The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0285
Bid: 0.027
Ask: 0.03
Change: 0.00 (0.00%)
Spread: 0.003 (11.111%)
Open: 0.0285
High: 0.0306
Low: 0.0285
Prev. Close: 0.0285
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill-1 Production Test Update

1 Aug 2019 07:00

RNS Number : 4529H
UK Oil & Gas PLC
01 August 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Horse Hill-1 production hits 60,000 barrels via new Phase 2 Kimmeridge test

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that in preparation for the late summer start of the Horse Hill-2/2z ("HH-2/2z") Portland drilling programme, test production was switched successfully from the Portland to the deeper Kimmeridge oil pool. From 6th July to date, the Phase 2 Kimmeridge test has produced a further 5,524 barrels ("bbl") of dry Brent quality oil. Total aggregate Portland and Kimmeridge test oil production from the Horse Hill oil field, in which the Company has a 50.635% majority interest, now totals a significant landmark of 60,186 barrels ("bbl").

 

Kimmeridge oil flow was re-established at initial half-hourly metered rates of up to 332 bbl of oil per day ("bopd"), with continued stable production of dry oil at daily rates of 200-266 bopd. Total Kimmeridge production to date, now exceeds 30,618 bbl with no apparent produced formation water. Following a 5-month shut-in, flow rates and flowing bottom hole pressures appear more stable than during Phase 1 Kimmeridge testing.

 

Prior to the Kimmeridge production switch, which was necessary for the safe drilling and coring of HH-2/2z through the Portland reservoir, total aggregate Portland production reached 29,568 bbl, with HH-1 continuing to produce dry Portland oil at a stable rate of over 220 bopd. Preliminary Company analysis of the final Portland pressure build-up test, indicates that the Portland connected oil volume accessed by HH-1 has significantly increased from 7-11 million bbl to 11-14 million bbl, a robustly commercial volume.

 

Kimmeridge test production is planned to continue throughout the drilling of HH-2/2z except for two short shut-ins to enable the moving of oil storage tanks and installation of the drilling rig. The drilling rig is now scheduled to arrive on site following routine servicing after the completion of its current job.

 

The Horse Hill oil field and surrounding highly prospective PEDL137 and PEDL246 licences are operated by UKOG's subsidiary company Horse Hill Developments Ltd, in which UKOG holds a 77.9% direct interest.

 

Horse Hill 2018-19 EWT Oil Production Milestones:

 

·; 60,186 bbl aggregate Kimmeridge and Portland oil production

·; 29,568 bbl total Portland production

·; 30,618 bbl total Kimmeridge oil production

·; No discernible formation water produced from either reservoir

·; Stable Portland test production has continued to prove more oil in the ground

·; Kimmeridge flow resumed at more stable rates and flowing pressures after 5 month shut-in

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"The resumption of Kimmeridge oil flow at more stable rates than previously seen is welcome news for the Kimmeridge's commercial future and further justifies the decision to conduct simultaneous Portland drilling and HH-1 Kimmeridge test production at the site. The successful production switch from Portland to Kimmeridge now paves the way for the expected late summer arrival of the rig and the HH-2/2z Portland horizontal drilling and testing campaign.

 

The test results to date also signify that after a year of production testing, the simple non-optimised vertical HH-1 well remains capable of continuous production from both Portland and Kimmeridge zones at an aggregate rate of 450 bopd. Consequently, as a result of the test's ongoing success, in the opinion of the Directors, the future potential for significantly higher rates from the Portland HH-2z horizontal together with production from the underlying Kimmeridge therefore remains an even more tangible, imminent and exciting prospect."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has over 35 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria

Tel: 01483 900582

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford

Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald

Tel: 0207 397 8919

 

Novum Securities (Joint Broker) 

John Bellis

Tel: 020 7399 9400

 

Public Relations

Brian Alexander

Tel: 01483 900582

 

 

Glossary

 

 

core or coring

a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped core of undamaged in-situ rock. The core is captured in a steel pipe or "core barrel" above the bit. Core is normally cut in 20 ft lengths, or multiples of 20 ft, and normally with a diameter of 3.5 or 4 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of petrophysical and geomechanical parameters

extended well test or production test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over each zone of greater than 96 hours; the objective being to establish whether a discovery is commercially viable and the optimal methods of future production and recovery

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

 

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

40%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

50.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, two further appraisal wells scheduled for 2019

Horse Hill 5

PEDL246

50.635%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery plus further undrilled Kimmeridge exploration prospects.

5. Oil field with three productive and commercially viable zones, EWT ongoing, further drilling campaign scheduled, development underway subject to grant of planning consent expected in Q3 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLUAONRKKABOAR
Date   Source Headline
9th Apr 20219:05 amRNSSecond Price Monitoring Extn
9th Apr 20219:00 amRNSPrice Monitoring Extension
8th Apr 202111:05 amRNSSecond Price Monitoring Extn
8th Apr 202111:00 amRNSPrice Monitoring Extension
8th Apr 20219:05 amRNSSecond Price Monitoring Extn
8th Apr 20219:00 amRNSPrice Monitoring Extension
7th Apr 20214:41 pmRNSSecond Price Monitoring Extn
7th Apr 20214:36 pmRNSPrice Monitoring Extension
7th Apr 20217:00 amRNSFormal drilling consent for Basur-3 granted
6th Apr 20212:06 pmRNSSecond Price Monitoring Extn
6th Apr 20212:01 pmRNSPrice Monitoring Extension
1st Apr 20214:41 pmRNSSecond Price Monitoring Extn
1st Apr 20214:36 pmRNSPrice Monitoring Extension
31st Mar 20214:41 pmRNSSecond Price Monitoring Extn
31st Mar 20214:36 pmRNSPrice Monitoring Extension
31st Mar 202111:06 amRNSSecond Price Monitoring Extn
31st Mar 202111:00 amRNSPrice Monitoring Extension
31st Mar 20217:06 amRNSExtension to publication of final results
23rd Mar 20217:00 amRNSBasur-3 drilling site construction commences
4th Mar 20217:00 amRNSLoxley appeal inquiry scheduled for July 2021
15th Feb 20212:00 pmRNSPrice Monitoring Extension
11th Feb 20211:31 pmRNSSecond Instalment Purchase of Horse Hill Equipment
10th Feb 20217:01 amRNSJudge upholds injunction against unlawful protest
10th Feb 20217:00 amRNSLoxley appeal submitted to Planning Inspectorate
4th Feb 202111:25 amRNSInterim injuction against unlawful protest update
20th Jan 20217:00 amRNSCompletion of Resan licence agreement with AME
15th Jan 202110:00 amRNSHorse Hill oil field update
15th Jan 20218:44 amRNSAmended - Formal Government Consent - Resan
15th Jan 20217:00 amRNSGovernment consent - Resan licence acquisition
22nd Dec 20207:00 amRNSHorse Hill judicial review challenge dismissed
17th Dec 20207:00 amRNSAppeal against Loxley planning decision
10th Dec 20207:00 amRNSApplication for 3 new Turkish licences
4th Dec 20203:48 pmRNSExercise of Warrants
27th Nov 20204:41 pmRNSSecond Price Monitoring Extn
27th Nov 20204:36 pmRNSPrice Monitoring Extension
27th Nov 20203:42 pmRNSLoxley Gas Project Planning Consent Refused
25th Nov 202011:05 amRNSSecond Price Monitoring Extn
25th Nov 202011:00 amRNSPrice Monitoring Extension
20th Nov 20207:00 amRNSUpdate: Horse Hill Judicial Review
13th Nov 202012:35 pmRNSHorse Hill Judicial Review
5th Nov 20202:28 pmRNSHorse Hill oil field update
16th Oct 20207:00 amRNSDate for Loxley planning consent redetermination
14th Oct 20207:00 amRNSTurkey Resan licence update
2nd Oct 20202:06 pmRNSSecond Price Monitoring Extn
2nd Oct 20202:00 pmRNSPrice Monitoring Extension
2nd Oct 202011:43 amRNS£2.2m placing funding initial Turkey operations
1st Oct 202012:00 pmRNSHorse Hill-1 Portland intervention commences
21st Sep 20204:40 pmRNSSecond Price Monitoring Extn
21st Sep 20204:35 pmRNSPrice Monitoring Extension
21st Sep 20202:06 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.