Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRurelec Regulatory News (RUR)

  • This share is currently suspended. It was suspended at a price of 0.425

Share Price Information for Rurelec (RUR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.425
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.425
RUR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress with Arica Power Plant

9 Aug 2013 10:04

RNS Number : 3656L
Rurelec PLC
09 August 2013
 



 9th August 2013

Rurelec PLC

("Rurelec" or "the Company")

 

Rurelec Progress with Arica Power Plant

 

Rurelec PLC (AIM: RUR), the owner, operator and developer of power generation capacity internationally, today announces that it plans to convert its power project in Arica in northern Chile from diesel to either a propane based liquid petroleum gas (LPG) or liquid natural gas (LNG) as part of a commitment to maintain the Company's record in Latin America for Clean Tech energy generation. Rurelec and its wholly owned subsidiary, Independent Power Corporation PLC ("IPC"), have pioneered the use of Clean Tech power conversion as a means of obtaining United Nations recognition for carbon emission reductions (CERs). Rurelec sponsored projects today earn over 500,000 CERs a year. IPC obtained the first United Nations approval for carbon credits based on combined cycle gas turbine conversion. IPC and Rurelec are now seeking to promote the use of LPG for power generation as a means of reducing SO2 and NOx emissions from diesel fired plants as well as reducing CO2 from the increased efficiency available to CCGT power projects based on gas turbines rather than diesel engines.

 

Rurelec acquired its initial 50 per cent stake in Termoelectrica del Norte, S.A. ("Termonor"), the local Chilean project company, in 2012 at a time when the Parinacota Project in Arica was designed around diesel engines. In early 2013, Rurelec increased its holding to 100 per cent and switched the project design to be based on General Electric 6B gas turbine technology, as installed at Rurelec's Energia del Sur plant in Patagonia, Argentina. Now Rurelec is proposing to upgrade the Parinacota power plant to enable it to run on LPG immediately upon commissioning as a Clean Tech plant with a possible later switch to LNG as that fuel becomes available. A final feasibility study is now being conducted but it is expected that this will confirm the decision to switch to LPG before construction starts at the end of September of this year. Commercial operation is due in the middle of 2014.

 

Rurelec also announces that it is considering the development of an additional 10 MW of photovoltaic solar power generation in Arica to complement the Parinacota plant, which is presently designed to run only at peak hours in order to maintain system reliability in the far north of Chile where grid access is weak. Eventually, when the plant is running on LPG or mini LNG, a conversion to CCGT operation is expected, much as Rurelec successfully converted Energia del Sur to CCGT in 2009. This solar capacity may in due course be increased to 40 MW subject to the availability of suitable project finance.

 

Rurelec is continuing to progress its application to the Foreign Securities Registry of the Chilean Securities and Insurance Supervisor ("SVS") for its shares to be admitted to a Santiago Stock Exchange listing. This listing is expected to provide future access to the attractive Chilean corporate debt market for long term fixed rate bonds as Rurelec rolls out its programme of new thermal power plants at Arica and Mejillones in the north of Chile.

 

Commenting on the new approach to the project, Peter Earl, CEO of Rurelec said: "We have always been Britain's premier Clean Tech power generator in Latin America. By pioneering the use on LPG in northern Chile, we expect to create a showcase for clean power which will serve us well as our IPC subsidiary competes to install environmentally acceptable thermal capacity in Europe and Central Asia as well as in Chile and Peru."

 

 

- Ends -

 

 

For further information please contact:

 

Peter Earl, CEO, Rurelec PLC

 

Ana Ribeiro, Head of Communications

Tel: 020 7793 5610

Paul Shackleton, Daniel Stewart & Company Plc

Tel: 020 7776 6550

Guy Peters, XCAP Securities

Tel: 020 7101 7070

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCNKCDPFBKKQFK
Date   Source Headline
25th Jun 20087:00 amRNSFurther re Acquisition
25th Jun 20087:00 amRNSNotice of AGM/Dividend Timeta
13th Jun 20081:20 pmRNSAcquisition
27th May 20081:02 pmRNSHolding(s) in Company
22nd May 200812:15 pmRNSHolding(s) in Company
22nd May 20088:09 amRNSPreliminary Results Year End
16th May 20087:00 amRNSContract Win
4th Apr 20087:01 amRNSTrading Update
13th Mar 200811:25 amRNSHolding(s) in Company
3rd Dec 200712:00 pmRNSHolding(s) in Company
22nd Nov 20079:09 amRNSTrading Update
23rd Oct 20074:52 pmRNSHolding(s) in Company
18th Oct 20072:19 pmRNSHolding(s) in Company
8th Oct 20072:38 pmRNSHolding(s) in Company
27th Sep 20077:02 amRNSInterim Results
14th Aug 20071:21 pmRNSAIM Rule 26
30th Jul 20075:40 pmRNSDirector/PDMR Shareholding
30th Jul 20075:36 pmRNSDirector/PDMR Shareholding
24th Jul 20075:05 pmRNSLoan Repayment
3rd Jul 20073:53 pmRNSHolding(s) in Company
22nd Jun 20073:28 pmRNSResult of AGM
24th May 20071:37 pmRNSHolding(s) in Company
21st May 20078:30 amRNSHolding(s) in Company
21st May 20078:27 amRNSHolding(s) in Company
15th May 200711:53 amRNSPlacing of Shares
9th May 20074:44 pmRNSDividend & AGM
9th May 20077:01 amRNSAnnual Report and Accounts
26th Mar 20075:01 pmRNSTrading Update-Amendment
26th Mar 20074:12 pmRNSTrading Update
20th Mar 20074:02 pmRNSHolding(s) in Company
20th Mar 20074:01 pmRNSHolding(s) in Company
20th Mar 20077:47 amRNSHolding(s) in Company
9th Mar 20077:01 amRNSLoan Agreement
6th Mar 20075:08 pmRNSDirectorate Change
6th Mar 20074:28 pmRNSNew Power Capacity Gain
18th Dec 20061:11 pmRNSHolding(s) in Company
18th Dec 20061:08 pmRNSHolding(s) in Company
14th Dec 20062:24 pmRNSTotal Voting Rights
11th Dec 20064:21 pmRNSDirector/PDMR Shareholding
3rd Nov 20065:44 pmRNSNotifiable Interest
28th Sep 20067:02 amRNSInterim Results
5th Sep 20063:58 pmRNSHolding(s) in Company
29th Aug 20065:07 pmRNSArgentina Update -Replacement
29th Aug 20065:07 pmRNSBolivia Update-Replacement
29th Aug 20064:21 pmRNSHolding(s) in Company
29th Aug 20069:30 amRNSBolivia Update
29th Aug 20069:30 amRNSArgentina Update
22nd May 20067:01 amRNSFinal Results
11th Apr 20067:00 amRNSReceipt of Dividend
17th Mar 20064:27 pmRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.