Extended Well Test and Regulatory Update

5 Oct 2018 11:30

RNS Number : 1481D
UK Oil & Gas PLC
05 October 2018
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Extended Well Test ("EWT") and Regulatory Update

Horse Hill-1 ("HH-1") Portland and Kimmeridge Oil Discovery, Weald Basin, UK

 

Key Points:

 

· Kimmeridge Limestone 4 ("KL4") EWT operations now underway. Further updates to follow in due course following flow stabilisation and pressure build up ("PBU") tests.

· Final Xodus report determines that the single HH-1 well "sees" a connected Portland oil in place ("OIP") of approximately 7-11 million barrels, a robustly viable commercial volume for a single well.

· Horse Hill Portland and Kimmeridge long-term production scoping report submitted to Surrey County Council ("SCC"). Overall plan includes a total of six production wells, with up to 3 production wells and a reservoir pressure support well in the Portland oil pool. A planning application for production will be submitted to SCC prior to the completion of the 2018 EWT programme.

 

UK Oil & Gas PLC (London AIM: UKOG) announces that HHDL, a UKOG subsidiary company and the operator of the HH-1 Kimmeridge Limestone and conventional Portland Sandstone oil discovery, has informed the Company that, following the successful Portland EWT programme, the KL4 EWT flow sequence operation has now commenced. HH-1 is located in licence PEDL137 in which UKOG holds a 46.735% beneficial interest.

 

Further to the reported Portland EWT results, Xodus have now delivered a report which details that, to date, the single HH-1 well has "seen" approximately 7-11 million connected barrels of the total full field OIP (or Stock Tank Oil Initially in Place "STOIIP") reported in the Company's July 2018 AIM re-admission document. Based upon modelled production profiles and oil recoveries, the Company and Xodus believe this to be a commercial connected OIP volume for a single well that supports the Company's envisaged multi-well Portland oil drilling and production programme. It should be noted that the calculated connected OIP should not be misconstrued as recoverable volumes or reserves.

 

Given the EWT has delivered both commercially viable Portland flow rates and connected oil volumes, an internal declaration of Portland commerciality will be made shortly by HDDL.

 

As the first part of the regulatory process necessary to deliver the Company's goal of long-term oil production at Horse Hill in 2019, HHDL has recently submitted an outline production scoping report to SCC.

 

The scoping report details the envisaged environmental impacts from the outline development's future drilling, production, decommissioning and site restoration phases. The envisaged development has a total of six production wells and assumes a maximum daily rate of around 3,500 bopd. During the production phase it is envisaged that should production capacity exceed 3,500 bopd an application to increase total produced volumes will be made. The Portland oil pool is envisaged to be produced via up to three wells and one pressure support well. As previously reported, regulatory permissions are in place to drill and flow test the first two new wellbores, HH-1z and HH-2 with a planned early 2019 spud date.

 

The scoping report and a table of estimated HGV movements during the production phase is available on the Company's website. Average HGV movements during the plan's 20-year field production life are estimated to total three per day.

 

Following SCC's feedback on the scoping report, HHDL will then submit a full-scale production planning application, currently planned before the completion of the current 2018 EWT programme.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"The Portland continues to out-perform our initial expectations and looks set to provide the production and cash flow base that can underpin UKOG's future growth. Our immediate operational focus now switches to the Kimmeridge EWT, which, if successful, has the potential to make Horse Hill one of the UK's leading onshore producing oil fields and to help unlock the value within our extensive Kimmeridge asset portfolio in the Weald."

 

About Xodus

 

Xodus are an international, globally recognised consultancy group providing engineering and advisory services to clients in the oil & gas, LNG, renewables and utilities industries worldwide. They are certified as Competent Persons for the purposes of oil and gas resource and reserve assessments. More details can be found at www.xodusgroup.com

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Chief Operating Officer, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 243450

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander / David Bick Tel: 01483 243450

 

Glossary

 

connected oil in place

A volume of OIP that is demonstrated by reservoir pressure and flow data to be directly accessed and drained by a well during production. Only part (or a fraction) of the volume, known as the recoverable volume, will normally be recovered to surface during oil production. The percentage of the recoverable volume compared to the total connected OIP is known as the recovery factor for that well.

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

extended well test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days maximum

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

oil in place

the quantity of oil or petroleum that is estimated to exist in naturally occurring accumulations.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently shut in

Broadford Bridge 4

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1 & 1z oil discovery, planning application approved

Holmwood 3

PEDL143

40%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

Seeking alternate sites to drill Holmwood and other Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

46.735%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, 2 further appraisal wells scheduled for 2018/19

Horse Hill 5

PEDL246

46.735%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

65%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Revised drilling and testing planning application underway

Notes:

1. Oil field currently in production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads. PEDL234 contains the Broadford Bridge-1 and 1z oil discovery well, the extension of the Godley Bridge Portland gas discovery plus further exploration prospects.

4. UKOG has a 100% interest in UKOG (234) Ltd, which has a 100% interest in PEDL234.

5. Oil discovery in 3 zones, EWT ongoing, two further wells HH-1z and HH-2 planned in early 2019

6. UKOG has a direct 71.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCBGBDGLDGBGIU
Date   Source Headline
23rd Jun 202611:51 amRNSHolding(s) in Company
12th Jun 20267:00 amRNSSale of Horse Hill PEDL137 Interests
5th May 20267:30 amRNSRestoration - UK Oil & Gas Plc
5th May 20267:01 amRNSHorse Hill – Retrospective Planning Application
5th May 20267:00 amRNSAnnual Accounts for year ended 30 September 2025
1st Apr 20267:30 amRNSSuspension - UK Oil & Gas plc
1st Apr 20267:00 amRNSTemporary suspension of trading on AIM
25th Mar 20267:00 amRNSUKEn signs MOU with Wales & West Utilities
5th Feb 20267:00 amRNSBroadford Bridge Well Abandonment Completed
18th Dec 20254:07 pmRNSHolding(s) in Company
16th Dec 20253:22 pmRNSHolding(s) in Company
15th Dec 20254:35 pmRNSHolding(s) in Company
8th Dec 202510:13 amRNSHolding(s) in Company
8th Dec 202510:10 amRNSHolding(s) in Company
26th Nov 202510:57 amRNSHolding(s) in Company
24th Nov 20255:27 pmRNSHolding(s) in Company
21st Nov 20257:00 amRNSAdditional funding for UKEn Hydrogen projects
18th Nov 20256:04 pmRNSHolding(s) in Company
27th Oct 20257:00 amRNSHolding(s) in Company
24th Oct 202512:30 pmRNSHolding(s) in Company
15th Oct 20258:59 amRNSHolding(s) in Company
13th Oct 202512:11 pmRNSReplacement: Results six-month ended 31 March 2025
6th Oct 20257:00 amRNSFurther funding for UKEn Hydrogen projects
3rd Oct 202512:31 pmRNSAdditional funding for UKEn Hydrogen projects
2nd Oct 20257:00 amRNSSuccessful funding for UKEn Hydrogen projects
1st Oct 20258:45 amRNSUKEn signs MOU with National Gas
1st Oct 20257:30 amRNSRestoration - UK Oil & Gas Plc
30th Sep 20256:00 pmRNSResults for six-month period ended 31 March 2025
30th Sep 20256:00 pmRNSAnnual Accounts for year ended 30 September 2024
2nd Sep 202511:56 amRNSResult of General Meeting
8th Aug 20257:00 amRNSNotice of General Meeting
7th Aug 20257:00 amRNSEmployee Benefit Trust Share Subscription
29th Jul 20254:31 pmRNSAnnual Report and Accounts Publication Update
3rd Jul 20257:00 amRNSSale of UKOG (GB) Limited
30th Jun 20255:59 pmRNSDelay to the Publication of the Interim Results
15th Apr 20257:00 amRNSSignificant Horndean Reserves Increase
2nd Apr 202511:01 amRNSHolding(s) in Company
1st Apr 20257:30 amRNSSuspension - UK Oil & Gas plc
28th Mar 202512:59 pmRNSDelay in Annual Results and temporary suspension
17th Mar 20257:00 amRNSUK Economic Impact of Dorset H2 Storage
11th Mar 20257:00 amRNSDorset green hydrogen generation and import MOUs
21st Feb 20257:00 amRNSSuccessful Funding for South Dorset H2 Storage
10th Feb 20257:00 amRNSSignificant Horndean Production Increase
27th Jan 20257:00 amRNSUKEn South Dorset Hydrogen Storage Project Update
22nd Nov 20247:00 amRNSRetail Offer Results
19th Nov 20247:01 amRNSRetail Offer
19th Nov 20247:00 amRNSPlacing & Retail Offer to fund new H2 storage site
17th Sep 20247:00 amRNSBoard Appointment
9th Sep 20247:00 amRNSSolent Cluster Hydrogen Storage LOS
21st Aug 202412:11 pmRNSResult of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.