If you would like to ask our webinar guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund a question please submit them here.

 

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0275
Bid: 0.025
Ask: 0.03
Change: 0.00 (0.00%)
Spread: 0.005 (20.00%)
Open: 0.0275
High: 0.0275
Low: 0.0275
Prev. Close: 0.0275
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill-1 Production Test Update

17 May 2019 07:00

RNS Number : 3326Z
UK Oil & Gas PLC
17 May 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Horse Hill-1 Production Test Update

Portland Oil Production now exceeds 20,500 barrels

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that, following a successful week-long pressure build-up test ("PBU"), the aggregate total Portland oil production at the Horse Hill oil field, in which the Company has a 50.635% majority interest, now exceeds 20,500 barrels ("bbl"). The Portland continues to produce at a stable rate of over 220 barrels of dry oil per day ("bopd") at a modest reservoir pressure draw-down. No formation water has yet been produced to surface.

 

The latest PBU yielded significantly better than expected results, with little or no apparent pressure depletion compared to the last PBU in early April. The potential positive impact on connected oil in place will therefore be thoroughly evaluated and reported in due course.

 

The successful Portland and Kimmeridge extended well test ("EWT") programme has now produced an aggregate volume in excess of 45,500 bbl to date, with a landmark target of 50,000 barrels set to be achieved over the coming month and prior to the start of the forthcoming horizontal well campaign. In order that the HH-2 Portland well can be drilled, the current plan envisages that once HH-1 Portland test production exceeds 25,000 bbl, production will be switched back to the Kimmeridge oil pool.

 

For prudent Portland reservoir management purposes and to ensure there is no detriment to the expected high performance of the HH-2 Portland horizontal well, the average pumped rate from HH-1 continues to be maintained below the previously reported 362 bopd calculated sustainable rate. As previously stated, based upon well-established reservoir engineering metrics, it is expected that HH-2 has the potential to achieve a rate of 2-3 or more times the HH-1's vertical rate of 362 bopd.

 

Following a successful tender process, the Company is now finalising contracts for the forthcoming drilling campaign and preparations are now well advanced for simultaneous test production and horizontal drilling operations at Horse Hill.

 

The HH-1 well and surrounding highly prospective PEDL137 and PEDL246 licences are operated by UKOG's subsidiary Horse Hill Developments Ltd in which the Company holds a 77.9% direct interest.

 

Further details of EWT results to date are summarised below.

 

Horse Hill 2018-19 EWT Oil Production Milestones:

 

· Over 45,500 bbl aggregate Kimmeridge and Portland oil production to date.

· Over 25,000 bbl total Kimmeridge oil production.

· Over 20,500 bbl total Portland production to date, flow continues.

· 213 tankers of crude exported primarily to BP's Hamble oil terminal. The Portland's 36° API Brent quality crude, containing zero produced water, continues to be sold to Perenco at prevailing Brent crude oil prices, less a small deduction for handling and marketing.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"The Portland test programme continues to exceed our technical expectations with dry oil production now exceeding 20,500 bbl. Our overall testing costs have also been significantly offset by the associated sales revenues. Moving forwards, we now expect to exceed 25,000 bbl Portland test production before the HH-1 test is switched back to the Kimmeridge to facilitate the drilling of HH-2.

 

The recent extensive pressure build-up also indicates HH-1 is likely connected to a larger oil volume than previously recognised. Further Portland test data will now be collected and analysed before the HH-2 drilling campaign to confirm this important development.

 

The Horse Hill oil field and its associated significant future cash flow stream is of paramount importance to UKOG and will, therefore, continue to be the Company's prime short-term focus. In this respect, we remain on track to commence drilling HH-2 as previously reported."

 

Qualified Person's Statement

 

Rob Wallace, UKOG's principal technical advisor, who has over 40 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Wallace is a Chartered Scientist, Chartered Geologist and Fellow of the Geological Society of London, an active member of the American Association of Petroleum Geologists, a member of the Petroleum Exploration Society of Great Britain and a member of the South African Geophysical Society. 

 

For further information, please contact:

 

UKOG

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander / David Bick Tel: 01483 900582

 

Glossary

 

°API

a measure of the density of crude oil, as defined by the American Petroleum Institute

draw down

Pressure drawdown (∆P) is defined as the difference between the reservoir pressure and the flowing bottom hole pressure. Drawdown enables fluids to flow from the reservoir into the wellbore. The magnitude of the drawdown is a major controlling factors of a well's production rate.

extended well test (EWT) or production test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and generally up to 90 days maximum flowing time per productive horizon. The objective being to establish whether a discovery is commercially viable and the best methods of future production and recovery.

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge 3

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1 & 1z oil discovery, planning application approved

A24 3

PEDL143

67.50%

UKOG

UKOG 7

91.8

Seeking alternate sites to drill A24 and other Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

50.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, two further appraisal wells scheduled for 2019

Horse Hill 5

PEDL246

50.635%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1 /1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery plus further undrilled Kimmeridge exploration prospects.

5. Oil field with three productive and commercially viable zones, EWT ongoing, two further wells HH-1z and HH-2 scheduled in Q2 2019, development underway subject to grant of planning consent, expected in Q3 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDUNSNRKAAVAAR
Date   Source Headline
4th Apr 201811:34 amRNSLoan Conversion
3rd Apr 20187:01 amRNSReport and Accounts for Year End 30 September 2017
29th Mar 201811:04 amRNSFinal Results for the Year Ended 30 September 2017
29th Mar 20188:55 amRNSFinal Results for the Year Ended 31 December 2017
29th Mar 20187:00 amRNSUpdate - Broadford Bridge-1
27th Mar 201812:42 pmRNSLoan Conversion
23rd Mar 201811:05 amRNSSecond Price Monitoring Extn
23rd Mar 201811:00 amRNSPrice Monitoring Extension
23rd Mar 20187:00 amRNSUpdate - Horse Hill
22nd Mar 201810:09 amRNSLoan Conversion
21st Mar 20182:25 pmRNSUpdate - Broadford Bridge-1
16th Mar 20182:58 pmRNSLoan Conversion
7th Mar 201810:35 amRNSLoan Conversion
6th Mar 20187:59 amRNSRegulatory Consent Update - Broadford Bridge-1/1z
27th Feb 20181:39 pmRNSLoan Conversion
20th Feb 20184:40 pmRNSSecond Price Monitoring Extn
20th Feb 20184:35 pmRNSPrice Monitoring Extension
20th Feb 20182:50 pmRNSUpdate - Broadford Bridge-1
9th Feb 20183:03 pmRNSLoan Conversion
6th Feb 20187:59 amRNSUpdate - Broadford Bridge-1
31st Jan 20187:00 amRNSUpdate - Isle of Wight
10th Jan 20184:52 pmRNSDelisting from NEX Exchange
27th Dec 20173:24 pmRNSAmended- Operational, Technical & Corporate Update
27th Dec 20177:00 amRNSOperational, Technical and Corporate Update
19th Dec 20177:00 amRNSOperational Update - Horse Hill-1
18th Dec 20173:56 pmRNSLoan Conversion
11th Dec 20175:17 pmRNSLoan Conversion
6th Dec 20177:00 amRNSLoan Conversion & Completion of Acquisition
24th Nov 20174:13 pmRNSLoan Conversion
20th Nov 20173:22 pmRNSLoan Conversion
15th Nov 20177:00 amRNS£10M Financing and BB-1z Optimised Flow Testing
9th Nov 201711:51 amRNSExercise of Options
20th Oct 201711:58 amRNSHoldings in Company
19th Oct 20179:25 amRNSHolding(s) in Company
19th Oct 20179:19 amRNSUpdate on Holmwood Well
18th Oct 20173:45 pmRNSHorse Hill - Planning Permission Granted
16th Oct 20173:11 pmRNSOperational Update
12th Oct 201712:13 pmRNSHolding(s) in Company
10th Oct 20175:18 pmRNSOperational Update
25th Sep 201712:05 pmRNSAcquisition of further interest in PEDL143
25th Sep 201710:35 amRNSHolding(s) in Company - Correction
25th Sep 201710:13 amRNSHolding(s) in Company
13th Sep 20177:00 amRNSUpdate - Broadford Bridge-1
11th Sep 20171:50 pmRNSExercise of Options
8th Sep 20177:00 amRNSUpdate - Horse Hill
6th Sep 20173:47 pmRNSOperational Update
24th Aug 20177:00 amRNSAcquisition of Further Interest in Horse Hill-1
10th Aug 20171:00 pmRNSOperational Update
31st Jul 20176:05 pmRNSOperational Update and Warrant Exercise
31st Jul 20175:11 pmRNSNotification of Major Holdings in Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.