The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRurelec Regulatory News (RUR)

  • This share is currently suspended. It was suspended at a price of 0.425

Share Price Information for Rurelec (RUR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.425
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.425
RUR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Progress with Arica Power Plant

9 Aug 2013 10:04

RNS Number : 3656L
Rurelec PLC
09 August 2013
 



 9th August 2013

Rurelec PLC

("Rurelec" or "the Company")

 

Rurelec Progress with Arica Power Plant

 

Rurelec PLC (AIM: RUR), the owner, operator and developer of power generation capacity internationally, today announces that it plans to convert its power project in Arica in northern Chile from diesel to either a propane based liquid petroleum gas (LPG) or liquid natural gas (LNG) as part of a commitment to maintain the Company's record in Latin America for Clean Tech energy generation. Rurelec and its wholly owned subsidiary, Independent Power Corporation PLC ("IPC"), have pioneered the use of Clean Tech power conversion as a means of obtaining United Nations recognition for carbon emission reductions (CERs). Rurelec sponsored projects today earn over 500,000 CERs a year. IPC obtained the first United Nations approval for carbon credits based on combined cycle gas turbine conversion. IPC and Rurelec are now seeking to promote the use of LPG for power generation as a means of reducing SO2 and NOx emissions from diesel fired plants as well as reducing CO2 from the increased efficiency available to CCGT power projects based on gas turbines rather than diesel engines.

 

Rurelec acquired its initial 50 per cent stake in Termoelectrica del Norte, S.A. ("Termonor"), the local Chilean project company, in 2012 at a time when the Parinacota Project in Arica was designed around diesel engines. In early 2013, Rurelec increased its holding to 100 per cent and switched the project design to be based on General Electric 6B gas turbine technology, as installed at Rurelec's Energia del Sur plant in Patagonia, Argentina. Now Rurelec is proposing to upgrade the Parinacota power plant to enable it to run on LPG immediately upon commissioning as a Clean Tech plant with a possible later switch to LNG as that fuel becomes available. A final feasibility study is now being conducted but it is expected that this will confirm the decision to switch to LPG before construction starts at the end of September of this year. Commercial operation is due in the middle of 2014.

 

Rurelec also announces that it is considering the development of an additional 10 MW of photovoltaic solar power generation in Arica to complement the Parinacota plant, which is presently designed to run only at peak hours in order to maintain system reliability in the far north of Chile where grid access is weak. Eventually, when the plant is running on LPG or mini LNG, a conversion to CCGT operation is expected, much as Rurelec successfully converted Energia del Sur to CCGT in 2009. This solar capacity may in due course be increased to 40 MW subject to the availability of suitable project finance.

 

Rurelec is continuing to progress its application to the Foreign Securities Registry of the Chilean Securities and Insurance Supervisor ("SVS") for its shares to be admitted to a Santiago Stock Exchange listing. This listing is expected to provide future access to the attractive Chilean corporate debt market for long term fixed rate bonds as Rurelec rolls out its programme of new thermal power plants at Arica and Mejillones in the north of Chile.

 

Commenting on the new approach to the project, Peter Earl, CEO of Rurelec said: "We have always been Britain's premier Clean Tech power generator in Latin America. By pioneering the use on LPG in northern Chile, we expect to create a showcase for clean power which will serve us well as our IPC subsidiary competes to install environmentally acceptable thermal capacity in Europe and Central Asia as well as in Chile and Peru."

 

 

- Ends -

 

 

For further information please contact:

 

Peter Earl, CEO, Rurelec PLC

 

Ana Ribeiro, Head of Communications

Tel: 020 7793 5610

Paul Shackleton, Daniel Stewart & Company Plc

Tel: 020 7776 6550

Guy Peters, XCAP Securities

Tel: 020 7101 7070

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCNKCDPFBKKQFK
Date   Source Headline
20th Oct 20178:50 amRNSForm 8.5 (EPT/NON-RI)
19th Oct 20174:53 pmRNSForm 8.3 - Rurelec
19th Oct 20174:39 pmRNSForm 8 (OPD) (Rurelec PLC)
19th Oct 201712:27 pmRNSUpdate regarding Energia de Sur
17th Oct 20171:53 pmRNSForm 8.5 (EPT/NON-RI)
13th Oct 201710:16 amRNSForm 8.5 (EPT/NON-RI)
12th Oct 201711:44 amRNSForm 8.5 (EPT/NON-RI)
11th Oct 20175:34 pmRNSRule 2.9 Announcement
11th Oct 20171:16 pmRNSStatement re Possible Offer
29th Sep 20177:00 amRNSInterim Results
18th Sep 201710:18 amRNSUpdate Regarding Energia del Sur, S.A.
8th Sep 20174:18 pmRNSUpdate - Energia del Sur, S.A.
20th Jul 20173:55 pmRNSChanges to the Company Secretary
20th Jul 20173:53 pmRNSResult of AGM
28th Jun 20174:13 pmRNSAudited Results for Year Ended 31 December 2016
8th Jun 201711:51 amRNSExtension of Short Term Loan Facilities
26th May 20178:34 amRNSUpdate Regarding Energia del Sur, S.A. ("EdS")
27th Apr 20177:00 amRNSUpdate regarding Energia del Sur S.A.
12th Apr 20172:06 pmRNSUpdate regarding Energia del Sur S.A.
10th Feb 20173:45 pmRNSUpdate on Trading / Agreement with Ethosenergy
31st Jan 20177:00 amRNSWithdrawal of Statutory Demands
19th Jan 20177:00 amRNSReceipt of Statutory Demands
16th Nov 20164:19 pmRNSAppointment of New Director
28th Oct 20164:27 pmRNSExtension of New Short Term Loan Facility
30th Sep 20167:00 amRNSInterim Results
10th Aug 201611:13 amRNSResult of AGM
1st Aug 201611:57 amRNSNew Short Term Loan Facility
18th Jul 20167:30 amRNSRestoration - Rurelec Plc
15th Jul 20165:35 pmRNSNotice of AGM
15th Jul 20165:30 pmRNSFinal Results and Lifting of Suspension
28th Jun 20161:30 pmRNSSuspension - Rurelec Plc
28th Jun 20161:30 pmRNSTemporary Suspension of Trading
22nd Jun 20165:34 pmRNSExtension of Short Term Loan Facility
13th Apr 20164:55 pmRNSShort Term Loan Facility and Trading Update
18th Feb 20167:00 amRNSNew Short Term Loan Facility
5th Feb 20162:16 pmRNSChange of Registered Office
23rd Dec 201512:11 pmRNSExtension of Short Term Loan Facility
14th Dec 201511:32 amRNSDirectorate Change
30th Nov 201512:55 pmRNSResult of General Meeting
24th Nov 20152:35 pmRNSChange of Registered Office
13th Nov 20157:00 amRNSProposed Open Offer
6th Nov 20154:04 pmRNSShort Term Loan Facility
30th Oct 20153:38 pmRNSShort Term Loan Facility
20th Oct 20157:00 amRNSNotification re Sterling Trust Limited
13th Oct 20158:59 amRNSDirectorate Change
13th Oct 20157:00 amRNSDirectorate Change
7th Oct 20159:22 amRNSUpdate re Appointment of Directors
30th Sep 20157:00 amRNSInterim Results
26th Aug 20154:57 pmRNSChange of Registered Office
17th Aug 20154:37 pmRNSRepayment of Loan Facility

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.