We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0325
Bid: 0.03
Ask: 0.035
Change: 0.00 (0.00%)
Spread: 0.005 (16.667%)
Open: 0.0325
High: 0.0325
Low: 0.0325
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill-1 Provisional Results at TD

5 Nov 2014 08:00

RNS Number : 1873W
UK Oil & Gas Investments PLC
05 November 2014
 

For Immediate Release

5 November 2014

 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

 

Horse Hill-1 Provisional Results at TD, Weald Basin UK

 

 

UKOG today announces that the Horse Hill-1 well was successfully completed with a discovery in the Jurassic and has reached total depth ("TD") at 8,770 feet measured depth ("MD") in rocks of pre-Triassic Palaeozoic age, which were prognosed at that depth.

 

The well has been electrically logged from the previous casing point to TD and a vertical seismic profile ("VSP") has been acquired to correlate the well to the available 2D seismic data. The logs are now being analyzed along with all other relevant data from the well and the initial results are set out below.

 

In addition, the well is currently being prepared for future flow testing in the identified Jurassic age Portland Sandstone discovery.

 

 

Portland Discovery

 

The well is currently being prepared for testing and as a probable future oil production well from the Portland Sandstone oil discovery, where, as announced on 24 October 2014, a preliminary most likely estimate of 3.1 million barrels ("mmbbls") of gross in place oil has been calculated within the upper Portland from a 102-foot gross oil column, with a further most likely unrisked undiscovered gross oil in place volume of 16.8 mmbbls in a separate lower sand in the Portland interval located in an untested fault block immediately to the south.

 

On completion of the analysis of the electric logs and the VSP, Horse Hill Developments Ltd ("HHDL") as operator, intends to apply to the Department of Energy and Climate Control ("DECC") for permission to carry out a flow test on the Portland Sandstone.

 

 

Kimmeridge Limestone Potential

 

Geochemical studies, to determine oil source rock richness and thermal maturity, are being conducted on rock samples from the Kimmeridge Clay, Oxford Clay and Liassic Shale formations encountered in the well. The geochemical analyses will be integrated with other data in order to evaluate the potential for Horse Hill-1, and the area to the southwest, to have generated hydrocarbons resulting in the trapping of oil in the Portland and other reservoir objectives within the southern area of PEDL 137.

 

Preliminary analysis of samples from the Kimmeridge Clay immediately below the Portland Sandstones, in a section which also contains oil shows and multiple limestone sections individually up to 105 feet in thickness (refer RNS dated 16 October 2014), have higher than expected oil source potential with a measured total organic carbon content ("TOC") of over 5% by weight. The operator continues to investigate the conventional potential of the Kimmeridge Limestones in a possibly analogous situation to the nearby Balcombe oil discovery.

 

Triassic Target

 

The Triassic target, which although previously untested was believed to have potential for gas, was penetrated at 8,054 feet MD and an approximately 380-foot thick interval, interpreted to be equivalent to the Rhaetic and Mercia Mudstone formations, and was drilled without any observable reservoir rocks or moveable gas being encountered.

 

The Mercia Mudstone overlies and seals the Triassic Sherwood Sandstone oil pool of the Wytch Farm Oil Field in the Wessex Basin. The Horse Hill-1 well results suggest the prognosed Triassic reservoir rocks, equivalent to the Sherwood Sandstone, are not developed this far north in the basin, though they may be developed to the southwest closer to the center of the basin.

 

The Marriott 50 rig will be demobilized over the coming week from the well site and all equipment will be removed pending a future decision on testing and production.

 

 

David Lenigas, the Company's Chairman, commented:

 

"Whilst we are naturally disappointed that there was no gas discovery in the Triassic, we remain delighted that the well has made an oil discovery in the Jurassic Portland Sandstone and that further opportunities for additional oil potential have also been revealed by the well, particularly in the Kimmeridge Limestones, both in the licence block and in the wider Weald Basin, and that these are now in the process of being assessed.

 

"All the data from the well will now be fully analysed and a decision taken on the work necessary to appraise and develop the Portland discovery."

 

UKOG interest in Horse Hill

 

The Horse Hill-1 well is located on the northern side of the Weald Basin near Gatwick Airport. UKOG owns a 20% direct interest in Horse Hill Developments Ltd ("HHDL") and an additional 2.4% interest in HHDL by virtue of its 6% ownership in Angus Energy Limited ("Angus Energy"). Angus Energy owns 40% of HHDL. HHDL is a special purpose company that owns a 65% participating interest and operatorship of onshore licences PEDL 137 and the adjacent licence PEDL 246 in the UK Weald Basin. The participants in the Horse Hill-1 well are HHDL with a 65% working interest and Magellan Petroleum Corporation with a 35% interest. UKOG's net attributable interest in PEDL 137 and 246 is therefore 14.56%.

 

Competent Person's Statement

The information contained in this announcement has been reviewed and approved by Stephen Sanderson, Exploration Adviser to UKOG PLC who has over 33 years of relevant experience in the oil industry. Mr. Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

 

 

Glossary:

 

2D seismic

seismic data collected using the two-dimensional common depth point method

contingent resources

those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations, but the applied project(s) are not yet considered mature enough for commercial development due to one or more contingencies. Contingent Resources may include, for example, projects for which there are currently no viable markets, or where commercial recovery is dependent on technology under development, or where evaluation of the accumulation is insufficient to clearly assess commerciality

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

electric logs

tools used within the wellbore to measure the rock and fluid properties of surrounding rock formations

MD

measured depth

reservoir

a subsurface rock formation containing an individual natural accumulation of moveable petroleum that is confined by impermeable rock/formations

oil in place

the quantity of oil or petroleum that is estimated to exist originally in naturally occurring accumulations before any extraction or production

TD

total depth

TOC

total organic carbon - a measure of hydrocarbon source rock richness

TVDss

true vertical depth below a subsea datum

undiscovered

those quantities of petroleum which are estimated, as of a given date, to be contained within accumulations that have not been tested by drilling

VSP

vertical seismic profile

 

 

 

For further information, please contact:

 

UK Oil& Gas Investments PLC

David Lenigas / Donald Strang

Tel: 020 7440 0640

Beaumont Cornish (Nominated Adviser)

Roland Cornish / Michael Cornish

Tel: 020 7628 3396

Hume Capital Securities PLC (Corporate Broker)

David Lawman

Tel: 020 7101 7070

Square 1 Consulting (Public Relations)

David Bick/Mark Longson

 

Tel: 020 7929 5599

 

A copy of this announcement is available from the Company's website at www.ukogplc.com

 

-ENDS-

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGGRGGUPCUMA
Date   Source Headline
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.