George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0325
Bid: 0.03
Ask: 0.035
Change: 0.00 (0.00%)
Spread: 0.005 (16.667%)
Open: 0.0325
High: 0.0325
Low: 0.0325
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Acquisition of Further Interest in Horse Hill

14 Feb 2019 07:00

RNS Number : 9464P
UK Oil & Gas PLC
14 February 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Acquisition of Further Interest in Horse Hill Oil Field and Licences

 

UK Oil & Gas PLC (London AIM: UKOG), the largest onshore licence acreage holder in the Weald Basin, is pleased to announce that it has entered into a binding heads of terms with Doriemus Plc ("Doriemus") to acquire a further 6% shareholding in the Company's subsidiary, Horse Hill Developments Limited ("HHDL"), the operator and 65% direct interest holder in the Horse Hill oil field and the surrounding geologically prospective PEDL137 and PEDL246 licences. Upon completion, the Company will hold a 77.9% direct interest in HHDL and a majority 50.635% interest in the Horse Hill oil field and licences.

 

As previously reported in UKOG's Strategic Review of 23 January 2019, the Company's prime 2019 target is to move Horse Hill's ongoing test-based oil production into permanent production by the end of the year. Two new horizontal wells, HH-2 Portland and HH-1z Kimmeridge, are planned to start in spring 2019. Once drilled, both wells will be put on long term production test until planning consent for permanent production is granted. Planning consent and environmental permits for HH-2 and HH-1z are in place and UKOG is currently fully funded for both wells.

 

The Strategic Review also detailed that the HH-2 Portland production target of 720-1,080 barrels of oil per day ("bopd") from the first horizontal well, HH-2, which has been externally verified as a realistic and viable expectation by Xodus Group Ltd ("Xodus"), aims to position Horse Hill as the Weald Basin's leading oil producing field. Subsequent planned horizontal wells in 2020 are designed to boost gross production to over 2,000 bopd, which would place UKOG within the current top three oil producing companies in the UK onshore sector.

 

Permits to cover up to 20 years of permanent production are expected to be in place by autumn 2019.

 

Transaction Summary

 

The total consideration of £2,100,000, with an effective date of 13 February 2019, will be satisfied through the issue of 129,629,630 new ordinary shares in UKOG ("Consideration Shares"). The Consideration Shares are calculated based upon the 5-day volume weighted average price to market close on Friday 8 February 2019 of 1.62 pence. HHDL recorded a loss of approximately £501,551 in its accounts for the year ended December 2017.

 

Completion of this acquisition will be announced in due course. 

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"We are delighted to acquire this further share of our Horse Hill flagship oil production project. The transaction now firmly establishes UKOG as the majority interest holder in the Horse Hill Portland and Kimmeridge oil field, together with the highly prospective surrounding licence acreage. Horse Hill is UKOG's stated 2019 focus and we are on-track to deliver continuous test-derived oil production until the start of long-term stable oil production by year end. The plan is designed to make Horse Hill the Weald Basin's number one oil producing field in 2019 and to move UKOG upwards into the top tier of UK onshore oil producing companies shortly afterwards.

 

We wish Doriemus well in their planned new ventures in Western Australia."

 

Qualified Person's Statement

 

Rob Wallace, UKOG's principal technical advisor, who has over 40 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Wallace is a Chartered Scientist, Chartered Geologist and Fellow of the Geological Society of London, an active member of the American Association of Petroleum Geologists, a member of the Petroleum Exploration Society of Great Britain and a member of the South African Geophysical Society.

 

For further information, please contact:

 

UKOG

 

Stephen Sanderson / Kiran Morzaria

 

Tel: 01483 900582

WH Ireland (Nominated Adviser and Broker)

 

James Joyce / James Sinclair-Ford

 

Tel: 020 7220 1666

Cenkos Securities PLC (Joint Broker)

 

Joe Nally / Neil McDonald

 

Tel: 0207 397 8919

Novum Securities (Joint Broker)

 

John Bellis

 

Tel: 020 7399 9400

Public Relations

 

Brian Alexander / David Bick

Tel: 01483 900582

 

Glossary

 

extended well test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days per zone

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface. An oil field consists of a reservoir in a shape that will trap hydrocarbons and that is covered by an impermeable or sealing rock

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge 3

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1 & 1z oil discovery, planning application approved

Holmwood 3

PEDL143

40%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

Seeking alternate sites to drill Holmwood and other Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

50.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, two further appraisal wells scheduled for 2019

Horse Hill 5

PEDL246

50.635%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood 

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

 Well plugged and abandoned

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1 /1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery plus further undrilled Kimmeridge exploration prospects.

5. Oil field with three productive and commercially viable zones, EWT ongoing, two further wells HH-1z and HH-2 scheduled in Q2 2019, development underway subject to grant of planning consent, expected in Q3 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
ACQUOUBRKVAUAAR
Date   Source Headline
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.