Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0325
Bid: 0.03
Ask: 0.035
Change: 0.00 (0.00%)
Spread: 0.005 (16.667%)
Open: 0.0325
High: 0.0325
Low: 0.0325
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill-1 Production Test Update

17 May 2019 07:00

RNS Number : 3326Z
UK Oil & Gas PLC
17 May 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Horse Hill-1 Production Test Update

Portland Oil Production now exceeds 20,500 barrels

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that, following a successful week-long pressure build-up test ("PBU"), the aggregate total Portland oil production at the Horse Hill oil field, in which the Company has a 50.635% majority interest, now exceeds 20,500 barrels ("bbl"). The Portland continues to produce at a stable rate of over 220 barrels of dry oil per day ("bopd") at a modest reservoir pressure draw-down. No formation water has yet been produced to surface.

 

The latest PBU yielded significantly better than expected results, with little or no apparent pressure depletion compared to the last PBU in early April. The potential positive impact on connected oil in place will therefore be thoroughly evaluated and reported in due course.

 

The successful Portland and Kimmeridge extended well test ("EWT") programme has now produced an aggregate volume in excess of 45,500 bbl to date, with a landmark target of 50,000 barrels set to be achieved over the coming month and prior to the start of the forthcoming horizontal well campaign. In order that the HH-2 Portland well can be drilled, the current plan envisages that once HH-1 Portland test production exceeds 25,000 bbl, production will be switched back to the Kimmeridge oil pool.

 

For prudent Portland reservoir management purposes and to ensure there is no detriment to the expected high performance of the HH-2 Portland horizontal well, the average pumped rate from HH-1 continues to be maintained below the previously reported 362 bopd calculated sustainable rate. As previously stated, based upon well-established reservoir engineering metrics, it is expected that HH-2 has the potential to achieve a rate of 2-3 or more times the HH-1's vertical rate of 362 bopd.

 

Following a successful tender process, the Company is now finalising contracts for the forthcoming drilling campaign and preparations are now well advanced for simultaneous test production and horizontal drilling operations at Horse Hill.

 

The HH-1 well and surrounding highly prospective PEDL137 and PEDL246 licences are operated by UKOG's subsidiary Horse Hill Developments Ltd in which the Company holds a 77.9% direct interest.

 

Further details of EWT results to date are summarised below.

 

Horse Hill 2018-19 EWT Oil Production Milestones:

 

· Over 45,500 bbl aggregate Kimmeridge and Portland oil production to date.

· Over 25,000 bbl total Kimmeridge oil production.

· Over 20,500 bbl total Portland production to date, flow continues.

· 213 tankers of crude exported primarily to BP's Hamble oil terminal. The Portland's 36° API Brent quality crude, containing zero produced water, continues to be sold to Perenco at prevailing Brent crude oil prices, less a small deduction for handling and marketing.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"The Portland test programme continues to exceed our technical expectations with dry oil production now exceeding 20,500 bbl. Our overall testing costs have also been significantly offset by the associated sales revenues. Moving forwards, we now expect to exceed 25,000 bbl Portland test production before the HH-1 test is switched back to the Kimmeridge to facilitate the drilling of HH-2.

 

The recent extensive pressure build-up also indicates HH-1 is likely connected to a larger oil volume than previously recognised. Further Portland test data will now be collected and analysed before the HH-2 drilling campaign to confirm this important development.

 

The Horse Hill oil field and its associated significant future cash flow stream is of paramount importance to UKOG and will, therefore, continue to be the Company's prime short-term focus. In this respect, we remain on track to commence drilling HH-2 as previously reported."

 

Qualified Person's Statement

 

Rob Wallace, UKOG's principal technical advisor, who has over 40 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Wallace is a Chartered Scientist, Chartered Geologist and Fellow of the Geological Society of London, an active member of the American Association of Petroleum Geologists, a member of the Petroleum Exploration Society of Great Britain and a member of the South African Geophysical Society. 

 

For further information, please contact:

 

UKOG

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander / David Bick Tel: 01483 900582

 

Glossary

 

°API

a measure of the density of crude oil, as defined by the American Petroleum Institute

draw down

Pressure drawdown (∆P) is defined as the difference between the reservoir pressure and the flowing bottom hole pressure. Drawdown enables fluids to flow from the reservoir into the wellbore. The magnitude of the drawdown is a major controlling factors of a well's production rate.

extended well test (EWT) or production test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and generally up to 90 days maximum flowing time per productive horizon. The objective being to establish whether a discovery is commercially viable and the best methods of future production and recovery.

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge 3

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1 & 1z oil discovery, planning application approved

A24 3

PEDL143

67.50%

UKOG

UKOG 7

91.8

Seeking alternate sites to drill A24 and other Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

50.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, two further appraisal wells scheduled for 2019

Horse Hill 5

PEDL246

50.635%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1 /1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery plus further undrilled Kimmeridge exploration prospects.

5. Oil field with three productive and commercially viable zones, EWT ongoing, two further wells HH-1z and HH-2 scheduled in Q2 2019, development underway subject to grant of planning consent, expected in Q3 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDUNSNRKAAVAAR
Date   Source Headline
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.