Operational Update

10 Oct 2017 17:18

RNS Number : 2438T
UK Oil & Gas Investments PLC
10 October 2017
 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

Operational Update

 

Oil & Gas Recovered to Surface, Revised Flow Test and Workover Programme Planned,

Broadford Bridge -1z Kimmeridge Limestone Discovery, PEDL234, Weald Basin, UK

UK Oil & Gas Investments PLC (London AIM: UKOG) is pleased to announce that it has recovered measurable volumes of light oil and solution hydrocarbon gas to surface from the Kimmeridge reservoir section during well clean-up operations, at its 100% owned Broadford Bridge-1z ("BB-1z") exploration well, located in licence PEDL234. The well has also free flowed for short periods during the well clean-up sequence in which spent completion fluids mixed with hydrocarbons were returned to surface. Well clean-up operations, utilising a high capacity linear rod pump, continue. Further developments will be reported in due course

To ensure that the flow testing of Kimmeridge reservoir zones is fully optimised, the Company will proceed ahead to workover the well and implement a revised testing programme.  The well clean-up operation will continue, then the current multi-zone completion assembly will be retrieved, the well worked over and flow tested sequentially over multiple, individual reservoir zones. Additional perforated zones will be added to the existing 1064 ft aggregate perforated section.

This operationally more flexible test operation will utilise a similar methodology to that successfully undertaken at the Horse Hill oil discovery, albeit with a much-increased initial lifting capability. The rig-less test will involve both nitrogen lifting and pumping as permitted under BB-1z's current regulatory consents.

The decision to workover the well follows receipt of two independent cement-bond analyses by Premier Oilfield Laboratories in Houston, USA and Xodus in the UK. These analyses, together with the Company's own internal evaluation, demonstrate that the quality of the cement-bond over some of the reservoir zones within the current BB-1z well is less than optimal. The findings conclude that, due to the cement-bond condition over segments of the reservoir section, the current completion programme has not effectively connected the wellbore to much of the best open natural fractures. Therefore, the testing to date has not properly evaluated the full flow potential of the overall Kimmeridge reservoir sequence.

Rectifying poor cement bonding in a wellbore is standard oilfield practice and is carried out by squeezing further fresh cement slurry through new or existing perforations in the well's heavy-gauge steel casing. Consequently, following the removal of the current BB-1z well completion assembly, the Company plans to carry out a short sequence of cement-squeezes through the 7-inch casing to rectify sections of the reservoir zone's cement-bond.

Ongoing analysis of electric logs has also revealed further Kimmeridge reservoir zones of interest and these will be perforated and included in the new forward testing programme.

The cement-squeeze and new flow test programme is planned to commence upon the completion of well clean-up operations and delivery of the necessary equipment. The commencement of the programme will be announced in due course. 

Stephen Sanderson, UKOG's Executive Chairman, commented:

"The recovery of free, mobile light oil and solution gas to surface is significant and encouraging news and testament to the Kimmeridge Limestone reservoir's ability to deliver hydrocarbons even from a less than optimal completion. The periods of good natural flow and identification of additional prospective reservoir zones to flow test add further positive outcomes.

Although the forthcoming workover presents additional unplanned work, the reservoir zone's cement-bond integrity is readily rectifiable by the planned short cement-squeeze phase, a common-place and routine oilfield practice. The well will then be restored to an optimal condition for further testing.

I am confident that the revised forward testing plan will be able to deliver the results that will help demonstrate BB-1z's near term commercial viability."

Qualified Person's Statement:

 

Stephen Sanderson, UKOG's Executive Chairman, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information, please contact:

 

UK Oil & Gas Investments PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 243450

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Bavister Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Nick Tulloch / Neil McDonald Tel: 0131 220 6939

 

Square 1 Consulting (Public Relations)

Brian Alexander / David Bick Tel: 01483 243450

 

Glossary

 

casing

heavy-gauge steel pipe that is lowered into position in the open hole of a well and cemented into place. Casing is run to isolate rock formations with different pressure gradients from the well bore and to ensure that any fluids within the well are isolated from the surrounding rock and surface groundwater zone

cement

high grade impermeable Portland cement or concrete used to fill the space or annulus between the well's steel casing and surrounding rock formation. The cement bonds to both the steel casing and surrounding rock to form an impermeable pressure seal.

cement-bond

the measure of the ability of the well's cement to contain pressure. The cement-bond isolates the rock from the well bore and thus prevents rock formation fluids from moving vertically upwards or downwards via the well bore. A good cement bond permits fluid to flow into the well bore solely via perforations through the cement and casing.

cement-squeeze

a remedial workover process whereby cement slurry is pumped into the well's annulus to fill uncemented areas or zones where cement bond is deemed to be inadequate

completion (assembly)

a generic term used to describe the assembly of downhole steel production tubing and equipment that allows safe and efficient production from an oil or gas well

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

electric logs

measurements of the electrical properties of the rock and fluids in and surrounding the wellbore to determine the petrophysical and geological properties of the rock in its in-situ state. The electric logs in BB-1z include 3-dimensional images of the electrical resistivity of the rock which when processed are designed to map and characterise natural fractures, these are known as " image logs"

flow test

a test period where hydrocarbons are flowed to surface through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce oil at a commercial flow rate and to recover oil in commercial quantities or volumes

free flow

a well flowing to the surface without the use of a downhole pump

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone, being made of the remains of calcareous planktonic algae called coccoliths. The Kimmeridge Limestones are comprised of fine grained coccoliths, fine grained calcium carbonate mud, clay minerals, together with dark grey organic matter

nitrogen lifting

the injection of nitrogen into the fluid column in an oil or gas well to initiate fluid flow and production from the reservoir. Due to the low density of nitrogen, this process reduces the back pressure (known as "drawdown") on the reservoir

workover

the process of performing maintenance or remedial treatments on an oil or gas well, such as the removal and replacement of the well completion assembly

 

UKOG Licence Interests

 

The Company has interests in the following ten UK licences:

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field in stable production

Baxters Copse 2

PEDL233

50%

UKOG Weald Limited

IGas Energy Plc

89.6

Appraisal/development well planned; licence extended to 2018

Broadford Bridge 3

PEDL234

100%

Kimmeridge Oil & Gas Limited 4

Kimmeridge Oil & Gas Limited 4

300.0

BB-1&1z drilling completed testing underway

Holmwood 3

PEDL143

40%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

Holmwood-1 exploration well planned in 2017

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

32.435%

Horse Hill Developments Ltd ⁶

Horse Hill Developments Ltd ⁶

99.3

Submitted planning application for long term production tests and drilling of two wells

Horse Hill 5

PEDL246

32.435%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Offshore) 3

P1916

100%

UKOG Solent Limited

UKOG Solent Limited

46.7

Preparing drilling planning submission

Isle of Wight (Onshore) 2, 3

PEDL331

65%

UKOG

TBA

200.0

Preparing drilling planning submission

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Submitted planning application for appraisal and field development

 

Notes:

1. Oil field currently in production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads. Contains the Broadford Bridge-1 and 1z discovery well and the extension of the Godley Bridge Portland gas discovery.

4. UKOG has a 100% interest in Kimmeridge Oil & Gas Limited, which has a 100% interest in PEDL234.

5. Oil discovery with recently completed flow testing.

6. UKOG has a direct 49.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDGGGWGUUPMGQU
Date   Source Headline
4th Mar 20147:00 amRNSUpdate on Investment
28th Feb 20144:57 pmRNSTotal Voting Rights
28th Feb 201412:13 pmRNSIndependent Report and Rig Booked, Brockham UK
28th Feb 20147:01 amRNSReport and Accounts for year to 30 September 2013
3rd Feb 201411:29 amRNSUKOG purchases 6% of UK on-shore oil producer
27th Jan 20147:00 amRNSNew Presentation
15th Jan 20147:00 amRNSAgreement to buy 10% interest in UK oil fields
6th Jan 201411:34 amRNSShare Issue
31st Dec 20137:00 amRNSTotal Voting Rights
20th Dec 20131:37 pmRNSInvestment
18th Dec 20137:00 amRNSRelease from historic potential £2m liability
16th Dec 20136:34 pmRNS£1.04 million funding
5th Dec 20137:00 amRNSName Change and Placing
28th Nov 20134:29 pmRNSGrant of Options
26th Nov 201312:17 pmRNSNew Website, Registered Address & Shares in Issue
25th Nov 20131:11 pmRNSResult of GM, Board Changes and Amended Interims
8th Nov 20133:41 pmRNSInterim Results and Refinancing
4th Oct 20133:19 pmRNSCorporate update
13th Jun 20135:31 pmRNSCorporate Update
31st May 20133:41 pmRNSCorporate Update
29th May 20133:36 pmRNSCorporate Update - Replacement
29th May 20133:20 pmRNSCorporate Update
29th May 20133:20 pmRNSSuspension - Sarantel Group plc
29th May 201310:54 amRNSCorporate Update
21st May 20131:45 pmRNSCorporate Update
30th Apr 201310:50 amRNSTotal Voting Rights
23rd Apr 20139:53 amRNSHolding(s) in Company
11th Apr 201311:06 amRNSBoard Changes
4th Apr 20135:18 pmRNSHolding(s) in Company
2nd Apr 20131:04 pmRNSHolding(s) in Company
2nd Apr 201310:24 amRNSHolding(s) in Company
28th Mar 20133:40 pmRNSHolding(s) in Company
26th Mar 20132:41 pmRNSPlacing and Corporate Update
15th Mar 201311:23 amRNSResult of AGM
5th Feb 20137:00 amRNSOutlook Update
5th Nov 20127:00 amRNSTrading Update
3rd Oct 20127:00 amRNSDesign win with Leica Camera AG
6th Sep 20127:00 amRNSProduct Launches
3rd Sep 201210:59 amRNSHolding(s) in Company
12th Jul 20124:26 pmRNSHolding(s) in Company
6th Jul 20124:38 pmRNSHolding(s) in Company
2nd Jul 20122:08 pmRNSHolding(s) in Company
27th Jun 20127:00 amRNSProduction orders
22nd Jun 201210:08 amRNSUpdate on production order wins
12th Jun 20127:00 amRNSHalf Yearly Report
26th Apr 20127:00 amRNSTrading update
30th Mar 201211:37 amRNSResult of AGM
7th Mar 20127:00 amRNSChange of nomad & broker;annual report publication
5th Mar 201211:14 amRNSHolding(s) in Company
2nd Mar 201211:01 amRNSReplacement Preliminary Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.