Blencowe Resources: Aspiring to become one of the largest graphite producers in the world. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0285
Bid: 0.027
Ask: 0.03
Change: 0.00 (0.00%)
Spread: 0.003 (11.111%)
Open: 0.0285
High: 0.0306
Low: 0.0285
Prev. Close: 0.0285
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill-1 Production Test Update

1 Aug 2019 07:00

RNS Number : 4529H
UK Oil & Gas PLC
01 August 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Horse Hill-1 production hits 60,000 barrels via new Phase 2 Kimmeridge test

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that in preparation for the late summer start of the Horse Hill-2/2z ("HH-2/2z") Portland drilling programme, test production was switched successfully from the Portland to the deeper Kimmeridge oil pool. From 6th July to date, the Phase 2 Kimmeridge test has produced a further 5,524 barrels ("bbl") of dry Brent quality oil. Total aggregate Portland and Kimmeridge test oil production from the Horse Hill oil field, in which the Company has a 50.635% majority interest, now totals a significant landmark of 60,186 barrels ("bbl").

 

Kimmeridge oil flow was re-established at initial half-hourly metered rates of up to 332 bbl of oil per day ("bopd"), with continued stable production of dry oil at daily rates of 200-266 bopd. Total Kimmeridge production to date, now exceeds 30,618 bbl with no apparent produced formation water. Following a 5-month shut-in, flow rates and flowing bottom hole pressures appear more stable than during Phase 1 Kimmeridge testing.

 

Prior to the Kimmeridge production switch, which was necessary for the safe drilling and coring of HH-2/2z through the Portland reservoir, total aggregate Portland production reached 29,568 bbl, with HH-1 continuing to produce dry Portland oil at a stable rate of over 220 bopd. Preliminary Company analysis of the final Portland pressure build-up test, indicates that the Portland connected oil volume accessed by HH-1 has significantly increased from 7-11 million bbl to 11-14 million bbl, a robustly commercial volume.

 

Kimmeridge test production is planned to continue throughout the drilling of HH-2/2z except for two short shut-ins to enable the moving of oil storage tanks and installation of the drilling rig. The drilling rig is now scheduled to arrive on site following routine servicing after the completion of its current job.

 

The Horse Hill oil field and surrounding highly prospective PEDL137 and PEDL246 licences are operated by UKOG's subsidiary company Horse Hill Developments Ltd, in which UKOG holds a 77.9% direct interest.

 

Horse Hill 2018-19 EWT Oil Production Milestones:

 

·; 60,186 bbl aggregate Kimmeridge and Portland oil production

·; 29,568 bbl total Portland production

·; 30,618 bbl total Kimmeridge oil production

·; No discernible formation water produced from either reservoir

·; Stable Portland test production has continued to prove more oil in the ground

·; Kimmeridge flow resumed at more stable rates and flowing pressures after 5 month shut-in

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"The resumption of Kimmeridge oil flow at more stable rates than previously seen is welcome news for the Kimmeridge's commercial future and further justifies the decision to conduct simultaneous Portland drilling and HH-1 Kimmeridge test production at the site. The successful production switch from Portland to Kimmeridge now paves the way for the expected late summer arrival of the rig and the HH-2/2z Portland horizontal drilling and testing campaign.

 

The test results to date also signify that after a year of production testing, the simple non-optimised vertical HH-1 well remains capable of continuous production from both Portland and Kimmeridge zones at an aggregate rate of 450 bopd. Consequently, as a result of the test's ongoing success, in the opinion of the Directors, the future potential for significantly higher rates from the Portland HH-2z horizontal together with production from the underlying Kimmeridge therefore remains an even more tangible, imminent and exciting prospect."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has over 35 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria

Tel: 01483 900582

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford

Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald

Tel: 0207 397 8919

 

Novum Securities (Joint Broker) 

John Bellis

Tel: 020 7399 9400

 

Public Relations

Brian Alexander

Tel: 01483 900582

 

 

Glossary

 

 

core or coring

a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped core of undamaged in-situ rock. The core is captured in a steel pipe or "core barrel" above the bit. Core is normally cut in 20 ft lengths, or multiples of 20 ft, and normally with a diameter of 3.5 or 4 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of petrophysical and geomechanical parameters

extended well test or production test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over each zone of greater than 96 hours; the objective being to establish whether a discovery is commercially viable and the optimal methods of future production and recovery

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

 

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

40%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

50.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, two further appraisal wells scheduled for 2019

Horse Hill 5

PEDL246

50.635%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery plus further undrilled Kimmeridge exploration prospects.

5. Oil field with three productive and commercially viable zones, EWT ongoing, further drilling campaign scheduled, development underway subject to grant of planning consent expected in Q3 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLUAONRKKABOAR
Date   Source Headline
9th Aug 20194:36 pmRNSPrice Monitoring Extension
7th Aug 20197:00 amRNSAcquisition of Further Interest in Horse Hill
1st Aug 20197:00 amRNSHorse Hill-1 Production Test Update
28th Jun 20197:00 amRNSHalf-year Report
11th Jun 20197:00 amRNSHorse Hill-1 - 50,000 Barrels of Oil Production
3rd Jun 20197:00 amRNSAcquisition of Further Interest in PEDL143
17th May 20197:00 amRNSHorse Hill-1 Production Test Update
16th Apr 20197:00 amRNSAcquisition of Further Interest in PEDL143
11th Apr 20192:46 pmRNSResult of Annual General Meeting
11th Apr 20197:00 amRNSOil Production Test Update
27th Mar 20197:00 amRNSSuccessful Placing to Raise £3.5 Million
19th Mar 201912:26 pmRNSPosting of Annual Report and Accounts & AGM Notice
15th Mar 20197:10 amRNSOil Production Update
15th Mar 20197:00 amRNSFinal Results for the year ended 30 September 2018
12th Mar 20194:41 pmRNSSecond Price Monitoring Extn
12th Mar 20194:35 pmRNSPrice Monitoring Extension
21st Feb 20197:00 amRNSCompletion of Acquisition in Horse Hill
18th Feb 20197:00 amRNSPortland Oil Production Resumes at Horse Hill
14th Feb 20197:00 amRNSAcquisition of Further Interest in Horse Hill
11th Feb 20199:05 amRNSSecond Price Monitoring Extn
11th Feb 20199:00 amRNSPrice Monitoring Extension
8th Feb 20192:05 pmRNSSecond Price Monitoring Extn
8th Feb 20192:00 pmRNSPrice Monitoring Extension
8th Feb 201911:05 amRNSSecond Price Monitoring Extn
8th Feb 201911:00 amRNSPrice Monitoring Extension
1st Feb 20193:28 pmRNSRelated Party Contractor Agreement
23rd Jan 201911:01 amRNS2019-2020 Strategy and Drilling Plans
22nd Jan 20199:00 amRNSCompletion of Arreton Oil Discovery Acquisition
16th Jan 20197:00 amRNSKimmeridge Oil Production Continues at HH-1
12th Dec 20187:00 amRNSAcquisition of Interest in Arreton Oil Discovery
15th Nov 20187:00 amRNSEWT Update, Portland & Kimmeridge Oil Discovery
18th Oct 20187:00 amRNSPortland Declared Commercially Viable
15th Oct 201811:35 amRNSHolding(s) in Company
10th Oct 20181:55 pmRNSEWT Update: Horse Hill-1
8th Oct 20189:57 amRNSHolding(s) in Company
8th Oct 20189:55 amRNSHolding(s) in Company
5th Oct 201811:30 amRNSExtended Well Test and Regulatory Update
25th Sep 20187:00 amRNSCompletion of Disposal of Interest in HHDL to UKOG
25th Sep 20187:00 amRNSCompletion of Disposal of Interest in HHDL to UKOG
25th Sep 20187:00 amRNSCompletion of Further Interest in HHDL
11th Sep 20184:24 pmRNS18-month Planning Extension Approved
10th Sep 201812:30 pmRNSEWT Updates, Portland & Kimmeridge Oil Discovery
6th Sep 20186:03 pmRNSExercise of Warrants
4th Sep 201811:22 amRNSUpdate - Holmwood Licence (PEDL 143)
3rd Sep 201812:24 pmRNSHigh Court Grants Interim Injunction
30th Aug 20187:00 amRNSAcquisition of Further Interest in Horse Hill
29th Aug 20189:05 amRNSSecond Price Monitoring Extn
29th Aug 20189:00 amRNSPrice Monitoring Extension
24th Aug 20184:40 pmRNSSecond Price Monitoring Extn
24th Aug 20184:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.