Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUK Oil & Gas Regulatory News (UKOG)

Share Price Information for UK Oil & Gas (UKOG)

Share Price is delayed by 15 minutes
Get Live Data
0.0105    0.00 (0.00%)
Bid:
0.01
Ask:
0.011
Spread: 0.001 (10.00%)
Market Cap: £3.05m
UKOG Live PriceLast checked at - London Stock Exchange

Intraday UK Oil & Gas Share Chart

Drilling Update, Horse Hill-1, Weald Basin UK

29 Sep 2014 11:00

RNS Number : 8456S
UK Oil & Gas Investments PLC
29 September 2014
 



For Immediate Release

29 September 2014

 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

Drilling Update, Horse Hill-1, Weald Basin UK

 

 

UK Oil & Gas PLC (AIM: UKOG) today advises that the Horse Hill-1 well has now been drilled to the second casing point at 1,795 feet measured depth ("MD"), and the setting and cementing a 13 3/8-inch steel casing is now underway. The bottom of the well is currently located in the upper part of the Jurassic and the well has encountered the expected mud gas up to C3 (propane) and mineral fluorescence just above current well depth.

 

Geological analysis and mud logging from rock cuttings circulated out of the hole indicate that geological markers in the well are slightly shallower than initially prognosed based on seismic and the nearby Collendean - 1 well drilled by ESSO in 1964. The second casing point has been revised up from 1,865 feet MD to reflect this.

 

The Horse Hill-1 well is located on the northern side of UK Weald Basin near Gatwick Airport and is planned to drill to a Total Depth ("TD") of 8,680 feet measured depth ("MD") to test a number of conventional oil and gas targets.

 

The primary oil reservoir targets in this well lie in the Jurassic Portland Sandstone at about 2,200 feet true vertical depth below sea level ("TVD ss") and the Corallian Sandstone at about 3,440 feet TVD ss. There are also a number of secondary oil targets in the Jurassic aged formations, including the Great Oolite Limestone, estimated to be at 4,530 feet TVD ss.

 

After setting the 13 3/8-inch casing the well will be drilled in 12 ½-inch hole to a depth of approximately 5,900 feet MD where open-hole electric logs will be acquired through the prognosed oil reservoirs before setting a 9 5/8-inch casing. Then an 8 ½-inch hole will be drilled to TD in order to test for Triassic aged formations which are expected to contain gas.

 

UKOG owns a 20% direct interest in Horse Hill Developments Ltd ("HHDL") and an additional 2.4% interest in HHDL by virtue of its 6% ownership in Angus Energy Limited ("Angus Energy"). Angus Energy owns 40% of HHDL.

 

HHDL is a special purpose company that owns a 65% participating interest and operatorship of onshore licences PEDL137 and the adjacent licence PEDL 246 in the UK Weald Basin. The participants in the Horse Hill-1 well are HHDL with a 65% working interest and Magellan with a 35% interest.

 

 

David Lenigas, the Company's Chairman, commented:

 

"Progress on this well has so far been encouraging on all fronts and we are pleased to see that we are now setting the second casing in a good seal just above the first of the primary targets in the Portland."

 

Glossary:

 

up to C3 (propane) - hydrocarbon gas liquids from spectrometry showing the presence of C1 (methane), C2

(ethane) and C3 (propane)

MD - measured depth

mineral florescence - light emitted by natural minerals showing, in some circumstances, the presence of

hydrocarbons

mud gas - gases recovered from the drilling fluids (mud)

TD - total depth

TVDss - true vertical depth below sea level

 

 

For further information, please contact:

 

UK Oil& Gas Investments PLC

David Lenigas / Donald Strang

Tel: 020 7440 0640

Beaumont Cornish (Nominated Adviser)

Roland Cornish / Michael Cornish

Tel: 020 7628 3396

Hume Capital Securities PLC (Corporate Broker)

David Lawman

Tel: 020 7101 7070

Square 1 Consulting (Public Relations)

David Bick/Mark Longson

 

Tel: 020 7929 5599

 

 

-ENDS-

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCKKLBLZKFXBBX
Date   Source Headline
5th May 20267:30 amRNSRestoration - UK Oil & Gas Plc
5th May 20267:01 amRNSHorse Hill – Retrospective Planning Application
5th May 20267:00 amRNSAnnual Accounts for year ended 30 September 2025
1st Apr 20267:30 amRNSSuspension - UK Oil & Gas plc
1st Apr 20267:00 amRNSTemporary suspension of trading on AIM
25th Mar 20267:00 amRNSUKEn signs MOU with Wales & West Utilities
5th Feb 20267:00 amRNSBroadford Bridge Well Abandonment Completed
18th Dec 20254:07 pmRNSHolding(s) in Company
16th Dec 20253:22 pmRNSHolding(s) in Company
15th Dec 20254:35 pmRNSHolding(s) in Company
8th Dec 202510:13 amRNSHolding(s) in Company
8th Dec 202510:10 amRNSHolding(s) in Company
26th Nov 202510:57 amRNSHolding(s) in Company
24th Nov 20255:27 pmRNSHolding(s) in Company
21st Nov 20257:00 amRNSAdditional funding for UKEn Hydrogen projects
18th Nov 20256:04 pmRNSHolding(s) in Company
27th Oct 20257:00 amRNSHolding(s) in Company
24th Oct 202512:30 pmRNSHolding(s) in Company
15th Oct 20258:59 amRNSHolding(s) in Company
13th Oct 202512:11 pmRNSReplacement: Results six-month ended 31 March 2025
6th Oct 20257:00 amRNSFurther funding for UKEn Hydrogen projects
3rd Oct 202512:31 pmRNSAdditional funding for UKEn Hydrogen projects
2nd Oct 20257:00 amRNSSuccessful funding for UKEn Hydrogen projects
1st Oct 20258:45 amRNSUKEn signs MOU with National Gas
1st Oct 20257:30 amRNSRestoration - UK Oil & Gas Plc
30th Sep 20256:00 pmRNSResults for six-month period ended 31 March 2025
30th Sep 20256:00 pmRNSAnnual Accounts for year ended 30 September 2024
2nd Sep 202511:56 amRNSResult of General Meeting
8th Aug 20257:00 amRNSNotice of General Meeting
7th Aug 20257:00 amRNSEmployee Benefit Trust Share Subscription
29th Jul 20254:31 pmRNSAnnual Report and Accounts Publication Update
3rd Jul 20257:00 amRNSSale of UKOG (GB) Limited
30th Jun 20255:59 pmRNSDelay to the Publication of the Interim Results
15th Apr 20257:00 amRNSSignificant Horndean Reserves Increase
2nd Apr 202511:01 amRNSHolding(s) in Company
1st Apr 20257:30 amRNSSuspension - UK Oil & Gas plc
28th Mar 202512:59 pmRNSDelay in Annual Results and temporary suspension
17th Mar 20257:00 amRNSUK Economic Impact of Dorset H2 Storage
11th Mar 20257:00 amRNSDorset green hydrogen generation and import MOUs
21st Feb 20257:00 amRNSSuccessful Funding for South Dorset H2 Storage
10th Feb 20257:00 amRNSSignificant Horndean Production Increase
27th Jan 20257:00 amRNSUKEn South Dorset Hydrogen Storage Project Update
22nd Nov 20247:00 amRNSRetail Offer Results
19th Nov 20247:01 amRNSRetail Offer
19th Nov 20247:00 amRNSPlacing & Retail Offer to fund new H2 storage site
17th Sep 20247:00 amRNSBoard Appointment
9th Sep 20247:00 amRNSSolent Cluster Hydrogen Storage LOS
21st Aug 202412:11 pmRNSResult of General Meeting
21st Aug 20247:00 amRNSSecond Dorset hydrogen storage site
8th Aug 20247:00 amRNSResults of Retail Offer

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.