George Frangeskides, Chairman at ALBA, explains why the Pilbara Lithium option ‘was too good to miss’. Watch the video here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.20
Bid: 1.10
Ask: 1.30
Change: 0.00 (0.00%)
Spread: 0.20 (18.182%)
Open: 1.20
High: 1.20
Low: 1.20
Prev. Close: 1.20
THR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Resource Estimate Commissioned - Moonta Copper

23 Apr 2019 07:00

RNS Number : 7598W
Thor Mining PLC
23 April 2019
 

23 April 2019

 

RESOURCE ESTIMATE COMMISSIONED - MOONTA COPPER PROJECT

The Board of Thor Mining Plc ("Thor" or the "Company") (AIM, ASX: THR), is pleased to announce it has been advised by Enviro Copper Limited ("Enviro Copper") of commencement of resource estimation work for several of the deposits at the Moonta Copper Project in South Australia.

Enviro Copper Ltd, via its subsidiary Environmental Metals Recovery Pty Ltd (EMR) is earning up to a 75% interest in the Moonta Copper project from Andromeda Metals Ltd (ASX: "ADN").

 

Highlights:

· Mining consultancy, Mining Plus engaged to prepare a Mineral Resource Estimate on several of the deposits at the Moonta Copper Project considered amenable to Insitu Recovery (ISR);

· Numerous drill holes into some Moonta deposits over several decades, provide basis for resource estimation;

· Thor Mining PLC to hold up to 30% equity in Enviro Copper prior to listing activities, potentially scheduled for later in 2019;

 

Mick Billing, Executive Chairman, commented:

"This is a very exciting development in our copper strategy, to develop a potentially large ISR focussed copper business, initially in Australia."

"The non-invasive production technique of In-situ Recovery of copper has the potential to co-exist without significant disruption to farming and once completed, have little to no impact on future agricultural land use. ISR is an extension of proven technology and has been in use since the 1960's. With recent technical advances ISR can now offer a lower footprint and is likely to find further application in mineral recovery fields because it can coexist with other land use activities."

"The Moonta project, hosts oxide copper minerals and some secondary sulphide copper minerals in deep weathered troughs, indicating early stage potential for copper production via ISR methods."

 

A map showing the location of the Moonta project may be accessed from the Thor website via the following link:

http://thormining.com/-/thor/lib/images/maps/Kapunda%20Moonta.jpg

 

Further Information

A Memorandum of Understanding (MOU) announced 5 March 2019, subject to a 90 day due diligence period, was executed between Thor Mining, Environmental Copper Recovery Pty Ltd ("ECR") (holding earn-in rights to 75% of that part of the Kapunda Copper project amenable to ISR), and Environmental Metals Recovery Pty Ltd (holding earning rights, subject to due diligence, to 75% of Moonta copper project comprising the northern portion of exploration licence EL5984), for the merging of the respective interests, and the formation of Enviro Copper Limited, to hold and advance those interests.

 Thor Mining PLC holds rights to a 60% interest in ECR for the consideration of A$1.8million in project funding (A$0.6 million funded to date). Under the MOU, Thor will relinquish its interest in ECR and acquire a 25%, pre-listing, interest in Enviro Copper for total funding of A$0.6million (funds already provided). Further Thor will hold the right to acquire a further 5% seed capital interest in Enviro Copper Limited for consideration of an additional A$0.4 million.

The Agreement is conditional upon satisfactory due diligence in respect of the Moonta project acquisition from Andromeda Metals Limited (ASX: ADN) by Environmental Metals Recovery Pty Ltd (refer ADN announcement to ASX dated 19 December 2018).

The Moonta project comprises steeply dipping zones of copper oxide mineralisation hosted within a deep weathering trough interpreted to extend over 11 kilometres strike length, and potentially beyond. The prospect is entirely under sedimentary cover with variable amounts of geological data from drilling in addition to data from geophysical surveys. Copper mineralisation within the trough is in the order of 50 to 75 metres width with drill intersections in excess of 350 metres deep. In areas where there is enough drill information, grades appear to be in the order of 0.18 - 0.23% copper.

 

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

Enquiries:

Mick Billing

+61 (8) 7324 1935

Thor Mining PLC

Executive Chairman

Ray Ridge

+61 (8) 7324 1935

Thor Mining PLC

CFO/Company

Secretary

Colin Aaronson/

Richard Tonthat/ Ben Roberts

+44 (0) 207 383 5100

 

Grant Thornton UK LLP

 

Nominated Adviser

Nick Emerson

+44 (0) 1483 413 500

SI Capital Ltd

Joint Broker

David Hignell / Rob Rees 

+44 (0) 20 3470 0470

SP Angel Corporate Finance LLP

Joint Broker

Tim Blythe/ Camilla Horsfall

+44 (0) 207 138 3222

Blytheweigh

Financial PR

 

Competent Person's Report

The information in this report that relates to exploration results is based on information compiled by Leon Faulkner, who holds a BSc in geology and who is a Member of The Australasian Institute of Geoscientists. Mr Faulkner is an employee of Environmental Metals Recovery Pty Ltd. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Leon Faulkner consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

Updates on the Company's activities are regularly posted on Thor's website  www.thormining.com, which includes a facility to register to receive these updates by email, and on the Company's twitter page @ThorMining.

 

About Moonta

The Moonta copper project forms part of exploration licence EL5984 and is located on the Yorke Peninsula in South Australia approximately 160 kilometres north north-east of Adelaide.

The licence area sits within the historical "copper triangle" of South Australia where high grade copper was mined and processed from the 1860's until the 1920's producing a reported 300,000 tonnes of copper.

The tenement is highly mineralised, and includes numerous historically mined deposits, as well as more recent copper discoveries, including the Bruce Zone at Alford West, and the Wombat deposit three kilometres to the west.

The Bruce and Wombat deposits are considered to have a number of critical attributes which may allow copper production via insitu recovery (ISR) techniques. Both deposits are characterised by deeply developed weathering troughs that extend hundreds of metres below surface. The rocks to both the north and south are fresh and impermeable while the trough material contains copper mineralisation that is oxidised, porous, and likely permeable, and is situated below both the water table and sea level. Both deposits remain open along strike, presenting opportunities to find further mineralisation in the trough extensions.

 

About Thor Mining PLC

Thor Mining PLC (AIM, ASX: THR) is a resources company quoted on the AIM Market of the London Stock Exchange and on ASX in Australia.

Thor holds 100% of the advanced Molyhil tungsten project in the Northern Territory of Australia, for which an updated feasibility study in August 2018¹ suggested attractive returns.

Adjacent Molyhil, at Bonya, Thor holds a 40% interest in deposits of tungsten, copper, and vanadium, including an Inferred resource for the Bonya copper deposit².

Thor also holds 100% of the Pilot Mountain tungsten project in Nevada USA which has a JORC 2012 Indicated and Inferred Resources Estimate³ on 2 of the 4 known deposits. The US Department of the Interior has confirmed that tungsten, the primary resource mineral at Pilot Mountain, has been included in the final list of Critical Minerals 2018.

Thor is also acquiring up to a 60% interest Australian copper development company Environmental Copper Recovery SA Pty Ltd, which in turn holds rights to earn up to a 75% interest in the mineral rights and claims over the resource on the portion of the historic Kapunda copper mine in South Australia recoverable by way of in situ recovery.

Thor has an interest in Hawkstone Mining Limited, an Australian ASX listed company with a 100% Interest in a Lithium project in Arizona, USA.

Finally, Thor also holds a production royalty entitlement from the Spring Hill Gold project⁵ of:

 A$6 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for up to A$1,500 per ounce; and

 A$14 per ounce of gold produced from the Spring Hill tenements where the gold produced is sold for amounts over A$1,500 per ounce.

Notes

¹ Refer ASX and AIM announcement of 23 August 2018

² Refer ASX and AIM announcement of 26 November 2018

³ Refer AIM announcement of 13 December 2018 and ASX announcement of 14 December 2018

 Refer AIM announcement of 10 February 2016 and ASX announcement of 12 February 2018

 Refer AIM announcement of 26 February 2016 and ASX announcement of 29 February 2016

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCUOSVRKVASURR
Date   Source Headline
24th Apr 20247:00 amRNSCompletion of Stage 1 Earn-In Commitment - Molyhil
6th Mar 20247:00 amRNS3D Model Shows Alford East Copper Mineralisation
5th Mar 20247:00 amRNSHalf-year Report
29th Feb 20247:00 amRNSHigh Grade Uranium and Vanadium Assays Results
30th Jan 20247:00 amRNSQuarterly Activities and Cash Flow Report
25th Jan 20247:00 amRNSAlligator completes Initial Investment in ECL
18th Jan 20247:00 amRNSUranium Update
18th Dec 20237:30 amRNSAlligator Energy Invests into ISR Copper
18th Dec 20237:00 amRNSEnviroCopper Ltd to Acquire Alford West Tenement
11th Dec 20237:00 amRNSCopper Recoveries Advance ISR Assessment
4th Dec 20237:00 amRNSHigh-Grade Uranium Intercepts at Groundhog
30th Nov 202312:00 pmRNSConference Attendance
29th Nov 202310:50 amRNSResult of AGM
22nd Nov 20237:00 amRNSDrilling Program Completed
15th Nov 20237:00 amRNSSignificant Uranium Mineralisation Intercepted
8th Nov 20231:30 pmRNSDrilling starts at Molyhil Tungsten Project
7th Nov 20237:00 amRNSCopper Hosting Troughs Defined by ANT Surveys
3rd Nov 20237:05 amRNSIncreases interest in Alford East Project to 80%
3rd Nov 20237:05 amRNSNotice of AGM
31st Oct 20237:00 amRNSQuarterly Activities and Cash Flow Report
26th Oct 20237:00 amRNSCorporate Presentation
23rd Oct 20237:00 amRNSDirector/PDMR Shareholding
18th Oct 20237:30 amRNSUranium Drilling Commences
3rd Oct 20237:00 amRNSANT Geophysical Surveys Commence
20th Sep 20237:00 amRNSEquity Placing to Accelerate Uranium Drilling
18th Sep 20237:30 amRNSASX Trading Halt
13th Sep 20237:00 amRNSKey Environmental Approvals Granted
4th Sep 20237:00 amRNSFleet Space Technologies Collaboration
23rd Aug 202310:56 amRNSResult of GM & Share Capital Consolidation
17th Aug 20237:00 amRNSUranium Drilling Approvals Granted
4th Aug 20237:00 amRNSProposed Share Consolidation and Notice of GM
31st Jul 20237:00 amRNSQuarterly Activities and Cash Flow Report
27th Jul 20237:00 amRNSUranium Targets Identified
31st May 20237:00 amRNSAirborne Magnetic & Radiometric Surveys Commence
22nd May 20237:00 amRNSShareholder and Investor Event
3rd May 20237:00 amRNSRIU Sydney Conference Attendance
28th Apr 20237:33 amRNSQuarterly Activities and Cash Flow Report
26th Apr 20237:00 amRNSAlford East: High-grade Rare Earth Discovery
24th Apr 20237:00 amRNSPositive Vanadium Assay Results
17th Apr 20237:00 amRNSAlford West Project Survey Results
28th Mar 20237:00 amRNSHolding(s) in Company
20th Mar 20237:31 amRNSDirector/PDMR Shareholding
14th Mar 20237:00 amRNSHalf-year Report
8th Mar 20237:00 amRNSCorporate Presentation
2nd Mar 20237:00 amRNSGeophysics Commences at Alford West Project
13th Feb 20238:38 amRNSDirector/PDMR Shareholding
8th Feb 20237:00 amRNSDirector/PDMR Shareholding
31st Jan 20237:50 amRNSQuarterly Activities and Cash Flow Report
23rd Jan 20232:05 pmRNSSecond Price Monitoring Extn
23rd Jan 20232:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.