Gordon Stein, CFO of CleanTech Lithium, explains why CTL acquired the 23 Laguna Verde licenses. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0325
Bid: 0.03
Ask: 0.035
Change: 0.00 (0.00%)
Spread: 0.005 (16.667%)
Open: 0.0325
High: 0.0325
Low: 0.0325
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling Update at Broadford Bridge-1

26 Jun 2017 08:21

RNS Number : 1228J
UK Oil & Gas Investments PLC
26 June 2017
 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

Further Oil Seeps from Kimmeridge Limestone Core Samples at Broadford Bridge-1 Exploration Well, PEDL234 Licence, Weald Basin, UK

 

UK Oil & Gas Investments PLC (London AIM and NEX: UKOG) is delighted to announce that core, totalling 330 ft, has been successfully recovered from the Kimmeridge Limestone 4 ("KL4") target zone at its 100%-owned Broadford Bridge-1 ("BB-1") exploration well. Mobile light oil continued to be observed seeping from multiple sections of fractured KL4 calcareous shales and limestones throughout the cored section. Wet gas readings maintained high levels throughout the coring, being almost identical to those seen at the Horse Hill-1 ("HH-1") Kimmeridge Limestone oil discovery, 27 km to the north east. Mobile Kimmeridge oil was also recovered from the drilling fluid. Further core will be taken through the deeper KL3 target zone.

 

The presence of light mobile oil in fractured Kimmeridge shales is highly significant. At first look, this corroborates the finding from Horse Hill-1 that oil production was likely derived from a much larger reservoir "tank" than the two KL3 and KL4 zones alone. The possibility that we have encountered a single 600-700 feet thick, naturally fractured oil reservoir section, encompassing all four Kimmeridge Limestones and underlying a significant proportion of the wider Weald Basin, will now be rigorously examined during the flow testing programme.

 

The well remains on schedule and under budget.

The core taken to date in the Upper Kimmeridge Shales and Limestones is now under extensive geological, petrophysical and geo-mechanical analysis by COREX in Aberdeen and Premier Oilfield Laboratories in Houston, Texas, and Bartlesville, Oklahoma, USA.

Stephen Sanderson, UKOG's Executive Chairman commented:

 

"The coring programme continues to deliver positive results and important new insights into this continuous oil accumulation, the first of its kind discovered in the UK.

Following the KL3 and contingent KL2 coring programmes, we will run electric logs, set the final 7-inch steel casing and then, following the grant of the remaining necessary regulatory permissions, move straight to extended flow testing operations around the second half of July."

About Coring

 

Coring is a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped core of undamaged in-situ rock. The core is captured in a steel pipe or "core barrel" above the core bit. Core is normally cut in 30 feet lengths, or multiples of 30 feet, and in the case of BB-1 with a diameter of 4 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of geological, petrophysical and geomechanical parameters, and of any hydrocarbons and fluids contained within the rock.

 

About BB-1

 

BB-1 is located near Billingshurst, West Sussex, within the 300 km² PEDL234 licence, in which the Company has a 100% interest via its ownership of the licence's operator, Kimmeridge Oil & Gas Limited ("KOGL"). The well, an exploration step-out, is designed to penetrate four naturally fractured Kimmeridge Limestone units (KL1-KL4), the uppermost two units of which flowed at record rates in the Horse Hill-1 discovery near Gatwick Airport.

 

Importantly, to prove that the Kimmeridge Limestones lie within an extensive continuous oil deposit, the BB-1 well was deliberately designed to test a feature with no structural or stratigraphic closure at the KL1-KL4 horizons.

 

The plan is now to core the KL3 target zone and then continue to drill 8 ½" diameter hole at a constant inclination of 54 degrees to vertical to total depth. Further core may be taken in KL2. The planned overall horizontal deviation of the well is approximately 1 km. The Kimmeridge Limestones (KL 1 to KL4) are expected to be encountered at a drilled depth of approximately 1250-1700 metres, which equates to around 950-1200 metres vertically below the surface.

 

Qualified Person's Statement

 

Stephen Sanderson, UKOG's Executive Chairman, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information, please contact:

 

UK Oil & Gas Investments PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 243450

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Bavister Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Nick Tulloch / Neil McDonald Tel: 0131 220 6939

 

Square 1 Consulting (Public Relations)

Brian Alexander / David Bick Tel: 01483 243450 / 020 7929 5599

 

 Glossary:

casing

heavy gauge steel tubing designed to line the wall of a well. The casing provides a safe controlled space in which the drill pipe and bit can operate in isolation from conditions in overlying rock units. The steel tubing is bonded to the surrounding rock by impermeable concrete, known as "cement"

core or coring

a drilling technique that involves using a doughnut-shaped drilling bit to capture or "cut" a continuous cylinder-shaped core of undamaged in-situ rock. The core is captured in a steel pipe or "core barrel" above the bit. Core is normally cut in 30 feet lengths, or multiples of 30 feet, and normally with a diameter of 3.5 or 4 inches. Core is taken in petroleum reservoir rocks for detailed laboratory analyses of petrophysical and geomechanical parameters

continuous oil deposit or resource deposit

a petroleum accumulation that is pervasive throughout a large area, which is not significantly affected by hydrodynamic influences (i.e. the buoyancy of oil in water) and is not trapped by structural or stratigraphic geological conditions. The deposit, in contrast to conventional accumulations, has therefore not accumulated by the migration of petroleum over medium to long distances. The petroleum in such deposits is found within, or immediately adjacent or close to, the pore spaces where the petroleum is generated, i.e. those pore spaces lying within petroleum source rocks containing organic rich compounds (kerogen) that, when heated over geological time, transform into petroleum. These accumulations are generally associated with organic-rich shales such as the Kimmeridge Clay Formation. Such accumulations do not generally contain significant volumes of free, mobile formation water and therefore have no observable hydrocarbon-water contacts. The extent of the accumulation is generally defined by the limit of where burial depths have been sufficient to transform organic matter within the petroleum source rock unit into petroleum.

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

naturally fractured reservoir

a fractured reservoir contains open and usually connected cracks or fissures within the rock matrix; fractures can enhance permeability of rocks greatly by connecting pore-spaces together; naturally fractured reservoirs have been created over geological time by nature, not man-made via hydraulic fracturing

shale

a fissile rock that is formed by the consolidation of clay, mud, or silt particles, and that has a finely stratified or laminated structure. Certain shales, such as those of the Kimmeridge Clay, often contain a significant proportion of organic material, which when subject to increasing temperature and pressure over geological time transform into petroleum (known as petroleum "source rocks")

step-out well

a well specifically designed to determine the lateral extent of a discovered hydrocarbon accumulation or play

wet gas

natural gas, predominantly consisting of methane (C1), ethane (C2) and propane (C3) but also containing the longer molecular chain natural gases butane and iso-butane (C4), pentane and iso-pentane (C5). The C4 and C5 gases are created during oil-generation within a petroleum source rock unit when oil is thermally cracked. At Horse Hill these natural gases lie in solution with the oil in the KL3 and KL4 Kimmeridge Limestone reservoirs (i.e. solution or associated gas and not as a separate free-gas phase).

 

UKOG Licence Interests

 

The Company has interests in the following ten UK licences:

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field in stable production

Baxters Copse 2

PEDL233

50%

UKOG Weald Limited

IGas Energy Plc

89.6

Appraisal/development well planned; licence extended to 2018

Broadford Bridge 3

PEDL234

100%

Kimmeridge Oil & Gas Limited 4

Kimmeridge Oil & Gas Limited 4

300.0

BB-1 drilling underway

Holmwood 3

PEDL143

30%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

Holmwood-1 exploration well planned in 2017

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

31.2%

Horse Hill Developments Ltd ⁶

Horse Hill Developments Ltd ⁶

99.3

Submitted planning application for long term production tests and drilling of two wells

Horse Hill 5

PEDL246

31.2%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Offshore) 3

P1916

100%

UKOG Solent Limited

UKOG Solent Limited

46.7

Preparing drilling planning submission

Isle of Wight (Onshore) 2, 3

PEDL331

65%

UKOG

TBA

200.0

Preparing drilling planning submission

Markwells Wood 2

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

Submitted planning application for appraisal and field development

 

Notes:

1. Oil field currently in production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads. Contains the extension of the Godley Bridge Portland gas discovery and the site of the forthcoming Broadford Bridge-1 well.

4. UKOG has a 100% interest in Kimmeridge Oil & Gas Limited, which has a 100% interest in PEDL234.

5. Oil discovery with recently completed flow testing.

6. UKOG has a direct 48% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLMMGZVNVNGNZG
Date   Source Headline
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.