The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0255
Bid: 0.024
Ask: 0.027
Change: 0.00 (0.00%)
Spread: 0.003 (12.50%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.0255
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Update on Investment

4 Mar 2014 07:00

RNS Number : 3987B
UK Oil & Gas Investments PLC
04 March 2014
 



 

For Immediate Release

4 March 2014

 

 

UK Oil & Gas Investments Plc

("UKOG" or the "Company")

Update on Investment

Work commences on Horse Hill-1 well in the UK Weald Basin

 

UKOG is pleased to announce that it has been informed by the operator that civil works have now commenced on the Horse Hill site in the UK Weald Basin in preparation for the drilling of the proposed 2,646 metre (8,680 feet) Horse Hill -1 well on the Horse Hill Prospect, which lies about 3km from Gatwick Airport and is designed to test a number of promising conventional oil and gas targets.

 

The Horse Hill-1 well, which is scheduled to be completed by the end of August 2014, is planned to test several conventional stacked oil targets at the proven productive Portland sandstone, Corallian sandstone and Great Oolite limestone levels in the well-defined Horse Hill Prospect. Gross prospective recoverable resources in these stratigraphic levels totalling a mean 87 million barrels ("mmbbls") have been estimated by the previous operator Magellan Petroleum Corporation. An additional mean 164 billion cubic feet ("bcf") of gross recoverable prospective gas resources were also estimated by Magellan Petroleum within the deeper Triassic play.

 

David Lenigas, the Company's Chairman, commented:

 

"The next 6 months should be an exciting time for the Company with not only the planned new side track well at Brockham next month and the new Lidsey-2 well after that, but with the drilling of the Horse Hill-1 well, one of the deepest wells to be drilled in the Weald Basin."

 

"Horse Hill has significant potential to discover oil, especially after the results of Esso in the 1960's, but the Company particularly excited about the potentially of locating significant convention gas deeper down the Horse Hill-1 well in the Triassic."

 

UKOG has a binding agreement in place to own a 7.5% interest in Horse Hill Development Ltd ("HHDL"), a special purpose company, which now owns a 65% participating interest and operatorship of onshore licence PEDL137 ("Horse Hill") in the UK Weald Basin. In addition, UKOG has a binding agreement to own a 6% interest in Angus Energy Limited ("Angus Energy") which owns 65% of HHDL. Both agreements should be finalised this month.

 

Horse Hill Wood Prospect:

 

The participants in the Horse Hill-1 well are HHDL with 65% and operator and Magellan Petroleum Corporation with a 35% interest.

 

As previously reported on 20 December 2013 (see hereafter), the 99.29 square kilometres (24,525 acre) Exploration and Development Licence No. 137 ("PEDL 137") is located in the Weald Basin in Surrey.

 

The Horse Hill Wood prospect lies about 3 kilometres from Gatwick Airport and covers an area of up to 16 square kilometres in the south-west of PEDL 137. The trap is a seismically defined tilted horst structure, similar to the Palmers Wood oil field which lies only about 20 kilometres to the north-east. The Collendean Farm-1 well, drilled by ESSO in 1964, lies on the north-eastern edge of the Horse Hill Wood structure and found good oil shows at various Jurassic levels. Recent seismic re-interpretation suggests that the Collendean Farm-1 well was drilled off structure on the downthrown side of the bounding fault and outside closure.

 

The Triassic reservoir has yet to be tested in this part of the Weald Basin and if present is likely to be gas charged.

 

The Horse Hill Wood Prospect's OIP and GIP and Gross Prospective Resources estimated by Magellan are summarised in Table 1 below.

 

Table 1: Horse Hill Prospect estimated OOIP, OGIP and Prospective Resources.

 

Target Reservoir

Oil

OIP

Upside Potential (mmbbls)

OIP

Mean (mmbbls)

Prospective Resources

Mean (mmbbls)

Upper Portland Sandstone

116

57

17

Lower Portland Sandstone

284

147

44

Corallian Sandstone

67

33

10

Greater Oolite Limestone

204

104

16

Total Oil

671

341

87

Target Reservoir

Gas

GIP

Upside Potential (bcf)

GIP

Mean (bcf)

Prospective Resources

Mean (bcf)

Triassic Sandstone

456

234

164

 

Competent Person's Statement:

 

The information contained in this report has been prepared by Magellan Petroleum (UK) Limited, and has been reviewed and signed off by Mr Mervyn Cowie BSc (Geology & Mineralogy), who has over 35 years' experience as a geologist. Mr Cowie is a Fellow of the Australian Institute of Mining and Metallurgy and is a competent person under Australian Stock Exchange Rules. The technical disclosure in this report complies with the SPE-PRMS standard.

 

Glossary:

 

MMSTB - million stock barrels

Bcf - billion cubic feet

OOIP - Original Oil in Place

OGIP - Original Gas in Place

Prospective Resources - Prospective resources are estimated volumes associated with undiscovered accumulations. These represent quantities of petroleum which are estimated, as of a given date, to be potentially recoverable from oil and gas deposits identified on the basis of indirect evidence but which have not yet been drilled. This class represents a higher risk than contingent resources since the risk of discovery is also added. For prospective resources to become classified as contingent resources, hydrocarbons must be discovered, the accumulations must be further evaluated and an estimate of quantities that would be recoverable under appropriate development projects prepared.

 

 

-END-

 

For further information, please contact:

 

UK Oil& Gas Investments PLC

Tel: 020 7440 0640

David Lenigas / Donald Strang

Beaumont Cornish (Nominated Adviser)

Tel: 020 7628 3396

Roland Cornish / Michael Cornish / Emily Staples

XCAP Securities PLC (Corporate Broker)

Tel: 020 7101 7070

David Lawman

Square 1 Consulting (Public Relations)

David Bick/Mark Longson

 

Tel: 020 7929 5599

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCJJMFTMBJMBJI
Date   Source Headline
3rd May 20244:28 pmRNSNotice of Annual General Meeting
3rd May 20247:00 amRNSEmployee Benefit Trust Share Subscription
2nd May 20247:00 amRNSLoan Reduction Update
1st May 20247:00 amRNSLoxley Gas Project Update
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.