Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0255
Bid: 0.024
Ask: 0.027
Change: 0.00 (0.00%)
Spread: 0.003 (12.50%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.0255
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill oil field update

5 Nov 2020 14:28

RNS Number : 4250E
UK Oil & Gas PLC
05 November 2020
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Horse Hill oil field update

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that surface-based intervention operations at its 85.635% owned Horse Hill-1("HH-1") well have now has been completed. The well has now been shut in for a long term pressure build up test ("PBU"), designed to provide data necessary to understand whether the Portland reperforation programme has achieved the desired optimisation of well inflow performance.

As previously announced on October 1st, the intervention's objective was to optimise oil flow by reperforating the full Portland oil producing section, inserting a new production tubing string and thus enabling the downhole pump to be placed at a deeper level. Originally the intervention was planned for April/May but, due to the COVID-19 lockdowns in both the UK and USA, a further unforeseen 6-month delay was introduced. Further updates will be reported when the PBU data has been fully analysed and interpreted.

 

The HH-1 intervention and other related activities are part of normal oil well optimisation. By their very nature, these operations and the continual need to optimise pump performance, can result in considerable down time i.e. periods of no production as such monthly or annual production figures may not fully reflect the long term flow rates of the well. During 6-month period to the end September 2020, approximately 28,060 bbls of oil were produced over approximately 135 operating days.

 

It should also be noted that in the normal course of conventional oil well optimisations there can be a requirement to change the placement of the downhole pump should the flow characteristics change over time, this can be the result of various factors including the break-out of solution gas and increased water cut, translating directly into a production decline over time. It is also normal that individual conventional oil well production declines over time.

 

The Horse Hill Portland and Kimmeridge oil field is operated by UKOG's subsidiary company Horse Hill Developments Ltd ("HHDL"), in which UKOG has a direct 77.9% interest. HHDL has a 65% interest in the field and surrounding PEDL137 and PEDL246 licences, with the remaining 35% interest held by UKOG's wholly owned subsidiary, UKOG (137/246) Ltd.

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has 37 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

 

Stephen Sanderson / Kiran Morzaria

 

Tel: 01483 941493

WH Ireland Ltd (Nominated Adviser and Broker)

 

James Joyce / James Sinclair-Ford

 

Tel: 020 7220 1666

Communications

 

Brian Alexander

Tel: 01483 941493

 

 

Glossary

 

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

 

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFSMFLIESSEEF
Date   Source Headline
9th Aug 20194:36 pmRNSPrice Monitoring Extension
7th Aug 20197:00 amRNSAcquisition of Further Interest in Horse Hill
1st Aug 20197:00 amRNSHorse Hill-1 Production Test Update
28th Jun 20197:00 amRNSHalf-year Report
11th Jun 20197:00 amRNSHorse Hill-1 - 50,000 Barrels of Oil Production
3rd Jun 20197:00 amRNSAcquisition of Further Interest in PEDL143
17th May 20197:00 amRNSHorse Hill-1 Production Test Update
16th Apr 20197:00 amRNSAcquisition of Further Interest in PEDL143
11th Apr 20192:46 pmRNSResult of Annual General Meeting
11th Apr 20197:00 amRNSOil Production Test Update
27th Mar 20197:00 amRNSSuccessful Placing to Raise £3.5 Million
19th Mar 201912:26 pmRNSPosting of Annual Report and Accounts & AGM Notice
15th Mar 20197:10 amRNSOil Production Update
15th Mar 20197:00 amRNSFinal Results for the year ended 30 September 2018
12th Mar 20194:41 pmRNSSecond Price Monitoring Extn
12th Mar 20194:35 pmRNSPrice Monitoring Extension
21st Feb 20197:00 amRNSCompletion of Acquisition in Horse Hill
18th Feb 20197:00 amRNSPortland Oil Production Resumes at Horse Hill
14th Feb 20197:00 amRNSAcquisition of Further Interest in Horse Hill
11th Feb 20199:05 amRNSSecond Price Monitoring Extn
11th Feb 20199:00 amRNSPrice Monitoring Extension
8th Feb 20192:05 pmRNSSecond Price Monitoring Extn
8th Feb 20192:00 pmRNSPrice Monitoring Extension
8th Feb 201911:05 amRNSSecond Price Monitoring Extn
8th Feb 201911:00 amRNSPrice Monitoring Extension
1st Feb 20193:28 pmRNSRelated Party Contractor Agreement
23rd Jan 201911:01 amRNS2019-2020 Strategy and Drilling Plans
22nd Jan 20199:00 amRNSCompletion of Arreton Oil Discovery Acquisition
16th Jan 20197:00 amRNSKimmeridge Oil Production Continues at HH-1
12th Dec 20187:00 amRNSAcquisition of Interest in Arreton Oil Discovery
15th Nov 20187:00 amRNSEWT Update, Portland & Kimmeridge Oil Discovery
18th Oct 20187:00 amRNSPortland Declared Commercially Viable
15th Oct 201811:35 amRNSHolding(s) in Company
10th Oct 20181:55 pmRNSEWT Update: Horse Hill-1
8th Oct 20189:57 amRNSHolding(s) in Company
8th Oct 20189:55 amRNSHolding(s) in Company
5th Oct 201811:30 amRNSExtended Well Test and Regulatory Update
25th Sep 20187:00 amRNSCompletion of Disposal of Interest in HHDL to UKOG
25th Sep 20187:00 amRNSCompletion of Disposal of Interest in HHDL to UKOG
25th Sep 20187:00 amRNSCompletion of Further Interest in HHDL
11th Sep 20184:24 pmRNS18-month Planning Extension Approved
10th Sep 201812:30 pmRNSEWT Updates, Portland & Kimmeridge Oil Discovery
6th Sep 20186:03 pmRNSExercise of Warrants
4th Sep 201811:22 amRNSUpdate - Holmwood Licence (PEDL 143)
3rd Sep 201812:24 pmRNSHigh Court Grants Interim Injunction
30th Aug 20187:00 amRNSAcquisition of Further Interest in Horse Hill
29th Aug 20189:05 amRNSSecond Price Monitoring Extn
29th Aug 20189:00 amRNSPrice Monitoring Extension
24th Aug 20184:40 pmRNSSecond Price Monitoring Extn
24th Aug 20184:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.