Update - Colombia - Replacement

19 Dec 2011 09:36

RNS Number : 2248U
Red Rock Resources plc
19 December 2011
Β 

ο»Ώ

The announcement contains amended hyperlinksRED ROCK RESOURCES PLC

Β 

Update - mine planning

Β 

Dated: 19 December 2011

Β 

Red Rock Resources plc ("Red Rock" or the "Company"), a mining and exploration company with a producing gold mine in Colombia; Kenyan gold and Greenland iron ore exploration projects; and interests in steel feed, uranium and rare earths, reports on short and medium term mine planning at the El Limon mine in Antioquia, Colombia.

El Limon Mine Plan

Short-term Mine Planning

Recent level mapping and sampling has been used to generate a working estimate of the amount of potentially mineable material at the EL Limon Mine. This material is in two areas, that defined between Levels 6 and 7, which is fully developed and is the main source of current production; and, a new development area south of the main production shaft on Level 6 South (see Figs 1 to 3).

Figure 1

http://www.rns-pdf.londonstockexchange.com/rns/2248U_1-2011-12-19.pdf

Figure 2

http://www.rns-pdf.londonstockexchange.com/rns/2248U_2-2011-12-19.pdf

Figure 3

http://www.rns-pdf.londonstockexchange.com/rns/2248U_3-2011-12-19.pdf

The Company's in-house estimates have been completed without independent verification and without the use of modern tonnage estimating methodologies. Rather, tonnage estimates have been completed by defining simple geometric volumes based on surveyed areas and projected dips of the ore zone, using mining parameters of a minimum 40cm mining dilution on each side of the vein, up to a mining width of 1.2m, and an estimated density of 2.76 tcm. The Level 6-7 mine block extends over a strike length of some 200m, has a height of nearly 50m and an average horizontal projection of between 35-60m. The Level 6 South block is projected to be 40-50m long, with a similar profile to that of the Level 6-7 block.

Estimates indicate that these blocks potentially contain some 29,000 to 35,000 tonnes of in situ mineralised material remaining as of the end of November 2011 (Table 1 below). Current production from these areas is running at a mining-diluted production grade in the range of 9-10g/t Au, and the objective will be to maintain the production grade at this level or higher.

Support for the projected production grade comes from current production grades from these areas, combined with systematic sampling and vein measurements completed at 2-5m intervals along the development drives.

However, there is as yet limited understanding of gold grade variation within the vein. Pods of high grade mineralisation of up to ~150g/t Au have been found within the Level 6-7 panels, but their orientation and continuity is not yet completely understood, and the vein grades in these areas have been cut to 40g/t in internal production forecasts.

It should be noted that this calculation process is not JORC-compliant, so it is not possible to assign the usual confidence categories to the estimates, or to state them as resources. Therefore although access has been established into most panels which has confirmed the continuity of mineralisation, there can be no assurance that the predicted production can be realised. The estimates described herein have been prepared by the recently appointed mine management team for the purpose of developing a production schedule to form the basis of a comprehensive mine plan which the Company hopes will provide profitable production over the next six months.

During this six-month period, the management team will work to extend the expected operational life of El Limon by defining new ore blocks through development and in-mine exploration. The mine team will also present detailed plans for operating costs, maintenance, and capital expenditure requirements.

Medium-Term Mine Planning

The new mine team is optimistic that the exploration and development planned over the next six months will define ore extensions to allow as much as a further 18 months of operations before production is required from below the already established Level 7.

Once the character of the newly-defined ore is established the next phase of mine planning will commence to optimise extraction from these areas by considering new mining techniques and determining the right degree of mechanisation.

Enquiries:

Andrew Bell

020 7402 4580 or

07766 474849Β 

Β 

Red Rock Resources plc

Chairman

Β 

Sandra Spencer

020 7402 4580 or

07757 660 798Β 

Β 

Red Rock Resources plc

Public and Investor Relations

Peter Trevelyan-Clark/ Ben Jeynes

Β 

020 7444 0800

Religare Capital Markets

Nominated Adviser

Nick Emerson

01483 413500

Simple Investments Ltd

Broker

Β Updates on the Company's activities are regularly posted on its website, www.rrrplc.com.

Β Β 

Table 1:

Estimated tonnage contained within each block at the EL Limon Mine, Colombia, net of production to date, referenced in Figures 2 & 3Β 

γ€€

Block Number
Estimated Tonnage
1
248
2
1,460
3
375
4
1,268
5
2,204
6
3,851
7
2,090
8
207
9
906
10
397
11
1,686
12
336
13
1,809
14
152
15
1,094
16
317
17
1,385
18
161
19
1,241
20
154
21
646
22
994
23
2,830
24
1,641
25
2,108
26
2,659
Raw Total
32,219
Confidence
+/- 10%
Estimate
29-35kt

Β 

Β 

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCEANANFANFFEF
Date   Source Headline
3rd Apr 20237:00 amRNSHalf-year Report
31st Mar 20234:27 pmRNSTotal Voting Rights
28th Mar 20237:00 amRNSEIA submitted for Zimbabwe lithium mining project
15th Mar 20232:36 pmRNSIssue of Equity
15th Mar 202312:15 pmRNSVictoria Goldfields, Australia - drilling update
8th Mar 20237:00 amRNSAsset Review and Current Developments
24th Feb 202310:05 amRNSIssue of Equity
16th Feb 202310:00 amRNSVictoria Goldfields - Beringa Update
10th Feb 20235:26 pmRNSResult of AGM
6th Feb 202311:00 amRNSPrice Monitoring Extension
11th Jan 20234:50 pmRNSNotice of AGM
9th Jan 202311:00 amRNSVictoria Goldfields Australia - Update
6th Jan 20237:00 amRNSBurkino Faso Exploration Update - Bilbale Project
29th Dec 202212:14 pmRNSFinal Results
19th Dec 202212:39 pmRNSDevelopment of Lithium Assets
16th Dec 202211:05 amRNSSecond Price Monitoring Extn
16th Dec 202211:00 amRNSPrice Monitoring Extension
15th Dec 20227:00 amRNSFund Raising
13th Dec 20227:00 amRNSDrilling begins at Historic Berringa Gold Mine
8th Dec 20222:16 pmRNSResult of Meeting
23rd Nov 20222:50 pmRNSNotice of GM
22nd Sep 20222:30 pmRNSAcquisition of Berringa Gold Mine Complete
21st Sep 20226:21 pmRNSPlacing, Appointment of Joint Broker and TVR
5th Sep 20227:00 amRNSUpdate on drilling at Bilbale
19th Aug 202210:41 amRNSSecond Tranche of CLNs and Warrants
15th Aug 20224:12 pmRNSResult of Meeting
10th Aug 202211:10 amRNSDirector/PDMR Shareholding
8th Aug 202210:17 amRNSDirector/PDMR Shareholding
5th Aug 20227:00 amRNSAsset Review and Current Developments
1st Aug 20222:00 pmRNSAssessment of Ajax Mine Potential
28th Jul 20227:00 amRNSNotice of GM
25th Jul 20227:00 amRNSIssue of convertible notes and warrants
6th Jul 20222:00 pmRNSVictoria Gold JV - Berringa Mine Acquisition
4th Jul 202212:48 pmRNSTotal Voting Rights
27th Jun 20223:30 pmRNSKimono Cobalt Project, DRC
13th Jun 20222:30 pmRNSDrill Results from Mt Bute, Victoria, Australia
8th Jun 20225:52 pmRNSIssue of Equity and Total Voting Rights
24th May 20227:00 amRNSVictoria Gold JV - Key Licence granted
6th May 20224:03 pmRNSIssue of Equity, Director/PDMR Holdings, TVR
6th May 20221:33 pmRNSLithium Update
29th Apr 20227:00 amRNSHalf-year Report
12th Apr 20222:00 pmRNSUpdate on Gold Exploration in Victoria
7th Apr 20224:41 pmRNSSecond Price Monitoring Extn
7th Apr 20224:36 pmRNSPrice Monitoring Extension
31st Mar 202211:31 amRNSResult of AGM
31st Mar 202210:27 amRNSLithium Subsidiary Established, Assets Acquired
24th Mar 20227:00 amRNSAsset Review and Interims Update
22nd Mar 20227:00 amRNSMikei Gold Project - Drill Programme Assay Results
14th Mar 20226:22 pmRNSDirector/PDMR Shareholding
7th Mar 20224:05 pmRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.