Scancell founder says the company is ready to commercialise novel medicines to counteract cancer. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSIMEC Atlantis Energy Regulatory News (SAE)

Share Price Information for SIMEC Atlantis Energy (SAE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.10
Bid: 1.00
Ask: 1.20
Change: 0.00 (0.00%)
Spread: 0.20 (20.00%)
Open: 1.10
High: 1.10
Low: 1.10
Prev. Close: 1.10
SAE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

MeyGen Phase 1A approaches 400MWh of generation

23 Mar 2017 07:00

RNS Number : 2586A
Atlantis Resources Limited
23 March 2017
 

23 March 2017

Atlantis Resources Limited

("Atlantis" or the "Company")

MeyGen Phase 1A approaches 400MWh of generation

 

Atlantis, a global leader in the tidal power sector, confirms that having entered operation in November 2016 and been awarded full Ofgem accreditation as a 5 ROC project in February 2017, the MeyGen array continues to deliver clean, sustainable and predictable electricity to the National Grid. In the first three weeks of March, average generation has been sufficient to power the equivalent of 1,250 UK homes and individually the power performance of the turbines has exceeded the contractual output guarantees, putting the project on track to achieve capacity factors significantly in excess of 40%.

 

The three turbines from Andritz Hydro Hammerfest (AHH), which were installed between November 2016 and January 2017, are now scheduled to undergo onshore inspection to permit AHH to implement system enhancements derived from the lessons learned during the initial period of operations. The turbines will then be redeployed in the next available tidal window, further validating the rapid retrieval and installation methodology which ensures cost effective operations and maintenance for the subsea assets.

 

The AR1500 system delivered by Atlantis has an even greater focus on accessibility for maintenance, with a proprietary connection system which allows for installation or retrieval in a single short operation at the turn of the tide. Following demonstration of this system on installation in February, the AR1500 is now operating autonomously at full output, exceeding all expectations.

 

The turbine installation campaign has shown that offshore operations can successfully be carried out throughout the year, rather than being restricted to the more climatically benign summer months. This is an important finding for the project's future phases and for the drive to maximising availability and reducing cost of energy through efficient marine operations and minimised downtime. The use of jack-up vessels for the installation of the foundations in the autumn of 2016 also contributes to the cost reduction mission by confirming that these vessels can operate safely in high energy tidal environments. A jack-up vessel provides a stable platform which allows for deployment of drilled foundation systems, which are less labour and material intensive than their gravity based equivalents as used in Phase 1A.

 

David Taaffe, Project Director, said: "The initial operations phase of MeyGen Phase 1A has been a resounding success, and we hope that our achievements will now catalyse further tidal stream developments throughout Europe and worldwide to capitalise on this unique and untapped resource. Turbine production performance has been excellent, and the performance of the AR1500 turbine has been particularly impressive." 

"We are delighted with the performance of the AR1500," said Drew Blaxland, Director of Turbines and Engineering Services at Atlantis. "Our initial data analysis shows that the AR1500 is producing at least 4% more energy than the guaranteed contractual baseline, and we anticipate that this will improve further as more data is captured. This performance, coupled with our rapid and effective deployment system, puts the Atlantis system in a class of its own."

Rudolf Bauernhofer, Managing Director of AHH, said: "We have learned a great deal from the first few months of operation and have been very pleased with both the autonomous running capability of the turbines and their energy production which is well above the guaranteed value as assessment of initial data has demonstrated. We've identified some improvements based on the 250MWh of energy generated in the initial period of operations and we are working to implement these to ensure we get the best out of the turbines for years to come." 

Enquiries:

Atlantis Resources

via FTI Consulting

Tim Cornelius, Chief Executive Officer

Simon Counsell, Chief Financial Officer

 

 

 

 

 

FTI Consulting

+44 (0)20 3727 1000

Ben Brewerton

Alex Beagley

James Styles

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
NRAKLLFLDXFLBBZ
Date   Source Headline
13th Dec 20217:00 amRNSSale of Green Highlands Renewables
10th Dec 202110:43 amRNSShare Issuance
9th Dec 202112:42 pmRNSNotice of EGM Results
8th Dec 202111:05 amRNSSecond Price Monitoring Extn
8th Dec 202111:00 amRNSPrice Monitoring Extension
1st Dec 20211:50 pmRNSTotal Voting Rights
30th Nov 202111:05 amRNSSecond Price Monitoring Extn
30th Nov 202111:00 amRNSPrice Monitoring Extension
29th Nov 20214:41 pmRNSSecond Price Monitoring Extn
29th Nov 20214:36 pmRNSPrice Monitoring Extension
29th Nov 20212:01 pmRNSPrice Monitoring Extension
29th Nov 20219:56 amRNSDirectorate Change
26th Nov 20217:00 amRNSGovernment gives the green light for blue energy
24th Nov 20217:59 amRNSExtraordinary General Meeting
9th Nov 20217:00 amRNSShare Issuance
1st Nov 20217:00 amRNSTotal Voting Rights
26th Oct 20217:00 amRNSDirectorate Change
18th Oct 20212:11 pmRNSHolding(s) in Company
18th Oct 20212:09 pmRNSHolding(s) in Company
18th Oct 20211:59 pmRNSShare Issuance
18th Oct 20219:06 amRNSSecond Price Monitoring Extn
18th Oct 20219:00 amRNSPrice Monitoring Extension
13th Oct 20212:05 pmRNSSecond Price Monitoring Extn
13th Oct 20212:00 pmRNSPrice Monitoring Extension
7th Oct 202111:05 amRNSSecond Price Monitoring Extn
7th Oct 202111:00 amRNSPrice Monitoring Extension
7th Oct 20219:00 amRNSPrice Monitoring Extension
7th Oct 20217:16 amRNSDuplicate - SAE Uskmouth permit update
7th Oct 20217:00 amRNSSAE Uskmouth permit update
7th Oct 20217:00 amRNSOperational Update
6th Oct 20219:23 amRNSBlock listing Interim Review
6th Oct 20217:00 amRNSHolding(s) in Company
29th Sep 20219:06 amRNSSecond Price Monitoring Extn
29th Sep 20219:00 amRNSPrice Monitoring Extension
29th Sep 20217:00 amRNSResults of Placing
28th Sep 20215:22 pmRNSPlacing announcement
28th Sep 20215:19 pmRNSInterim Results (unaudited)
1st Sep 20217:00 amRNSTotal Voting Rights
19th Aug 20218:13 amRNSResult of AGM
18th Aug 20217:00 amRNSShare Issuance
28th Jul 20217:00 amRNSShare Issuance
23rd Jul 20212:05 pmRNSSecond Price Monitoring Extn
23rd Jul 20212:00 pmRNSPrice Monitoring Extension
23rd Jul 20219:05 amRNSSecond Price Monitoring Extn
23rd Jul 20219:00 amRNSPrice Monitoring Extension
23rd Jul 20217:00 amRNSCompany update
21st Jul 20217:00 amRNSDirectorate Change
16th Jul 20217:00 amRNSNotice of AGM
30th Jun 202111:05 amRNSSecond Price Monitoring Extn
30th Jun 202111:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.