The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0325
Bid: 0.03
Ask: 0.035
Change: 0.00 (0.00%)
Spread: 0.005 (16.667%)
Open: 0.0325
High: 0.0325
Low: 0.0325
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

10 Aug 2017 13:00

RNS Number : 6747N
UK Oil & Gas Investments PLC
10 August 2017
 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

Operational Update,

Successful Broadford Bridge-1z Sidetrack Drilled to Optimise Flow Test Potential

Broadford Bridge-1 Exploration Well, Weald Basin, UK

 

Highlights

 

· To deliver optimal Kimmeridge flow test potential, a sidetrack, designated Broadford Bridge-1z ("BB-1z"), has been successfully drilled, logged and cased over the entire 1,480 ft thick Kimmeridge reservoir section.

· BB-1z delivers a fresh, fractured oil-bearing Kimmeridge reservoir section identical to BB-1, with minimal formation damage and an in-gauge 8.5-inch borehole optimal for well completion and flow testing.

· The sidetrack, from 2,613-5,757 ft measured depth ("MD"), runs parallel to BB-1, some 200 ft to the south, mirroring the original BB-1 trajectory. All necessary regulatory permissions to drill BB-1z were obtained. BB-1 plugged and abandoned over entire Kimmeridge section.

· Significant oil traces in drilling fluid seen throughout 1,400 ft vertical thickness of BB-1z Kimmeridge section. Wet gas shows near identical to BB-1. Southerly trajectory aimed at possible more intensely natural fractured zones than BB-1.

· Completion of BB-1z as a potential oil producer is now underway and on track. All permissions in place for a comprehensive multiple zone extended flow test, comprising 926 ft total aggregate perforated section.

 

UK Oil & Gas Investments PLC (London AIM and ISDX: UKOG) is pleased to announce that, to optimise well completion and subsequent flow test performance, it has successfully drilled, logged and cased a mechanical sidetrack, BB-1z, at its 100% owned Broadford Bridge-1 ("BB-1") exploration well located in licence PEDL234. The sidetrack has fulfilled its objective of replicating the geological success of BB-1, via a mirror-image borehole within the Kimmeridge. The new borehole delivers a fresh, identical section of heavily-fractured oil-bearing Kimmeridge reservoir, with minimal formation damage and an in-gauge, cased-off, 8.5-inch borehole optimal for well completion and flow testing.

A mechanical sidetrack was included as a provision in the Oil and Gas Authority's ("OGA") permission to drill BB-1, being a normal contingency during drilling operations.

Following the month-long coring and electric logging programme it became apparent that the duration and difficulty of coring such highly-fractured rocks in an inclined well led to potential plugging of some intensely fractured Kimmeridge zones likely jeopardising flow test performance. Sections of the overlying Purbeck also exhibited washout zones making both optimal casing-setting in the full 8.5-inch open hole section and resultant Kimmeridge well completion problematic. Using lessons learnt from BB-1, the short-duration sidetrack was drilled using the same non-toxic drilling fluid but with a lower density and higher viscosity mixture to minimise reservoir formation damage via possible plugging of oil-filled fractures. The sidetrack's in-gauge 8.5-inch borehole was cased-off successfully without problem and will now be completed for flow testing.

The sidetrack, drilled in five days, was drilled out from BB-1's existing 9 ⅝-inch casing and extends from 2,613-5,757 ft measured depth ("MD"), from within the Purbeck Limestones to below the base of the Kimmeridge Limestone Zero ("KL0") fracture zone. The sidetrack's surface trace runs parallel to BB-1, some 200 ft to the south, mirroring the original BB-1 trajectory.

Significant oil traces were recovered from drilling fluid throughout the Kimmeridge section from 3,622 ft MD to below 5,562 ft MD, a vertical thickness of around 1,400 ft, greater than seen in BB-1. Wet gas shows were at near identical levels to that seen in the original BB-1 borehole.

The more southerly BB-1z trajectory was designed to encounter a potentially higher degree of natural fracturing associated with a nearby significant fault within the Kimmeridge. Initial CMI/MMI log quick-look interpretations indicate that this strategy was successful.

Additionally, BB-1z delivers a unique opportunity to map the lateral connectivity of the natural fracture system between BB-1 and BB-1z. This is a key piece of reservoir information, which along with the analysis of 554 ft of core and electric logs, will greatly aid the placement of future wells and ultimately help optimise any potential production from the reservoir at Broadford Bridge.

Prior to operations start, the original borehole, BB-1, was permanently abandoned with three continuous cement plugs over the entire oil-bearing Kimmeridge section, in full accordance with current required safety and well abandonment regulations.

All necessary regulatory permissions to drill the mechanical sidetrack, BB-1z, were obtained from the Environment Agency, Health and Safety Executive and OGA. The sidetrack's surface trace also lies within the approved "zone of deviation" as specified under West Sussex County Council's ("WSCC") planning consent. The completion of the sidetrack as a potential oil-producing well will constitute the end of the permitted "well construction phase" as defined under WSCC's planning consent.

Operations at site continue to prepare and complete BB-1z as a potential oil producing well from multiple zones over a gross perforated interval of 926 ft. Flow testing will commence after the rig has vacated the site, which will be announced in due course.

The extended flow test programme, to be conducted over a maximum 14-week period, is specifically designed to gather further supportive evidence that the Kimmeridge contains a continuous oil deposit, with mobile light oil and which can flow to surface at commercial rates and in commercial volumes.

The BB-1 and BB-1z technical learnings also have clear positive implications for the forthcoming Horse Hill flow test, which is now being technically reviewed to include further zones and an increased perforated section.

About BB-1

BB-1 and BB-1z, an exploration step-out, is located south of Billingshurst, West Sussex, within the 300 km² PEDL234 licence, in which the Company has a 100% interest via its ownership of the licence's operator, Kimmeridge Oil & Gas Limited ("KOGL").

As previously reported, in the Company's opinion, the multiple positive indications of mobile light oil observed throughout the entire naturally fractured Kimmeridge Limestone 0 ("KL0") to KL4 and shale target section are supportive that a significant continuous oil deposit, with a vertical extent of around 1,400 ft has been demonstrated by BB-1 and 1z. The uppermost two units of this zone, KL4 and KL3, flowed oil at a stable aggregate rate of 1,365 barrels per day in the Horse Hill-1 discovery near Gatwick Airport in 2016.

This continuous oil deposit therefore likely underlies the entire PEDL234 licence and a significant area of the wider Weald Basin, including the Horse Hill-1 Kimmeridge oil discovery some 27 km to the north east. The Company has the largest licence holding in the Weald Basin and within the prospective area of the Kimmeridge play.

Stephen Sanderson, UKOG's Executive Chairman, commented:

"Although BB-1 drilling and coring results were highly successful, proving our geological concept, it became clear that the duration and difficulty of coring such highly-fractured rocks in an inclined hole put the borehole in a less than optimal condition, ultimately jeopardising Kimmeridge flow-test performance. Consequently, using the drilling knowledge gained from BB-1, we have delivered BB-1z, consisting of a fresh, undamaged, 1,480 ft thick, intensely fractured Kimmeridge oil-bearing reservoir in optimal condition for flow testing.

The sidetrack's comprehensive image log data also presents an opportunity to unravel the extent and connectivity of natural fracturing within the Kimmeridge reservoir between BB-1 and BB-1z. This will greatly assist our understanding of flow test behaviour and the optimal placement of potential future Kimmeridge production wells at the site.

The sidetrack, BB-1z, is thus a solid investment in the future of the flagship Broadford Bridge discovery and the wider Kimmeridge play that underlies UKOG's significant licence holdings."

Qualified Person's Statement

 

Stephen Sanderson, UKOG's Executive Chairman, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information, please contact:

 

UK Oil & Gas Investments PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 243450

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Bavister Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Nick Tulloch / Neil McDonald Tel: 0131 220 6939

 

BPA Media/Square 1 Consulting (Public Relations)

Brian Alexander / David Bick Tel: 01483 243450

 

 Glossary:

casing

heavy gauge steel tubing designed to line the wall of a well. The casing provides a safe controlled space in which the drill pipe and bit can operate in isolation from conditions in overlying rock units. The steel tubing is bonded to the surrounding rock by impermeable concrete, known as "cement"

core or coring

a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped core of undamaged in-situ rock. The core is captured in a steel pipe or "core barrel" above the bit. Core is normally cut in 30 feet lengths, or multiples of 30 feet, and normally with a diameter of 3.5 or 4 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of petrophysical and geomechanical parameters

completion or well completion

the process of making a well ready for production. This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down hole tools as well as perforating as required, together with the selection of the appropriate completion fluid contained in the well. The process of running in and cementing the casing can also be included in this category

continuous oil deposit or resource deposit

a petroleum accumulation that is pervasive throughout a large area, which is not significantly affected by hydrodynamic influences (i.e. the buoyancy of oil in water) and is not trapped by structural or stratigraphic geological conditions. The deposit, in contrast to conventional accumulations, has therefore not accumulated by the migration of petroleum over medium to long distances. The petroleum in such deposits is found within, or immediately adjacent or close to, the pore spaces where the petroleum is generated, i.e. those pore spaces lying within petroleum source rocks containing organic rich compounds (kerogen) that, when heated over geological time, transform into petroleum. These accumulations are generally associated with organic-rich shales such as the Kimmeridge Clay Formation. Such accumulations do not generally contain significant volumes of free, mobile formation water and therefore have no observable hydrocarbon-water contacts. The extent of the accumulation is generally defined by the limit of where burial depths have been sufficient to transform organic matter within the petroleum source rock unit into petroleum

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

electric logs

tools which measure the electrical properties of the rock and fluids in and surrounding the wellbore to determine the petrophysical and geological properties of the rock in its in-situ state. The logging equipment is lowered into the borehole on a steel cable through which a wire conveys data to be recorded at surface. The logging at BB-1 also includes tools which record 3-dimensional images and ultrasound scans of the rock designed to map and characterise natural fractures, known as " image logs"

formation damage

the presence of residual drilling fluid and/or lost circulation materials across the reservoir which acts as a barrier or restriction to the subsequent flow of fluids (hydrocarbons) into the wellbore. Damage can be created to plug or block pore-spaces and/or fractures via three mechanisms directly related to the composition, density and viscosity of the drilling and lost circulation material, namely; solid particles and precipitates, swelling clay reactions with water, chemical reactions forming chemical precipitates

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

lost circulation zone (LCZ)

a zone of highly porous and permeable rock or voids directly intersecting the wellbore into which drilling fluid can escape. Commonly LCZs occur in extensive open fracture networks, voids or vugs within limestones and highly porous and permeable sandstones

naturally fractured reservoir

a fractured reservoir contains open and usually connected cracks or fissures within the rock matrix; fractures can enhance permeability of rocks greatly by connecting pore-spaces together; naturally fractured reservoirs have been created over geological time by nature, not man-made via hydraulic fracturing

shale

a fissile rock that is formed by the consolidation of clay, mud, or silt particles, and that has a finely stratified or laminated structure. Certain shales, such as those of the Kimmeridge Clay, often contain a significant proportion of organic material, which when subject to increasing temperature and pressure over geological time transform into petroleum (known as petroleum "source rocks")

sidetrack

re-entry of a well from the well's surface location with drilling equipment for the purpose of deviating from the existing well bore to achieve production or well data from an alternative zone or bottom hole location, or to remedy an engineering problem encountered in the existing well bore

step-out well

a well specifically designed to determine the lateral extent of a discovered hydrocarbon accumulation or play

well "zone of deviation"

an arc or "cheese wedge" within which the surface trace of a deviated well is permitted to travel under planning consent. The apex of the arc being the well's surface location

wet gas

natural gas, predominantly consisting of methane (C1), ethane (C2) and propane (C3) but also containing the longer molecular chain natural gases butane and iso-butane (C4), pentane and iso-pentane (C5). The C4 and C5 gases are created during oil-generation within a petroleum source rock unit when oil is thermally cracked. At Horse Hill these natural gases lie in solution within the oil in the KL3 and KL4 Kimmeridge Limestone reservoirs (i.e. solution or associated gas and not as a separate free-gas phase).

 

UKOG Licence Interests

 

The Company has interests in the following ten UK licences:

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field in stable production

Baxters Copse 2

PEDL233

50%

UKOG Weald Limited

IGas Energy Plc

89.6

Appraisal/development well planned; licence extended to 2018

Broadford Bridge 3

PEDL234

100%

Kimmeridge Oil & Gas Limited 4

Kimmeridge Oil & Gas Limited 4

300.0

BB-1 drilling underway

Holmwood 3

PEDL143

30%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

Holmwood-1 exploration well planned in 2017

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

32.435%

Horse Hill Developments Ltd ⁶

Horse Hill Developments Ltd ⁶

99.3

Submitted planning application for long term production tests and drilling of two wells

Horse Hill 5

PEDL246

32.435%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Offshore) 3

P1916

100%

UKOG Solent Limited

UKOG Solent Limited

46.7

Preparing drilling planning submission

Isle of Wight (Onshore) 2, 3

PEDL331

65%

UKOG

TBA

200.0

Preparing drilling planning submission

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Submitted planning application for appraisal and field development

 

Notes:

1. Oil field currently in production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads. Contains the extension of the Godley Bridge Portland gas discovery and the site of the forthcoming Broadford Bridge-1 well.

4. UKOG has a 100% interest in Kimmeridge Oil & Gas Limited, which has a 100% interest in PEDL234.

5. Oil discovery with recently completed flow testing.

6. UKOG has a direct 48% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDGGURARUPMGGU
Date   Source Headline
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.