SpaceX IPO launches today. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTern Regulatory News (TERN)

Share Price Information for Tern (TERN)

Share Price is delayed by 15 minutes
Get Live Data
1.20    0.00 (0.00%)
Bid:
1.10
Ask:
1.30
Spread: 0.20 (18.182%)
Market Cap: £10.27m
TERN Live PriceLast checked at - London Stock Exchange

Intraday Tern Share Chart

Operations Update

10 Nov 2011 07:00

RNS Number : 8213R
Silvermere Energy PLC
10 November 2011
Β 

ο»Ώ

10 November 2011

Β 

Β 

Silvermere Energy PLC

("Silvermere" or "the Company")

Β 

Operations Update

Β 

Β 

Silvermere Energy PLC. ("Silvermere" or the "Company"), the independent oil and gas company focusing principally on exploration, appraisal and production opportunities in the US, is pleased to confirm that preparations for production from the I-1 well on its Mustang Island asset located in Kleberg County, Texas waters in the Gulf of MexicoΒ Β are well advanced and remain in line with previous advice that production is scheduled to commence before the end of 2011.

Β 

The operator, Dominion Production Company LLC, has reported to the Company that platform construction is substantially completed. The remaining outstanding item is the line heater which is being manufactured locally by a contractor and is expected on site in Galveston on 17 November 2011. Final completion of the platform is therefore expected before the end of November 2011. This will be followed by load-out operations which involve the loading of the tripod, well-deck and pipeline risers onto work barges, ready for mobilisation to the designated platform location.

Β 

The operator has confirmed the delivery to the area of 1,250 feet of 6-inch pipeline which will be used to connect the main 20-inch trunk line to the designated platform location in preparation for tie-in. A hazard survey has been completed for the pipe-laying barge and the pipe-laying operation is scheduled for the first week of December. The 6-inch pipeline is designed with sufficient gas and condensate capacity to support production from future wells in addition to the I-1 well.

Β 

Once load-out is completed in Galveston, the loaded work barges will be mobilised to the designated platform location and made ready for installation. The installation programme will include lowering the tripod to the sea bed and securing it by driving pilings into the seabed, lowering the deck onto the tripod, attaching the pipeline risers and connecting the production equipment to the well-head. The programme is scheduled to take 17 days and will be completed by the tie-in of the well to the pipeline.

Β 

Weather delays, if encountered, could extend the above installation time frame to some extent but should not prevent production commencing on schedule before the end of the year. Further updates will be provided as appropriate.

Β 

Commenting on these developments, Andy Morrison, Chief Executive of Silvermere said:

Β 

"We are pleased that the development of these operations remains on schedule. Our sights are firmly set on achieving production before the end of this year. Once achieved, this will significantly de-risk Silvermere's proposition - a move into production so soon after coming to the market will help set firm foundations for future growth."

Β 

Β 

-ENDS-

Β 

Β 

For further information please contact:

Β 

Silvermere Energy PLC

Andy Morrison, Chief Executive

Β 

Β 

Β 

Β 

+44 (0)7980 878561

Β 

Merchant Securities Limited (Nominated Adviser and Broker)

Lindsay Mair/Virginia Bull

Β 

Rivington Street Corporate Finance Limited

Jon Levinson/Dru Edmonstone

Β 

Β 

+ 44(0)20 7628 2200Β 

Β 

Β 

+44 (0)20 7562 3357

Β 

Bishopgate Communications

Nick Rome/Shabnam Bashir

Β 

+44(0)20 7562 3350

Β 

Β 

About Silvermere Energy PLC

Β 

The Company acquired its interest in the Mustang Asset on 30 August 2011. This comprises a 33.33 per cent. working interest and 20.83 per cent. net entitlement interest in the Mustang Licence Area, an area within the southern half of the north west quarter and northern half of the south west quarter of the Block 818-L field as defined in State of Texas Oil and Gas Lease numbers 108873 and 108874. The Mustang Island 818-L field, located in Kleberg County waters of the Gulf of Mexico, is a field re-habilitation project targeting bypassed or only partially produced gas-condensate.

Β 

Early in 2011 the Hercules Offshore 205 jack-up rig was contracted to re-enter the I-1 Well on the Mustang Licence Area which was considered to be the most likely of the historic well sites to provide 14 optimum re-entry conditions. The I-1Well re-entry and side-tracking operation was completed in March 2011 leaving it ready to complete in sand horizons I-1 to I-6. Production and flow testing was carried out during June 2011. The well re-entry programme was led by Dominion as the operator. Gas and oil produced from the I-1Well is proposed to be connected to pipeline infrastructure and tied in via a subsea assembly, constructed for the purpose and then transported to the Six Pigs gas facility.

Β 

Silvermere's strategy is to acquire a portfolio of US oil and gas licence interests onshore and in shallow offshore waters, characterised by relatively low risk and low cost with the potential for near term production.

Β 

Silvermere is quoted onΒ the AIM Market of the London Stock Exchange plc (AIM: SLME) with its offices in London.

Β 

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCLLFFDLLLAIIL
Date   Source Headline
11th Feb 20113:53 pmRNSHolding(s) in Company
7th Feb 20114:45 pmRNSFurther Loan to Core Oil & Gas Inc.
26th Jan 20117:30 amRNSSubscription, Suspension and Board Changes
19th Jan 20112:30 pmRNSHolding(s) in Company
23rd Dec 20103:43 pmRNSResignation of Adviser - Replacement
8th Dec 201011:29 amRNSResignation of Adviser
6th Dec 201010:45 amRNSTotal Voting Rights - Correction
2nd Dec 20109:50 amRNSDirectorate Change
29th Nov 201012:34 pmRNSResult of AGM
4th Nov 20104:13 pmRNSTotal Voting Rights
4th Nov 20107:00 amRNSFinal Results
1st Nov 20107:00 amRNSIssue of Equity, Granting of Loan, Changes in Shar
1st Nov 20107:00 amRNSExpected Agreement & Fundraising
24th Mar 20109:30 amRNSSuspension - The Core Business plc
24th Mar 20107:00 amRNSRestoration - Core Business plc
25th Sep 20093:00 pmRNSSuspension - Core Business Plc (The)
5th Jul 200710:57 amRNSSch 1 -The Core Business plc
23rd Mar 200712:46 pmRNSFinal Results
12th Jan 20074:15 pmPRNInterim Results
24th Nov 20067:01 amRNSYear ended 31 May 2006
25th Oct 20067:01 amRNSTrading Update
12th Oct 20067:01 amRNSLicensing Agreement Update
11th Aug 20065:08 pmRNSMinistry of Sound option
5th Jul 200611:34 amRNSReplacement-The Core Business
5th Jul 200610:11 amRNSHolding in The Core Business
4th Jul 200610:13 amRNSHolding(s) in Company
29th Jun 20067:00 amRNSMinistry of Sound & Hed Kandi
15th Jun 20067:02 amRNSRapid progress being made
9th Mar 200610:51 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.