Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSovereign Metals Regulatory News (SVML)

Share Price Information for Sovereign Metals (SVML)

Share Price is delayed by 15 minutes
Get Live Data
32.00    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 2.00 (6.452%)
Market Cap: £209.91m
SVML Live PriceLast checked at - London Stock Exchange

Intraday Sovereign Metals Share Chart

Infill Drilling Program Complete

22 Oct 2024 07:00

RNS Number : 0511J
Sovereign Metals Limited
22 October 2024
 

NEWS RELEASE I 22 OCTOBER 2024

INFILL DRILLING PROGRAM COMPLETE

· Infill drilling program designed to upgrade Kasiya's Mineral Resource Estimate and convert Ore Reserves from Probable to Proven category now complete

· Total of 281 holes drilled over 5,607 metres using aircore drilling supported by 339 hand auger, push tube and diamond core drill holes over 1,940 metres

· Program focused on southern Kasiya, which is the area intended to supply ore feed for first eight years of production

· All drill samples will have both rutile and graphite assayed by offsite laboratories in South Africa and Australia

· Results of drilling program and Resource upgrade anticipated in early 2025

 

Sovereign Metals Limited (ASX:SVM, AIM:SVML, OTCQX:SVMLF) (Sovereign or the Company) is pleased to announce that it has completed an infill drilling program at its Kasiya Rutile-Graphite Project (Kasiya or Project) to support ongoing technical studies.

 

Aircore drilling, supported by hand auger, push tube and diamond core drilling, has now been completed in the southern part of Kasiya. The drilling was focused on the designated pits proposed to provide ore feed in the first eight years of the Project's production schedule. Ore Reserves in these areas are expected to convert from the Probable to Proven category with an upgrade of the current Mineral Resource Estimate (MRE) from Indicated to the Measured category under the JORC (2012) Code. 

 

Managing Director and CEO Frank Eagar commented: "Completing the infill drilling program on schedule will assist us in upgrading our Mineral Resource Estimate and will feed into our future technical studies as part of ongoing pre-development activities at the Kasiya Project being overseen by the Sovereign-Rio Tinto Technical Committee."

 

Offsite laboratories in South Africa and Australia will assay all samples for rutile and graphite. The drilling program's results and subsequent Resource upgrade are expected in early 2025.

 

Kasiya is already the world's largest rutile deposit and second-largest flake graphite deposit, with over 66% of the current MRE in the Indicated category.

 

Infill Drilling Program Overview

 

An offset 200x200 metre program was designed (see Figure 1), resulting in an average drill spacing of 142 metres. The offset spacing had the advantage of allowing analysis of geology and grade continuity in both orthogonal and diagonal directions.

 

The drilling program consisted of:

 

1. 281 aircore holes drilled over 5,607m, with an average depth of 20 metres

2. 309 hand auger holes drilled over 1,280m, with an average depth of 4 metres

3. 30 push tube and diamond core holes drilled over 663m, providing samples for verification twinning and geotechnical sampling with an average depth of 22 metres

 

The current MRE identifies broad and continuous high-grade rutile and graphite zones, extending over a vast area of more than 201 km². Rutile mineralisation is concentrated in laterally extensive, near-surface, flat "blanket" deposits in areas where the weathering profile remains intact and largely uneroded. Graphite is largely depleted near the surface, with grades generally improving at depths greater than 4 metres, down to the base of the saprolite zone, which averages around 22 metres.

 

Figure 1: Plan view of aircore MRE infill drilling program

Figure 2: Plan view of push tube / diamond drill MRE twin and geotechnical holes

Figure 3: Air Core site at Kasiya, with sample collection and logging

 

Figure 4: Commencement of a new hole using aircore drilling

Figure 5: Push tube / diamond core site setup at Kasiya

Figure 6: Push tube / diamond core showing stainless Shelby tubes for geotechnical samples and PVC casing for collection of push tube samples in foreground

 

Enquires

 

 

 

Frank Eagar, Managing Director & CEO

South Africa / Malawi

+27 21 065 1890

Sapan Ghai, CCO

London

+44 207 478 3900

 

Nominated Adviser on AIM and Joint Broker

 

SP Angel Corporate Finance LLP

+44 20 3470 0470

Ewan Leggat

Charlie Bouverat

 

 

Joint Brokers

 

Stifel

+44 20 7710 7600

Varun Talwar

 

Ashton Clanfield

 

 

 

Berenberg

+44 20 3207 7800

Matthew Armitt

 

Jennifer Lee

 

 

 

Buchanan

+ 44 20 7466 5000

 

Competent Person Statement

The information in this announcement that relates to the Mineral Resource Estimate is extracted from an announcement dated 5 April 2023 entitled 'Kasiya Indicated Resource Increased by over 80%' which is available to view at www.sovereignmetals.com.au and is based on, and fairly represents information compiled by Mr Richard Stockwell, a Competent Person, who is a fellow of the Australian Institute of Geoscientists (AIG). Mr Stockwell is a principal of Placer Consulting Pty Ltd, an independent consulting company. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons' findings are presented in this announcement have not been materially changed from the original announcement.

 

The information in this announcement that relates to Production Targets, Ore Reserves, Processing, Infrastructure and Capital Operating Costs, Metallurgy (rutile and graphite) is extracted from an announcement dated 28 September 2023 entitled 'Kasiya Pre-Feasibility Study Results' which is available to view at www.sovereignmetals.com.au. Sovereign confirms that: a) it is not aware of any new information or data that materially affects the information included in the original announcement; b) all material assumptions and technical parameters underpinning the Production Target, and related forecast financial information derived from the Production Target included in the original announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons' findings are presented in this presentation have not been materially modified from the Announcement.

Forward Looking Statement

This release may include forward-looking statements, which may be identified by words such as "expects", "anticipates", "believes", "projects", "plans", and similar expressions. These forward-looking statements are based on Sovereign's expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLQKBBBDBDKNKB
Date   Source Headline
26th Feb 20257:00 amRNSKasiya's Graphite Suitable for Expandable Markets
19th Feb 20257:00 amRNSKasiya's Graphite Suitable for Refractory Use
3rd Feb 20257:00 amRNS-RPresentation - Optimised PFS Outcomes
30th Jan 20257:00 amRNSDecember 2024 Quarterly Report
22nd Jan 20257:00 amRNSKasiya - Optimised PFS Results
17th Dec 20247:00 amRNSTest Pit Rehab Underway After Successful Backfill
22nd Nov 20247:00 amRNSResult of AGM
21st Nov 20247:00 amRNSResults for Use of Kasiya Graphite in Refractories
13th Nov 20247:00 amRNSMining Trials Conclude Successfully
30th Oct 20247:00 amRNSSeptember 2024 Quarterly Report
22nd Oct 20247:00 amRNSInfill Drilling Program Complete
9th Oct 20247:01 amRNSChange of Director’s Interest Notice
9th Oct 20247:00 amRNSNotice of AGM
27th Sep 20247:00 amRNSIssue of Performance Rights
26th Sep 20247:00 amRNS2024 Annual Report
24th Sep 20247:00 amRNSSovereign Presents at Minerals Security Event
18th Sep 20247:00 amRNSSpiral Plant Successfully Installed
16th Sep 20247:00 amRNSChange in Substantial Holding
13th Sep 20247:00 amRNSRio Tinto Shareholding and Issue of Shares
12th Sep 20247:00 amRNSResult of Meeting
10th Sep 20247:00 amRNSASX Price Query
4th Sep 20247:00 amRNSOutstanding Battery Anode Material Produced
28th Aug 20247:00 amRNSHydraulic Mining Trial Commences
12th Aug 20247:00 amRNSNotice of General Meeting
12th Aug 20247:00 amRNSInfill Drilling Program to Upgrade Kasiya Resource
31st Jul 20247:00 amRNSJune 2024 Quarterly Report
25th Jul 20247:00 amRNSDry Mining Trial Successfully Completed
8th Jul 20247:05 amRNSChange in Substantial Holding - Rio Tinto
8th Jul 20247:00 amRNSCommencement of Trading on OTCQX Market
3rd Jul 20247:00 amRNSRio Tinto to Invest Additional A$18.5 million
20th Jun 20247:00 amRNSMalawi Rail Upgrades Underway
12th Jun 20247:00 amRNSPilot Phase Site Construction on Schedule
3rd Jun 20247:00 amRNSASX Price Query
22nd May 20247:00 amRNSKasiya Optimisation Advances to Pilot Phase
15th May 20247:00 amRNSDownstream Testwork Shows High Quality Graphite
8th May 20247:00 amRNSTestwork Delivers Superior Quality Graphite
1st May 20247:00 amRNSIncreased Graphite Bulk Sample Capacity
30th Apr 20247:00 amRNSMarch 2024 Quarterly Report
23rd Apr 20247:00 amRNSGraphite Expert Appointed to Development Team
15th Apr 20247:00 amRNSSustainable Farming on Target to Triple Crop Yield
12th Apr 20247:00 amRNSIssue of Performance Rights
28th Mar 20247:00 amRNSChange of Director’s Interest Notice
27th Mar 20247:00 amRNSFollow-Up Drilling Initiated North of Kasiya
20th Mar 20249:57 amRNSRepresentative Bulk Sample Shipped
19th Mar 20247:00 amRNSAppointment of Stifel as Joint Broker
13th Mar 20247:00 amRNSHalf-Year Accounts
1st Mar 20247:00 amRNSCapabilities Strengthened with Key Appointments
26th Feb 20247:00 amRNSCommissioning of Sustainable Farming Initiative
15th Feb 20247:00 amRNSAppointment of Experienced ESG Officer
5th Feb 20247:00 amRNSInvestor Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.