The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0325
Bid: 0.03
Ask: 0.035
Change: 0.00 (0.00%)
Spread: 0.005 (16.667%)
Open: 0.0325
High: 0.0325
Low: 0.0325
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horndean Field Resource Report by D&M

23 Mar 2023 07:00

RNS Number : 9344T
UK Oil & Gas PLC
23 March 2023
 

UK Oil & Gas Plc

("UKOG" or the "Company")

 

 Horndean Field Resource Report by D&M

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that a new Competent Person's Report ("CPR") has been completed on the Horndean field (UKOG 10% non-operated interest) by Dallas, Texas based DeGolyer & MacNaughton ("D&M"), a globally recognised oil & gas reserve estimation and valuations consultancy. The CPR's findings are summarised in Tables 1 and 2 below.

Highlights:

· D&M completes CPR illustrating the present value of UKOG's 10% non-operated share of the Horndean oil field, located 10 miles north of Portsmouth, Hampshire.

 

· 179,300 barrels aggregate net UKOG 2P reserves + 2C contingent resources.

 

· £287,000 UKOG net share of oil sales revenues in 2022.

 

· Installation of new power-efficient surface pumps underway, expected to improve production rates and lower operating costs, potentially increasing profitability in 2023.

 

· The CPR's estimates of reserves and contingent resources are summarised in Tables 1 and 2 below.

 

Table 1: Horndean CPR Reserves Valuation

Case: D&M forward oil price

Full Field (100%)

UKOG Net (10%)

PRMS Reserves

1P

2P

3P

1P

2P

3P

Recoverable oil (million barrels)

0.86

1.00

1.17

0.09

0.10

0.12

 

Table 2: Horndean CPR Contingent Resources Valuation

Case: D&M forward oil price

Full Field (100%)

UKOG Net (10%)

PRMS Contingent Resources

1C

2C

3C

1C

2C

3C

Recoverable oil (million barrels)

0.3

0.8

1.3

0.03

0.08

0.13

 

The CPR was prepared in accordance with the requirements and standards of the Petroleum Resources Management System ("PRMS") of the Society of Petroleum Engineers and the sections of the CPR relevant to Horndean will be available on UKOG's website (www.ukogplc.com).

As of 31 December 2022, UKOG's 10% share of mid case 2P Reserves in the Horndean field is assessed at 99,500 barrels, with its share of mid case 2C Contingent Resources estimated at 79,800 barrels, an aggregate total of 179,300 UKOG net.

In 2022, UKOG's net share of Horndean production revenues was £287,000, with net earnings after costs of £136,000.

Total gross field production in 2022 averaged 101 barrels of oil per day despite significant well servicing work on three of the four production wells. New replacement surface pumps are now being installed and, consequently, it is expected that this will lead to increased production rates, lower electrical power consumption and a corresponding increase in 2023 field earnings. The operator, IGas plc, expects production rates to return to around 108 barrels of oil per day (gross) in 2023 when the new pumps are online.

Stephen Sanderson UKOG's Chief Executive commented:

 

"Although UKOG has a modest interest in Horndean, the CPR amply demonstrates that it continues to provide valuable earnings for the Company. We concur with the operator that the new pump upgrade should improve production rates, lower operating costs and, if oil prices remain around their current levels, potentially make Horndean more profitable than in 2022."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has 40 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

UK Oil & Gas PLC

Stephen Sanderson / Allen D Howard

 

Tel: 01483 941493

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Bavister / Andrew de Andrade

Tel: 020 7220 1666

 

Communications

Brian Alexander

Tel: 01483 941493

 

Glossary of Terms

1C

the low-case estimate of Contingent Resources. There is estimated to be a 90% probability that the quantities actually recovered could equal or exceed this estimate, i.e., P90 case

2C

the mid-case or average estimate of Contingent Resources. There is estimated to be a 50% probability that the quantities actually recovered could equal or exceed this estimate, i.e., P50 case

3C

the high-case of Contingent Resources. There is estimated to be a 10% probability that the quantities actually recovered could equal or exceed this estimate, i.e., P10 case

CPR

Competent Person's Report, a Petroleum Resources report prepared by an independent Competent Person(s), providing an estimated range of remaining recoverable resources and their potential monetary valuation in accordance with the relevant reporting standard, in this case PRMS. This CPR has not been prepared under the AIM rules for oil & gas companies

Contingent

Resources

those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations, but the applied project(s) are not yet considered mature enough for commercial development due to one or more contingencies. Contingent Resources are further categorised in accordance with the level of certainty associated with the estimates and may be sub-classified based on project maturity and/or characterised by their economic status

Field

A discovered and producing petroleum accumulation located within an area consisting of a single petroleum reservoir or multiple reservoirs all grouped on, or related to, the same individual geological structural feature and/or stratigraphic condition.

1P

the low-case estimate of Reserves. There is estimated to be a 90% probability that the quantities actually recovered could equal or exceed this estimate, i.e., P90 case

2P

the mid-case or average estimate of Reserves. There is estimated to be a 50% probability that the quantities actually recovered could equal or exceed this estimate, i.e., P50 case

3P

the high-case estimate of Reserves. There is estimated to be a 10% probability that the quantities actually recovered could equal or exceed this estimate, i.e., P10 case

PRMS

Petroleum Resources Management System created by the Society of Petroleum Engineers. A global standard of petroleum reserve and resource classification together with guidelines and accepted methodologies for the definition and estimation of petroleum resources and their monetary valuation

Reserves

those quantities of petroleum anticipated to be commercially recoverable by application of development projects to known accumulations from a given date forward under defined conditions. Reserves must satisfy four criteria: discovered, recoverable, commercial and remaining (as of the evaluation's effective date) based on the development project(s) applied. Reserves are further categorised in accordance with the level of certainty associated with the estimates and may be sub-classified based on project maturity and/or characterised by development and production status.

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the retained EU law version of the Market Abuse Regulation (EU) No. 596/2014 (the "UK MAR") which is part of UK law by virtue of the European Union (Withdrawal) Act 2018. The information is disclosed in accordance with the Company's obligations under Article 17 of the UK MAR. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCSEIEEEEDSEID
Date   Source Headline
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.