Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTern Regulatory News (TERN)

Share Price Information for Tern (TERN)

Share Price is delayed by 15 minutes
Get Live Data
1.20    0.00 (0.00%)
Bid:
1.10
Ask:
1.30
Spread: 0.20 (18.182%)
Market Cap: £10.27m
TERN Live PriceLast checked at - London Stock Exchange

Intraday Tern Share Chart

Operations Update

10 Nov 2011 07:00

RNS Number : 8213R
Silvermere Energy PLC
10 November 2011
 



10 November 2011

 

 

Silvermere Energy PLC

("Silvermere" or "the Company")

 

Operations Update

 

 

Silvermere Energy PLC. ("Silvermere" or the "Company"), the independent oil and gas company focusing principally on exploration, appraisal and production opportunities in the US, is pleased to confirm that preparations for production from the I-1 well on its Mustang Island asset located in Kleberg County, Texas waters in the Gulf of Mexico  are well advanced and remain in line with previous advice that production is scheduled to commence before the end of 2011.

 

The operator, Dominion Production Company LLC, has reported to the Company that platform construction is substantially completed. The remaining outstanding item is the line heater which is being manufactured locally by a contractor and is expected on site in Galveston on 17 November 2011. Final completion of the platform is therefore expected before the end of November 2011. This will be followed by load-out operations which involve the loading of the tripod, well-deck and pipeline risers onto work barges, ready for mobilisation to the designated platform location.

 

The operator has confirmed the delivery to the area of 1,250 feet of 6-inch pipeline which will be used to connect the main 20-inch trunk line to the designated platform location in preparation for tie-in. A hazard survey has been completed for the pipe-laying barge and the pipe-laying operation is scheduled for the first week of December. The 6-inch pipeline is designed with sufficient gas and condensate capacity to support production from future wells in addition to the I-1 well.

 

Once load-out is completed in Galveston, the loaded work barges will be mobilised to the designated platform location and made ready for installation. The installation programme will include lowering the tripod to the sea bed and securing it by driving pilings into the seabed, lowering the deck onto the tripod, attaching the pipeline risers and connecting the production equipment to the well-head. The programme is scheduled to take 17 days and will be completed by the tie-in of the well to the pipeline.

 

Weather delays, if encountered, could extend the above installation time frame to some extent but should not prevent production commencing on schedule before the end of the year. Further updates will be provided as appropriate.

 

Commenting on these developments, Andy Morrison, Chief Executive of Silvermere said:

 

"We are pleased that the development of these operations remains on schedule. Our sights are firmly set on achieving production before the end of this year. Once achieved, this will significantly de-risk Silvermere's proposition - a move into production so soon after coming to the market will help set firm foundations for future growth."

 

 

-ENDS-

 

 

For further information please contact:

 

Silvermere Energy PLC

Andy Morrison, Chief Executive

 

 

 

 

+44 (0)7980 878561

 

Merchant Securities Limited (Nominated Adviser and Broker)

Lindsay Mair/Virginia Bull

 

Rivington Street Corporate Finance Limited

Jon Levinson/Dru Edmonstone

 

 

+ 44(0)20 7628 2200 

 

 

+44 (0)20 7562 3357

 

Bishopgate Communications

Nick Rome/Shabnam Bashir

 

+44(0)20 7562 3350

 

 

About Silvermere Energy PLC

 

The Company acquired its interest in the Mustang Asset on 30 August 2011. This comprises a 33.33 per cent. working interest and 20.83 per cent. net entitlement interest in the Mustang Licence Area, an area within the southern half of the north west quarter and northern half of the south west quarter of the Block 818-L field as defined in State of Texas Oil and Gas Lease numbers 108873 and 108874. The Mustang Island 818-L field, located in Kleberg County waters of the Gulf of Mexico, is a field re-habilitation project targeting bypassed or only partially produced gas-condensate.

 

Early in 2011 the Hercules Offshore 205 jack-up rig was contracted to re-enter the I-1 Well on the Mustang Licence Area which was considered to be the most likely of the historic well sites to provide 14 optimum re-entry conditions. The I-1Well re-entry and side-tracking operation was completed in March 2011 leaving it ready to complete in sand horizons I-1 to I-6. Production and flow testing was carried out during June 2011. The well re-entry programme was led by Dominion as the operator. Gas and oil produced from the I-1Well is proposed to be connected to pipeline infrastructure and tied in via a subsea assembly, constructed for the purpose and then transported to the Six Pigs gas facility.

 

Silvermere's strategy is to acquire a portfolio of US oil and gas licence interests onshore and in shallow offshore waters, characterised by relatively low risk and low cost with the potential for near term production.

 

Silvermere is quoted on the AIM Market of the London Stock Exchange plc (AIM: SLME) with its offices in London.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFFDLLLAIIL
Date   Source Headline
12th Nov 20197:05 amEQSTern PLC: Portfolio and Investments Update
6th Nov 20197:01 amEQSTern PLC: Holdings in Company
31st Oct 20197:35 amEQSTern PLC: DA and Venafi Announce Code Signing Service Integration for KeyScaler
30th Oct 20197:03 amEQSTern PLC: Equity Fundraise of c. £1.75m
30th Oct 20197:00 amEQSTern PLC: FundamentalVR Series A Funding Round
25th Oct 20194:41 pmRNSSecond Price Monitoring Extn
25th Oct 20194:35 pmRNSPrice Monitoring Extension
17th Oct 20194:41 pmRNSSecond Price Monitoring Extn
17th Oct 20194:35 pmRNSPrice Monitoring Extension
2nd Oct 20197:00 amEQSTern PLC: Shareholder Conference Call
26th Sep 20197:01 amEQSTern PLC: Issue of further convertible loan to Device Authority
25th Sep 20197:01 amEQSTern PLC: Unaudited Interim Results for the six months to 30 June 2019
25th Jul 20193:25 pmEQSTern PLC: New commercial order for FundamentalVR
24th Jun 20199:01 amEQSTern PLC: New Partnership for Device Authority
24th Jun 20197:02 amEQSTern PLC: Wyld Networks is awarded Innovate UK grant and appoints new CEO
24th Jun 20197:01 amEQSTern PLC: Capital Markets Day
9th May 20197:01 amEQSTern PLC: Tern to present at Mello 2019
30th Apr 20195:00 pmEQSTern PLC: Total Voting Rights
25th Apr 20192:20 pmEQSTern PLC: Result of Annual General Meeting
23rd Apr 20199:00 amEQSTern PLC: Device Authority announces new strategic partnership and joint customer collaboration for the Internet of Medical Things ('IoMT')
15th Apr 20191:00 pmEQSTern PLC: Device Authority announces new strategic alliance
11th Apr 20197:00 amEQSTern PLC: Device Authority Update - issue of further convertible loan
4th Apr 20197:01 amEQSTern PLC: Shareholder Conference Call
3rd Apr 20199:05 amRNSSecond Price Monitoring Extn
3rd Apr 20199:00 amRNSPrice Monitoring Extension
3rd Apr 20197:01 amEQSTern PLC: Equity Fundraise of c. £1.5m
1st Apr 20197:00 amEQSTern PLC: New commercial order for InVMA
26th Mar 201910:10 amEQSTern PLC: New commercial order for FundamentalVR
19th Mar 20199:10 amEQSTern PLC: Device Authority Board Appointments
19th Mar 20197:01 amEQSTern PLC: Final results for the year ended 31 December 2018
4th Mar 20197:00 amEQSTern PLC: flexiOPS Business Update
20th Feb 20197:00 amEQSTern PLC: Update re. Convertible Loan to Device Authority Limited
31st Jan 20199:30 amEQSTern PLC: Further re. Long Term Contract Win for Device Authority
14th Jan 20197:00 amEQSTern PLC: Issue of further convertible loan to Device Authority Limited
3rd Jan 20195:16 pmEQSTern PLC: Holdings in Company
31st Dec 20187:01 amEQSTern PLC: Extension of Device Authority Convertible Note Maturity Date
27th Dec 20187:01 amEQSTern PLC: Long term contract win for Device Authority and Further re Portfolio Update
11th Dec 201812:30 pmEQSTern PLC: Device Authority Contract Win
27th Nov 201811:05 amRNSSecond Price Monitoring Extn
27th Nov 201811:00 amRNSPrice Monitoring Extension
23rd Nov 20182:34 pmEQSTern PLC: Holdings in Company
22nd Nov 20187:00 amEQSTern PLC: Portfolio Update
13th Nov 20184:29 pmEQSTern PLC: AIM Director Disclosure Update
30th Oct 20187:01 amEQSTern PLC: Additional Investment in FundamentalVR
17th Sep 20187:01 amEQSTern PLC: Unaudited Interim Results for the six months to 30 June 2018
14th Sep 20187:01 amEQSTern PLC: Issue of further loan to Device Authority Limited
31st Aug 20185:00 pmEQSTern PLC: Total Voting Rights
22nd Aug 20187:00 amEQSTern PLC: Notice of Results and Shareholder Conference Call
15th Aug 20187:00 amEQSTern PLC: Fundamental Surgery Launched in the US
13th Aug 20187:01 amEQSTern PLC: Change of adviser

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.