Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTungsten West Regulatory News (TUN)

Share Price Information for Tungsten West (TUN)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.75
Bid: 5.50
Ask: 6.00
Change: 0.50 (9.09%)
Spread: 0.50 (9.091%)
Open: 5.50
High: 6.00
Low: 6.00
Prev. Close: 5.50
TUN Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Increased Mineral Resource & Ore Reserve Estimates

19 Dec 2022 07:00

RNS Number : 0786K
Tungsten West PLC
19 December 2022
 

Tungsten West Plc

("Tungsten West", the "Company" or the "Group")

 

Increase in Mineral Resource and Ore Reserve Estimates for the Hemerdon Project

 

 

Tungsten West plc (LON: TUN), the mining company focussed on restarting production at the Hemerdon tungsten and tin mine ("Hemerdon" or the "Project") in Devon in the UK, is pleased to provide this update on the JORC (2012) compliant Ore Reserve Estimate ("ORE") and internal Mineral Resource Estimate ("MRE"), as part of the work completed for its updated Feasibility Study for its flagship Hemerdon Project.

 

Hemerdon Ore Reserve Estimate Highlights:

· 60% increase in ore tonnage and 10% increase in contained metal from previous 2021 ORE

· The 2022 Hemerdon Ore Reserve is now 101.2Mt at 0.14% WO3 and 0.03% Sn

· The Hemerdon deposit is estimated to be the second largest reported CRIRSCO standard tungsten reserve globally

 

Hemerdon Mineral Resource Estimate Highlights:

· 7% increase in tonnage and 1% increase in contained metal from previous 2021 MRE

· The 2022 Hemerdon Global Mineral resource is 351.5Mt at 0.12% WO3 and 0.03% Sn

· The Hemerdon deposit is now estimated to be the second largest reported CRIRSCO standard tungsten resource globally

 

Mark Thompson, Executive Vice-Chairman, commented: "The increase in both the Ore Reserve and Mineral Resource at Hemerdon further highlights the world class nature of the deposit we have in Devon, which now hosts the second largest tungsten reserve and resource, globally.

 

"The lift in both the Ore Reserve and Mineral Resource is a reflection on the work that has been undertaken this year as part of our cost saving initiative and improvement to operating efficiencies across the business. This will also be realised in our updated Feasibility Study, a summary of which we expect to release shortly.

 

"Within a year of acquiring the Project, we undertook the first exploration drilling programmes in almost 30 years. These programmes had significant success in growing the Mineral Resources and we have complemented that with the development of an enhanced mineral beneficiation flowsheet and energy saving initiatives to reduce our processing costs. These initiatives, in turn, have had a positive impact of the Ore Reserves.

 

"We intend to continue to build on this world class asset and continue the trend of adding value through reserve and resource growth through future drilling campaigns as indicated by the scale of the proposed exploration target."

 

Further information

2022 Hemerdon Ore Reserve Estimate

This Ore Reserve Estimate is based on the MRE update completed in January 2021 by independent mining consultants Mining Plus UK Ltd ("MPUK") and is underpinned by a pit optimisation study conducted by MPUK during October 2022, followed by detailed pit design, pushback design, Life of Mine scheduling and financial modelling. All reserves are reported in accordance with the 2012 edition of the JORC code.

The total updated Ore Reserve Estimate (Proved and Probable) for Hemerdon is 101.2 Mt at 0.14% WO3 and 0.03% Sn, reported above an Ore Reserve cut-off grade of 0.0742% WO3 Equivalent ("WO3Eq") for the granite and 0.0689% WO3Eq for the killas. This Ore Reserve includes 0.6 Mt of existing stockpiles remaining from the previous site operator, Wolf Minerals, open pit mining operations (2015-2018).

Both the Hemerdon granite and the host metasedimentary material (locally known as "killas") within the final pit design are included in this Ore Reserve. To maximise project Net Present Value ("NPV") the Project plans to stockpile the lower grade (but still economic) killas material until completion of the mining phase, at which time the killas stockpiles will be reclaimed and fed through the mineral processing facility ("MPF").

Table of Ore Reserve Estimates

Ore Type

Cut-off WO3 Eq

(%)

Proved Ore Reserves

Probable Ore Reserves

Total Ore Reserves

Tonnes (Mt)

WO3 (%)

Sn (%)

Tonnes (Mt)

WO3 (%)

Sn (%)

Tonnes (Mt)

WO3 (%)

Sn (%)

Granite

0.0742

32.1

0.18

0.03

24.0

0.17

0.02

56.1

0.17

0.03

Killas

0.0689

8.3

0.11

0.03

36.3

0.10

0.03

44.5

0.10

0.03

Sub-total

N/A

40.4

0.16

0.03

60.2

0.13

0.03

100.6

0.14

0.03

Stockpiles

N/A

0.6

0.20

0.06

-

-

-

0.6

0.20

0.06

Total

-

41.0

0.17

0.03

60.2

0.13

0.03

101.2

0.14

0.03

Notes to accompany Ore Reserves table:

1. The Qualified Person for the estimate is Mr. Adriano Carneiro, fellow AusIMM, a MPUK employee. The estimate has an effective date of 15 November 2022.

2. Ore Reserves are reported using the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (The JORC Code) 2012 Edition.

3. Numbers may not add up due to rounding. Rounding as required by reporting guidelines may result in apparent differences between tonnes, grade and contained metal content.

4. All tonnages reported are dry metric tonnes.

5. WO3Eq calculated as WO3Eq = WO3 + (0.4942*Sn) for granite and WO3Eq = WO3 + (0.3794*Sn) for killas.

 

2022 Hemerdon Mineral Resource Estimate

The Updated Hemerdon Mineral Resource Estimate, prepared internally by the Company, includes the in-situ mineralised granite and killas domains alongside stockpile and tailings material generated as a result of the former mining operations between 2015 and 2018. All Mineral Resources are reported in accordance with the 2012 edition of the JORC code.

The 2022 MRE update is based on the 2021 estimate produced by MPUK that has been re-reported with updated cost and processing assumptions as a result of the operational redevelopment undertaken as part of the 2022 Feasibility Study. There have been no material differences in geological interpretation or data used to support the estimation since 2021. This is to ensure alignment with the updated mineral reserve and has resulted in a reduction in the breakeven ("BE") cut-off grade ("CoG"). The updated 2022 Hemerdon Mineral Resource is therefore reported above a WO3 Eq BE CoG of 0.064% for granite and 0.062% for killas within an optimised pit shell generated using the same economic parameters used to calculate the BE CoG.

Furthermore, the 2022 MRE reflects updated changes to the Hemerdon stockpile inventory following depletion of various stockpiles since the 2021 reported MRE as part of aggregate sales.

The 2021 MRE prepared by MPUK for the resource contained within the Mine Waste Facility ("MWF") generated through former operations remains unchanged as a component of the global Hemerdon Mineral Resource Estimate.

The changes to the updated 2022 MRE are minimal and can be summarised as a 7% overall increase in tonnes and a 1% increase in contained metal. The reason for the minor difference in overall ore tonnes due to the minor change to the granite BE CoG. Any increases to the overall tonnes can be attributed to the more noticeable reduction in the killas BE CoG.

Table of Global Mineral Resources Estimate

Domain

Cut-Off WO3 Eq (5)

Measured

Indicated

Inferred

Tonnes (Mt)

WO (%)

Sn (%)

WO3_EQ (%)

Tonnes (Mt)

WO (%)

Sn (%)

WO3_EQ (%)

Tonnes (Mt)

WO (%)

Sn (%)

WO3_EQ (%)

Granite

0.064%

33.6

0.18

0.03

0.19

84.0

0.15

0.02

0.16

36.5

0.11

0.02

0.12

Killas

0.062%

8.5

0.11

0.03

0.13

44.7

0.10

0.03

0.11

140.4

0.09

0.03

0.10

Stockpiles

N/A

0.6

0.20

0.06

0.23

-

-

-

-

-

-

-

-

MWF

N/A

-

-

-

-

-

-

-

-

3.2

0.18

0.02

0.18

Total

-

42.8

0.16

0.03

0.18

128.6

0.13

0.03

0.14

180.1

0.10

0.03

0.11

Notes to accompany Mineral Resource table

1. The Qualified Person for the estimate is Mr. James McFarlane, BSc (hons), MSc, MCSM, FGS, CEng FIMMM, RPGeo MAIG, FIQ, a Tungsten West employee. The estimate has an effective date of 11th October 2022.

2. Mineral Resources are reported using the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (The JORC Code) 2012 Edition.

3. Numbers may not add up due to rounding. Rounding as required by reporting guidelines may result in apparent differences between tonnes, grade and contained metal content.

4. All tonnages reported are dry metric tonnes.

5. WO3 Eq calculated as [[Sn%*0.379]+WO₃%].

 

Exploration Target

 

The 2022 Hemerdon MRE retains the previously proposed exploration target from the 2021 MRE for Hemerdon of ~55.7 to 83.5 Mt of granite at a grade of ~0.09 to 0.13% WO3 and ~272 to 408 Mt of killas at a grade of ~0.10 to 0.14% WO3. In reporting the exploration target it should be made clear that the potential quantity and grade is conceptual in nature, that there has been insufficient exploration to estimate a Mineral Resource and that it is uncertain if further exploration will result in the estimation of a Mineral Resource.

The exploration target is based on drilling data for the Hemerdon deposit which has been estimated within the Hemerdon block model above cut off grades but does not exhibit sufficient geological continuity to be classified as a Mineral Resource under the JORC Code 2012 edition. As such the exploration target is reported as a range of grade and tonnage to reflect this uncertainty based on an assessment of the grade-tonnage curves of this material whereby a range of +/-20% was deemed reasonable.

The scale of the exploration target exhibits the future potential for the Mineral Resources and Ore Reserve to continue to grow with future drilling campaigns, which will be undertaken regularly to further define the resource and explore for additional material as part of the operational strategy when in production.

 

Further Updates

 

The updated Mineral Resource and Ore Reserve Estimates form a fundamental aspect of the updated and independently reviewed Feasibility Study for which the Company expects to publish the summary result of in the coming days. The Company will also continue to provide further guidance on Project progress as milestones are completed.

 

 

 

Competent Persons Statements:

Information in this announcement pertaining to Reporting of Sampling Techniques and Data, Exploration Results and Estimation and Reporting of Mineral Resources has been reviewed and approved by Mr James McFarlane, BSc (Hons), MSc, MCSM, FGS, CEng FIMMM, RPGeo MAIG, FIQ . Mr McFarlane holds a BSc with Honours from The University of Wales, Aberystwyth in Environmental Earth Science and an MSc in Mining Geology from Camborne School of Mines, University of Exeter, he is also a Master of the Camborne School of Mines (MCSM). Mr McFarlane is a Fellow of the Geological Society of London (FGS), a Chartered Engineer (CEng) and Fellow of the Institute of Materials, Minerals and Mining (FIMMM) through which he is also a Registered Mineral Resources and Reserves Reporting Practitioner. Mr McFarlane is a Member of the Australian Institute of Geoscientists (MAIG) and through which is Registered Professional Geoscientist in the joint fields of Mining and Mineral Exploration (RPGeo). Mr McFarlane is also a Fellow of the Institute of Quarrying (FIQ). Mr McFarlane is an employee of the Company. Mr McFarlane has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined by the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code) and under the AIM Rules

- Note for Mining and Oil & Gas Companies, which outline standards of disclosure for mineral projects. Mr McFarlane consents to the inclusion in this announcement of the matters based on this information in the form and context in which it appears. Mr McFarlane confirms that the Company is not aware of any new information or data that materially affects the information included in the relevant market announcements, and that the form and context in which the information has been presented has not been materially modified.

The information in this release that relates to the Estimation and Reporting of Ore Reserves has been compiled by Mr Adriano Carneiro BEng (Mining) FAusIMM. Mr Carneiro is a full-time employee of Mining Plus UK Limited Ltd and has acted as the Competent Person on the Hemerdon deposit Ore Reserve Estimation. Mr Carneiro is a Fellow Professional of the Australasian Institute of Mining and Metallurgy and has sufficient experience with the commodity, style of mineralisation and deposit type under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (The JORC Code).

- Note for Mining and Oil & Gas Companies, which outline standards of disclosure for mineral projects. Mr. Carneiro consents to the inclusion in this report of the contained technical information relating the Ore Reserve Estimation in the form and context in which it appears. Mr Carneiro confirms that the Company is not aware of any new information or data that materially affects the information included in the relevant market announcements, and that the form and context in which the information has been presented has not been materially modified.

For more information on the Project, including the JORC Table 1, please see the following page of the Company's website: https://www.tungstenwest.com/project  

 

This announcement contains inside information for the purposes of Article 7 of Regulation 596/2014 as amended by the Market Abuse (Amendment) (EU Exit) Regulations 2019.

 

 

 

 

 

Enquiries

 

Tungsten West

Mark Thompson

Tel: +44 (0) 203 178 7385

 

Strand Hanson

(Nominated Adviser and Financial Adviser)

James Spinney / James Dance / Abigail Wennington

Tel: +44 (0) 207 409 3494

BlytheRay

(Financial PR)

Tim Blythe / Megan Ray

Tel: +44 (0) 207 138 3204

Email: TungstenWest@blytheray.com

Hannam & Partners

(Joint Broker)

Andrew Chubb / Matt Hasson / Jay Ashfield

+44 (0)20 7907 8500

 

VSA Capital Group plc

(Joint Broker)

Andrew Raca / Andrew Monk

+44 (0)20 3005 5000

 

Follow us on twitter @TungstenWest

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDKZMMZMRMGZZZ
12
Date   Source Headline
28th Mar 20247:00 amRNSConvertible Loan Note Update
25th Mar 20242:00 pmRNSCommencement of EA public consultation period
7th Feb 20247:00 amRNSTR-1: Notification of major holdings
5th Feb 20247:00 amRNSReceipt of Draft Permit for MPF
22nd Dec 20237:00 amRNSHalf Year Results
18th Dec 20237:00 amRNSConvertible Loan Note Update
10th Nov 20237:00 amRNSAppointment of Chief Financial Officer
10th Oct 20234:45 pmRNSResults of Annual General Meeting
15th Sep 20233:45 pmRNSNotice of AGM
14th Sep 20237:00 amRNSFinal Results for the year ended 31 March 2023
4th Sep 202310:28 amRNSAppointment of Non-Executive Directors
16th Aug 20237:00 amRNSProject Update
16th Aug 20237:00 amRNSDirectorate and Management Change
16th Aug 20237:00 amRNSCorporate Update
12th Jun 20237:00 amRNSFusion Energy Collaboration
9th Jun 20237:00 amRNSResults of General Meeting
2nd Jun 20237:00 amRNSInterim Tungsten and Tin Production
19th May 20231:41 pmRNSReplacement Convertible Loan Notes Documentation
19th May 20237:00 amRNSConvertible Loan Notes Documentation
18th May 20237:00 amRNSBoard Change
28th Apr 20239:29 amRNSManagement Change
6th Apr 20233:13 pmRNSResult of Oversubscribed Convertible Loan Note
3rd Apr 20237:00 amRNSRestructuring exercise and Board Changes
30th Mar 20232:05 pmRNSSecond Price Monitoring Extn
30th Mar 20232:00 pmRNSPrice Monitoring Extension
28th Mar 20231:00 pmRNSBoard Changes
13th Mar 20237:32 amRNSDirectorate and Management Changes
16th Jan 202311:05 amRNSSecond Price Monitoring Extn
16th Jan 202311:00 amRNSPrice Monitoring Extension
16th Jan 20237:00 amRNSUpdated Feasibility Study Delivers Further Value
19th Dec 20227:00 amRNSIncreased Mineral Resource & Ore Reserve Estimates
15th Dec 20227:00 amRNSKey Permit Awards
12th Dec 20227:00 amRNSHalf Year Results
28th Nov 20227:00 amRNSBoard Changes
11th Oct 20227:00 amRNSTrading Update
27th Sep 20227:00 amRNSGrant of Options
14th Sep 20222:52 pmRNSResults of Annual General Meeting
13th Sep 20227:00 amRNSFinance and Trading Update
8th Aug 20228:58 amRNSResults for the year ended 31 March 2022
20th Jul 20224:41 pmRNSSecond Price Monitoring Extn
20th Jul 20224:36 pmRNSPrice Monitoring Extension
20th Jul 20222:05 pmRNSSecond Price Monitoring Extn
20th Jul 20222:00 pmRNSPrice Monitoring Extension
20th Jul 202211:05 amRNSSecond Price Monitoring Extn
20th Jul 202211:00 amRNSPrice Monitoring Extension
19th Jul 20227:00 amRNSRestarting Hemerdon Mine and Directorate Changes
21st Apr 202211:06 amRNSSecond Price Monitoring Extn
21st Apr 202211:00 amRNSPrice Monitoring Extension
21st Apr 20228:02 amRNSUpdated Development Strategy for Hemerdon Projects
8th Apr 20227:00 amRNSExercise of Warrants
12

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.