Oil Production Update

15 Mar 2019 07:10

RNS Number : 9497S
UK Oil & Gas PLC
15 March 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Oil Production Update

Landmark 10,000 barrels of Portland oil reached at Horse Hill

 

UK Oil & Gas PLC (London AIM: UKOG), is pleased to announce that aggregate test production from the Portland reservoir at the Horse Hill oil field, in which the Company has a 50.635% majority interest, now exceeds 10,000 barrels ("bbl"). The continuous Portland dry oil flow (i.e. oil with zero water content), at a stable daily average rate of over 220 barrels per day ("bopd"), forms a key part of the schedule of works required to finalise the Portland field development plan and to the targeted establishment of permanent long-term Portland production by end 2019.

 

The Horse Hill-1 ("HH-1") well and surrounding highly prospective licences PEDL137 and PEDL246 are operated by UKOG's subsidiary Horse Hill Developments Ltd.

 

For prudent reservoir management purposes, the average test production rate from the Portland section has been maintained below the previously reported 362 bopd calculated optimised sustainable rate.

 

Rig tender documents have also been issued to contractors for the drilling of the HH-2 Portland and HH-1z Kimmeridge horizontal appraisal/production wells and for which planning and environmental permits are in place. Drilling is targeted to start in spring 2019.

 

HH-1 test production is planned to continue until the completion and testing of the new HH-2 Portland well.

 

Further details of extended well test ("EWT")results to date are summarised below.

 

Horse Hill 2018-19 EWT Oil Production Milestones:

 

· Over 35,000 barrels ("bbl") aggregate Kimmeridge and Portland oil production to date.

· Over 25,000 bbl total Kimmeridge oil production.

· Over 10,000 bbl total Portland production to date, flow continues.

· 165 tankers of crude exported primarily to Perenco's Hamble oil terminal. The Portland's 36° API Brent quality crude containing zero produced water, continues to be sold at prevailing Brent crude oil prices, less a small deduction for handling and marketing.

 

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"The Portland's continued excellent production performance, particularly from a non-optimised vertical well, provides building confidence that the previously reported 720-1,080 bopd horizontal well production targets are increasingly attainable. The recent rig-tender exercise also means we remain fully on track to begin the first horizontals in Spring, with long term production testing of both wells planned to follow directly afterwards. This programme puts UKOG in a strong position to deliver real growth and positive cash flow in the near future."

 

Qualified Person's Statement

 

Rob Wallace, UKOG's principal technical advisor, who has over 40 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Wallace is a Chartered Scientist, Chartered Geologist and Fellow of the Geological Society of London, an active member of the American Association of Petroleum Geologists, a member of the Petroleum Exploration Society of Great Britain and a member of the South African Geophysical Society.

 

For further information, please contact:

 

UKOG

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander / David Bick Tel: 01483 900582

 

Glossary

 

°API

a measure of the density of crude oil, as defined by the American Petroleum Institute

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface.

extended well test (EWT) or production test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and generally up to 90 days maximum flowing time per productive horizon. The objective being to establish whether a discovery is commercially viable and the best methods of future production and recovery

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge 3

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1 & 1z oil discovery, planning application approved

Holmwood 3

PEDL143

40%

UKOG

Europa Oil & Gas (Holdings) plc7

91.8

Seeking alternate sites to drill Holmwood and other Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

50.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, two further appraisal wells scheduled for 2019

Horse Hill 5

PEDL246

50.35%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1 /1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery plus further undrilled Kimmeridge exploration prospects.

5. Oil field with three productive and commercially viable zones, EWT ongoing, two further wells HH-1z and HH-2 scheduled in Q2 2019, development underway subject to grant of planning consent, expected in Q3 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. Awaiting approval from the OGA to transfer operatorship from Europa to UKOG

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLMMGMFRDFGLZM
Date   Source Headline
23rd Jun 202611:51 amRNSHolding(s) in Company
12th Jun 20267:00 amRNSSale of Horse Hill PEDL137 Interests
5th May 20267:30 amRNSRestoration - UK Oil & Gas Plc
5th May 20267:01 amRNSHorse Hill – Retrospective Planning Application
5th May 20267:00 amRNSAnnual Accounts for year ended 30 September 2025
1st Apr 20267:30 amRNSSuspension - UK Oil & Gas plc
1st Apr 20267:00 amRNSTemporary suspension of trading on AIM
25th Mar 20267:00 amRNSUKEn signs MOU with Wales & West Utilities
5th Feb 20267:00 amRNSBroadford Bridge Well Abandonment Completed
18th Dec 20254:07 pmRNSHolding(s) in Company
16th Dec 20253:22 pmRNSHolding(s) in Company
15th Dec 20254:35 pmRNSHolding(s) in Company
8th Dec 202510:13 amRNSHolding(s) in Company
8th Dec 202510:10 amRNSHolding(s) in Company
26th Nov 202510:57 amRNSHolding(s) in Company
24th Nov 20255:27 pmRNSHolding(s) in Company
21st Nov 20257:00 amRNSAdditional funding for UKEn Hydrogen projects
18th Nov 20256:04 pmRNSHolding(s) in Company
27th Oct 20257:00 amRNSHolding(s) in Company
24th Oct 202512:30 pmRNSHolding(s) in Company
15th Oct 20258:59 amRNSHolding(s) in Company
13th Oct 202512:11 pmRNSReplacement: Results six-month ended 31 March 2025
6th Oct 20257:00 amRNSFurther funding for UKEn Hydrogen projects
3rd Oct 202512:31 pmRNSAdditional funding for UKEn Hydrogen projects
2nd Oct 20257:00 amRNSSuccessful funding for UKEn Hydrogen projects
1st Oct 20258:45 amRNSUKEn signs MOU with National Gas
1st Oct 20257:30 amRNSRestoration - UK Oil & Gas Plc
30th Sep 20256:00 pmRNSResults for six-month period ended 31 March 2025
30th Sep 20256:00 pmRNSAnnual Accounts for year ended 30 September 2024
2nd Sep 202511:56 amRNSResult of General Meeting
8th Aug 20257:00 amRNSNotice of General Meeting
7th Aug 20257:00 amRNSEmployee Benefit Trust Share Subscription
29th Jul 20254:31 pmRNSAnnual Report and Accounts Publication Update
3rd Jul 20257:00 amRNSSale of UKOG (GB) Limited
30th Jun 20255:59 pmRNSDelay to the Publication of the Interim Results
15th Apr 20257:00 amRNSSignificant Horndean Reserves Increase
2nd Apr 202511:01 amRNSHolding(s) in Company
1st Apr 20257:30 amRNSSuspension - UK Oil & Gas plc
28th Mar 202512:59 pmRNSDelay in Annual Results and temporary suspension
17th Mar 20257:00 amRNSUK Economic Impact of Dorset H2 Storage
11th Mar 20257:00 amRNSDorset green hydrogen generation and import MOUs
21st Feb 20257:00 amRNSSuccessful Funding for South Dorset H2 Storage
10th Feb 20257:00 amRNSSignificant Horndean Production Increase
27th Jan 20257:00 amRNSUKEn South Dorset Hydrogen Storage Project Update
22nd Nov 20247:00 amRNSRetail Offer Results
19th Nov 20247:01 amRNSRetail Offer
19th Nov 20247:00 amRNSPlacing & Retail Offer to fund new H2 storage site
17th Sep 20247:00 amRNSBoard Appointment
9th Sep 20247:00 amRNSSolent Cluster Hydrogen Storage LOS
21st Aug 202412:11 pmRNSResult of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.