.00

8.00

6.93

0.286

0.011

118.00

122.00

4.00

3.46

0.063

0.089

184.00

200.00

16.00

13.86

0.081

0.007

228.00

236.00

8.00

6.93

0.114

0.011

 

 

 

 

 

DRILL HOLE IP-08 (VERTICAL) 200.0 m LONG

FROM

TO

INT

TRUE THICKNESS

WO3 %

Sn %

37.00

43.00

6.00

3.00

0.132

0.003

113.00

119.00

6.00

2.05

0.098

0.005

145.00

151.00

6.00

5.46

0.053

0.004

 

 

 

 

DRILL HOLE IP-07 (VERTICAL) 200.0 m LONG

FROM

TO

INT

TRUE THICKNESS

WO3 %

Sn %

69.00

77.00

8.00

5.68

0.017

0.010

109.00

117.00

8.00

4.56

0.041

0.009

109.00

111.00

2.00

1.14

0.145

0.009

 

The weighted average grades have been calculated for intersections through mineralised envelopes defined by quartz veining and no cut off grade has been used.

 

A detailed map of the La Parrilla site including the drill hole locations can be found on the Company's website at http://www.wresources.co.uk/projects/la-parrilla/

 

Enquiries:

W Resources Plc

Grant Thornton Corporate Finance - Nomad

Michael Masterman

Gerry Beaney / Melanie Frean / Jen Clarke

T: +44 (0) 20 7193 7463

T: +44 (0) 20 7383 5100

 www.wresources.co.uk

Simple Investments - Broker

Gable Communications

Andy Thacker / Nick Emerson

Justine James

T: +44 (0) 1483 413500

T: +44 (0) 20 7193 7463

www.simple-investments.co.uk

M: +44 (0) 7525 324431

 

About La Parrilla

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site is accessed directly from the highway along a 3km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The historic mine resource estimated by SRK in 2008 is 36.0m tonnes at 0.09% WO3, making it one of the largest tungsten deposits in the western world.

The technical design of the La Parrilla tailings project has now been finalised and the final approval has been granted by the Mining Department of the regional authority of the Junta de Extremadura. Annual plant feed will be 330,000 tonnes and annual production is anticipated to be 28,000 MTU Tungsten (W) and 26 tonnes Tin (Sn), which will deliver over €7million per annum in revenue at current tungsten and tin prices. The tailings project is expected to be in production in H2 2013.

The price of tungsten has increased rapidly over the last 3 years by more than double. The La Parrilla tailings deposit and tungsten mine development offer a low cost, high margin resource development opportunity for W Resources.

 

Sampling, Assaying and Quality Assurance / Quality Control (QA/QC) Measures

Drill sample intervals are reported as metres (m) down hole. True widths of mineralised intersections have been calculated assigning an average dip of the mineralised zones of 45º-55º for hole IP-07, 60º for hole IP-08 and 30º for hole IP-09. All drill core is transported by the Company personnel from drill site to a nearby secure storage facility for logging, by an experienced geologist, and sampling. The core is halved using a rotary diamond blade core saw, with one half of the core sent for analysis, while the other half is retained in the core boxes for reference. Sampling is mainly carried out over two-metre intervals.

All half-core samples are sent for preparation to ALS Minerals facility in Seville (Spain). The resulting pulps are shipped to their laboratory in Vancouver (Canada) for assay using the ME-MS81 method (38 elements by lithium borate fusion and ICP-MS). Samples exceeding the upper detection limit (10,000 ppm W) are re-assayed by the lithium borate fusion and XRF determination ME-XRF10 method. Tungsten assays are reported by ALS Minerals as W and converted to WO3 using a factor of 1.26108.

Reference samples (blanks, duplicates and certified standards) are routinely inserted in each sample batch as quality control measure in addition to the laboratory's own internal QA/QC standards and duplicates.

W Resources changed its name from Caspian Holdings plc in July 2012 to align with its revised strategy focussing on projects in the mining sector.

Technical information in this report has been prepared in accordance with the JORC Code and approved for inclusion by Mr Fernando de la Fuente, who is a "qualified person" in respect of the AIM Rules for Companies with over 37 years experience in the Exploration and Mining Geology industry. Mr de la Fuente holds a B.Sc. in Geology and a MSc in Geology from the University of Granada in Spain. He is also a member of the Spanish College of Geologists (Number 49), the Spanish Society of Mineralogy, founder member of the Spanish Society of Geology, member of the Spanish Association of Applied Geology to Mineral Deposits, member of the Society for Mining, Metallurgy and Exploration, Inc., member of PDAC.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBRMBTMBTTBBJ
Date   Source Headline
21st Jun 201710:12 amRNSTPI Investor Evening
16th Jun 20179:57 amRNSPlacing to Directors to raise £100,000
14th Jun 20178:54 amRNSPlacing to Raise £650,000
14th Jun 20177:00 amRNSLa Parrilla Maiden JORC Reserves
30th May 20177:00 amRNSNotice of Annual General Meeting
17th May 20177:00 amRNSFinal Application for La Parrilla Grant
16th May 20179:41 amRNSDevelopment and Financing of La Parrilla Update
11th May 20177:00 amRNSIncrease in Grades and Quality of La Parrilla
3rd May 201712:20 pmRNSFinal Results for the Year Ended 31 December 2016
27th Apr 201711:37 amRNSChange to Significant Shareholder
12th Apr 20177:00 amRNSJig and Mill Contract Including Vendor Finance
9th Mar 20177:00 amRNSStrategic Review and Placing to raise £750k
19th Jan 20177:00 amRNSLa Parrilla Equipment Finance, Grants ,Development
17th Jan 20177:00 amRNSSão Martinho SMD-009 Hits 56.4m of Gold
2nd Dec 20161:14 pmRNSGrant of Share Options
18th Nov 20167:00 amRNSFirst Hole at São Martinho Intersects Gold
1st Nov 201611:52 amRNSPlacing to Raise £1 million
19th Oct 20167:00 amRNSLa Parrilla Commences Tungsten Shipments
17th Oct 20167:00 amRNSHigh Tin and Tungsten Grades at La Parrilla FTM
30th Sep 20167:00 amRNSHalf Yearly Report
26th Sep 20167:00 amRNSSão Martinho Gold Drilling Commences
23rd Sep 20169:42 amRNSInvestor Presentation - September 2016
22nd Sep 20167:00 amRNSProduction Commences at La Parrilla
1st Sep 20167:00 amRNSHigh Tungsten and Tin Grades from La Parrilla
19th Aug 20167:00 amRNSInvestor Presentation - 22 September 2016
17th Aug 20161:31 pmRNSPlacing Completes Finance Package for First Phase
16th Aug 20167:00 amRNSFinance & Offtake Package Secured for La Parrilla
27th Jul 20167:00 amRNSMining Starts at La Parrilla with First Mine Blast
25th Jul 201612:01 pmRNSNew Portuguese Licence Granted
20th Jul 20167:00 amRNSLa Parrilla Mine update
1st Jul 201610:45 amRNSIssue of Equity: Performance Shares
29th Jun 201612:59 pmRNSResults of Annual General Meeting
16th Jun 20161:32 pmRNSExercise of Warrants
9th Jun 20167:00 amRNSSão Martinho Gold Deposit Maiden JORC Estimate
1st Jun 20167:00 amRNSNotice of Annual General Meeting
27th May 20167:30 amRNSFinal Results for the Year Ended 31 December 2015
28th Apr 20169:56 amRNSWRES to present at Mining Capital Conference
18th Apr 20167:00 amRNSLa Parrilla Strong Metal Recovery Results
15th Mar 20167:00 amRNSPlacing to Raise additional £100k
11th Mar 20167:00 amRNSPlacing to raise £750,000
7th Mar 20167:00 amRNSLa Parrilla Scalable Development
2nd Mar 201611:35 amRNSResults at São Martinho and Tarouca
19th Feb 20167:00 amRNSInvestor Presentation - 2 March 2016
5th Feb 20167:49 amRNSLa Parrilla JORC estimate
21st Jan 20167:00 amRNSShare dealing
16th Dec 20152:42 pmRNSStrong Assay Results from La Parrilla Drilling
7th Dec 20157:00 amRNSDrilling at La Parrilla results
25th Nov 201511:03 amRNSLa Parrilla Mine Development Approval Granted
5th Nov 20157:00 amRNSPlacing to Raise £600k
27th Oct 20159:01 amRNSIncreased JORC Indicated Resource at Regua

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.