UKOG Live PriceLast checked at - London Stock Exchange

Intraday UK Oil & Gas Share Chart

Update on Flow Test

16 Feb 2016 07:00

RNS Number : 1444P
UK Oil & Gas Investments PLC
16 February 2016
 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

Update on Flow Test

Horse Hill-1 Oil Discovery, Weald Basin, UK

Significant Oil Flows to Surface from Lower Kimmeridge Limestone

 

UK Oil & Gas Investments PLC (London AIM and ISDX: UKOG) announces that Horse Hill Developments Limited has informed the Company that light, 40-degree API, sweet oil has flowed naturally to surface from an 80-foot zone within the Lower Kimmeridge limestone interval at a depth of approximately 900 metres below ground level.

Flow commenced at around 10.00am GMT yesterday at an initial instantaneous rate in excess of 700 barrels per day using a 1-inch choke, in an approximate mix of 50:50 oil to water. The well was then choked back to 32/64 inches resulting in a steady early oil rate in excess of 463 barrels of oil per day over a further 7.3-hour period, in an approximate mix of over 99% oil and less than 1% water.

The Lower Kimmeridge flow period is planned to continue today at 0700 following an overnight shut-in from 1900 Monday. Upon completion, Phase 2 and Phase 3 operations will move to the shallower Upper Kimmeridge limestone and Portland sandstone zones at approximately 840 and 615 metres below ground level, respectively.

The HH-1 discovery well, the original exploration drilling phase originally completed at the end of 2014, is located within onshore exploration Licence PEDL137, on the northern side of the Weald Basin near Gatwick Airport. UKOG owns a 20.163% interest in PEDL137.

Stephen Sanderson, UKOG's Executive Chairman commented:

"This is a very significant event for the company and for oil and gas activity in the Weald basin of southern England. Importantly, tests so far show oil has flowed to the surface under its own pressure and has not, so far, required artificial lift.

The flow test, the first ever in the Lower Kimmeridge limestone within the Weald basin, provides proof that significant quantities of moveable oil exist within the Kimmeridge section of the well and can be brought to surface at excellent flow rates. In this case from a vertical well with minimal stimulation.

While these flow rates are significant and in excess of management's expectations, it should be borne in mind that the planned future use of a horizontal well and appropriate conventional reservoir stimulation techniques could likely increase flow rates even further.

We look forward to more news from the final test results from the Lower Kimmeridge limestone and the shallower tests. The Company will be starting the regulatory permit process forthwith, so we can return to the well to seek to demonstrate sustainable commercial production."

UKOG's interest in Horse Hill

The HH-1 well is located within onshore exploration Licence PEDL137, on the northern side of the Weald Basin near Gatwick Airport. UKOG owns a 30% direct interest in HHDL and a 1.02% interest in HHDL via its 6% interest in Angus Energy Limited. HHDL is a special purpose company that owns a 65% participating interest and operatorship of Licence PEDL137 and the adjacent Licence PEDL246 in the UK Weald Basin.

Qualified Person's Statement:

 

Stephen Sanderson, UKOG's Executive Chairman, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information, please contact:

UK Oil & Gas Investments PLC

Stephen Sanderson / Jason Berry Tel: 020 7440 0640

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / Mark Leonard Tel: 020 7220 1666

 

Square 1 Consulting (Public Relations)

David Bick / Brian Alexander Tel: 020 7929 5599

 

Glossary

 

choke

Device incorporating a fixed or variable orifice that is used to control fluid flow rate during testing of an exploratory discovery

degree API

A measure of the density of crude oil as defined by the American Petroleum Institute

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

extended flow test

a flow test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days maximum.

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

sandstone

a clastic sedimentary rock whose grains are predominantly sand-sized. The term is commonly used to imply consolidated sand or a rock made of predominantly quartz sand.

sweet oil or crude

A type of oil that contains less than 0.42% Sulphur

 

Notes to Editors:

The Company has interests in the following UK licences:

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

 

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field in stable production.

 

Baxters Copse 2

PEDL233

50%

UKOG Weald Limited

IGas Energy Plc

89.6

Reviewing economics of appraisal/ development well.

 

Brockham 1

PL234

3.6%

Angus Energy 5

Angus Energy 5

8.9

Drilling of sidetrack well being considered.

 

Holmwood 3

PEDL143

30%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

H-1 exploration commitment well planned.

 

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production.

 

Horse Hill 4

PEDL137

20.163%

Horse Hill Developments Ltd 6

Horse Hill Developments Ltd 6

99.3

Extended flow testing of HH-1

 

Horse Hill 4

PEDL246

20.163%

Horse Hill Developments Ltd 6

Horse Hill Developments Ltd 6

43.6

Extended flow testing of HH-1

 

Isle of Wight (Offshore) 3

P1916

77.5%

UKOG Solent Limited

UKOG Solent Limited

46.7

Preparing drilling planning submission

 

Isle of Wight (Onshore) 2 3

PEDL331

65%

UKOG

TBA

200.0

Preparing drilling planning submission

 

Lidsey 1

PL241

4.2%

Angus Energy 5

Angus Energy 5

5.3

Drilling of infill well being considered.

 

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Compiling Field Development Plan.

 

 

Notes:

 

1. Oil field currently in production.

 

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

 

4. Oil discovery pending flow testing.

 

5. UKOG has a 6% interest in Angus Energy. Angus Energy has a 70% interest in Lidsey and a 60% interest in Brockham.

 

6. UKOG has a direct 30% interest in HHDL, plus an indirect 1.02% interest via Angus Energy. HHDL has a 65% interest in PEDL137 and PEDL246.

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEADASFAEKEAF
Date   Source Headline
22nd Jan 201510:10 amRNSChange of Adviser
22nd Jan 20157:00 amRNSDismissal of Adviser
17th Dec 201412:11 pmRNSHorse Hill-1 Oil Discovery Update
21st Nov 20144:41 pmRNSExercise of Warrants
20th Nov 20147:00 amRNSChange of Adviser
18th Nov 20149:40 amRNSFinal Results
11th Nov 20149:43 amRNSUpdate on newly acquired UK oil assets
5th Nov 20148:00 amRNSHorse Hill-1 Provisional Results at TD
3rd Nov 201411:23 amRNSTotal Voting Rights
29th Oct 20147:00 amRNSUS$10m debt facility and UK 14th Round Application
27th Oct 20147:00 amRNSClosure of YAGM Swap
24th Oct 20147:00 amRNSPortland Oil Discovery, Horse Hill-1
20th Oct 201410:26 amRNSAcquisition Completion Replacement
20th Oct 20147:00 amRNSAcquisition Completion
16th Oct 201411:30 amRNSDrilling Update, Horse Hill-1, Weald Basin UK
8th Oct 20145:55 pmRNSPlacing and Total Voting Rights
6th Oct 20147:00 amRNSDrilling Report
29th Sep 20145:06 pmRNSEstablishment of Employee Benefit Trust
29th Sep 201411:00 amRNSDrilling Update, Horse Hill-1, Weald Basin UK
24th Sep 20141:00 pmRNSDrilling Update, Horse Hill-1, Weald Basin UK
19th Sep 20149:28 amRNSInvesting Policy Substantially Implemented
18th Sep 20142:00 pmRNSUpdate, Horse Hill-1, Weald Basin UK
4th Sep 20142:00 pmRNSIncrease in Horse Hill Acreage Holding
3rd Sep 20147:00 amRNSDrilling commences at Horse Hill
29th Aug 20144:42 pmRNSTotal Voting Rights
22nd Aug 20147:00 amRNSBoard Change
13th Aug 20144:42 pmRNSExercise of Warrants
13th Aug 20147:00 amRNSIncrease in Horse Hill interest to 20%
6th Aug 201412:00 pmRNSUpdate on Horse Hill
25th Jul 20147:00 amRNSIssue of Equity and Total Voting Rights
24th Jul 20147:00 amRNSNew Investment
24th Jul 20147:00 amRNSSale of UK assets for £1.5 million
21st Jul 20147:00 amRNSUpdate - Horse Hill
2nd Jul 20142:00 pmRNSLidsey Oil Field Update
30th Jun 20143:12 pmRNSUnaudited results for the 6 months ended 31 March
27th Jun 20145:07 pmRNSExercise of Warrants
27th Jun 20147:00 amRNSHorse Hill Development Update
16th Jun 20147:00 amRNSUpdate on Horse Hill-1 Well
11th Jun 20147:00 amRNSUpdate on Investment in Lidsey Oil Field
5th Jun 20142:38 pmRNSHolding(s) in Company
28th May 20144:33 pmRNSEquity Placement and Total Voting Rights
16th May 201410:00 amRNSUpdate on UK onshore oil investments
1st Apr 20147:00 amRNSUpdate - Brockham Oil Field, Weald Basin UK
31st Mar 201411:08 amRNSResult of AGM
26th Mar 20147:00 amRNSCapital Structure
20th Mar 201412:43 pmRNSPartners with Angus Energy for onshore bid round
13th Mar 20147:00 amRNSUpdate on investment
10th Mar 201412:06 pmRNSPosting of Annual Report and Notice of AGM
4th Mar 20147:00 amRNSUpdate on Investment
28th Feb 20144:57 pmRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.