Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.0255    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.003 (12.50%)
Market Cap: £2.44m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Update - Colombia - Replacement

19 Dec 2011 09:36

RNS Number : 2248U
Red Rock Resources plc
19 December 2011
 



The announcement contains amended hyperlinksRED ROCK RESOURCES PLC

 

Update - mine planning

 

Dated: 19 December 2011

 

Red Rock Resources plc ("Red Rock" or the "Company"), a mining and exploration company with a producing gold mine in Colombia; Kenyan gold and Greenland iron ore exploration projects; and interests in steel feed, uranium and rare earths, reports on short and medium term mine planning at the El Limon mine in Antioquia, Colombia.

El Limon Mine Plan

Short-term Mine Planning

Recent level mapping and sampling has been used to generate a working estimate of the amount of potentially mineable material at the EL Limon Mine. This material is in two areas, that defined between Levels 6 and 7, which is fully developed and is the main source of current production; and, a new development area south of the main production shaft on Level 6 South (see Figs 1 to 3).

Figure 1

http://www.rns-pdf.londonstockexchange.com/rns/2248U_1-2011-12-19.pdf

Figure 2

http://www.rns-pdf.londonstockexchange.com/rns/2248U_2-2011-12-19.pdf

Figure 3

http://www.rns-pdf.londonstockexchange.com/rns/2248U_3-2011-12-19.pdf

The Company's in-house estimates have been completed without independent verification and without the use of modern tonnage estimating methodologies. Rather, tonnage estimates have been completed by defining simple geometric volumes based on surveyed areas and projected dips of the ore zone, using mining parameters of a minimum 40cm mining dilution on each side of the vein, up to a mining width of 1.2m, and an estimated density of 2.76 tcm. The Level 6-7 mine block extends over a strike length of some 200m, has a height of nearly 50m and an average horizontal projection of between 35-60m. The Level 6 South block is projected to be 40-50m long, with a similar profile to that of the Level 6-7 block.

Estimates indicate that these blocks potentially contain some 29,000 to 35,000 tonnes of in situ mineralised material remaining as of the end of November 2011 (Table 1 below). Current production from these areas is running at a mining-diluted production grade in the range of 9-10g/t Au, and the objective will be to maintain the production grade at this level or higher.

Support for the projected production grade comes from current production grades from these areas, combined with systematic sampling and vein measurements completed at 2-5m intervals along the development drives.

However, there is as yet limited understanding of gold grade variation within the vein. Pods of high grade mineralisation of up to ~150g/t Au have been found within the Level 6-7 panels, but their orientation and continuity is not yet completely understood, and the vein grades in these areas have been cut to 40g/t in internal production forecasts.

It should be noted that this calculation process is not JORC-compliant, so it is not possible to assign the usual confidence categories to the estimates, or to state them as resources. Therefore although access has been established into most panels which has confirmed the continuity of mineralisation, there can be no assurance that the predicted production can be realised. The estimates described herein have been prepared by the recently appointed mine management team for the purpose of developing a production schedule to form the basis of a comprehensive mine plan which the Company hopes will provide profitable production over the next six months.

During this six-month period, the management team will work to extend the expected operational life of El Limon by defining new ore blocks through development and in-mine exploration. The mine team will also present detailed plans for operating costs, maintenance, and capital expenditure requirements.

Medium-Term Mine Planning

The new mine team is optimistic that the exploration and development planned over the next six months will define ore extensions to allow as much as a further 18 months of operations before production is required from below the already established Level 7.

Once the character of the newly-defined ore is established the next phase of mine planning will commence to optimise extraction from these areas by considering new mining techniques and determining the right degree of mechanisation.

Enquiries:

Andrew Bell

020 7402 4580 or

07766 474849 

 

Red Rock Resources plc

Chairman

 

Sandra Spencer

020 7402 4580 or

07757 660 798 

 

Red Rock Resources plc

Public and Investor Relations

Peter Trevelyan-Clark/ Ben Jeynes

 

020 7444 0800

Religare Capital Markets

Nominated Adviser

Nick Emerson

01483 413500

Simple Investments Ltd

Broker

 Updates on the Company's activities are regularly posted on its website, www.rrrplc.com.

  

Table 1:

Estimated tonnage contained within each block at the EL Limon Mine, Colombia, net of production to date, referenced in Figures 2 & 3 

 

Block Number
Estimated Tonnage
1
248
2
1,460
3
375
4
1,268
5
2,204
6
3,851
7
2,090
8
207
9
906
10
397
11
1,686
12
336
13
1,809
14
152
15
1,094
16
317
17
1,385
18
161
19
1,241
20
154
21
646
22
994
23
2,830
24
1,641
25
2,108
26
2,659
Raw Total
32,219
Confidence
+/- 10%
Estimate
29-35kt

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEANANFANFFEF
Date   Source Headline
15th Feb 20224:41 pmRNSSecond Price Monitoring Extn
15th Feb 20224:36 pmRNSPrice Monitoring Extension
15th Feb 20222:06 pmRNSSecond Price Monitoring Extn
15th Feb 20222:01 pmRNSPrice Monitoring Extension
15th Feb 202212:52 pmRNSCopper and Cobalt Drilling in DRC
4th Feb 20227:00 amRNSAsset Review and Current Developments
28th Jan 20227:00 amRNSIssue of Equity, Exercise of Options, TVR
25th Jan 20227:00 amRNSOption Exercise, Directors' Dealings and TVR
19th Jan 20227:00 amRNSJudgement for Damages Obtained in DRC
7th Jan 20227:00 amRNSKenya Exploration Update
6th Jan 202211:26 amRNSLicences obtained at Bilbale and Boulon
6th Jan 20227:00 amRNSDRC Update
29th Dec 202112:21 pmRNSFinal Results
15th Dec 20217:00 amRNSDrilling starts in Victoria, Grant of New Licence
8th Dec 20217:00 amRNSKenya Exploration Update
7th Dec 202111:00 amRNSUpdate on Australian Joint Venture Subsidiary
16th Nov 20217:00 amRNSSummary of Gold Exposure
16th Nov 20217:00 amRNSDRC Projects Update
28th Oct 20219:54 amRNSHolding(s) in Company
28th Oct 20219:00 amRNSPrice Monitoring Extension
18th Oct 20219:44 amRNSLicence applications by Cote d'Ivoire subsidiary
11th Oct 20217:00 amRNSDRC Project - interim update
29th Sep 20217:00 amRNSInvestments Update
21st Sep 20214:11 pmRNSUpdate on Power Metal Resources and Australian JV
16th Sep 20213:40 pmRNSRRAL - historic mine workings, Victoria, Australia
16th Sep 202112:11 pmRNSPrice Monitoring Extension
16th Sep 202112:10 pmRNSSecond Price Monitoring Extn
16th Sep 20217:00 amRNSKenya Exploration Update
15th Sep 20214:41 pmRNSSecond Price Monitoring Extn
15th Sep 20214:36 pmRNSPrice Monitoring Extension
10th Sep 20211:45 pmRNSCompany Broker
27th Aug 20219:26 amRNSHolding(s) in Company
13th Aug 202111:05 amRNSSecond Price Monitoring Extn
13th Aug 202111:00 amRNSPrice Monitoring Extension
12th Aug 202110:52 amRNSDirector/PDMR Shareholding
10th Aug 20216:23 pmRNSKenya Exploration Update
9th Aug 202110:55 amRNSDRC Copper-Cobalt project - drilling update
9th Aug 20217:00 amRNSAustralian Gold Joint Venture update
26th Jul 20217:00 amRNSDirectorate Change
30th Jun 20215:47 pmRNSTotal Voting Rights
30th Jun 20219:34 amRNSDrilling contract awarded at Mikei Gold Project
29th Jun 20217:00 amRNSDrill Programme at DRC Copper-Cobalt Project
22nd Jun 20212:40 pmRNSHolding(s) in Company
10th Jun 20214:19 pmRNSHolding(s) in Company
4th Jun 20217:00 amRNSExercise of Warrants and Total Voting Rights
25th May 20217:00 amRNSDrill Programme to start at DRC Prospect
14th May 202111:55 amRNSInvestee update - Juno Minerals
10th May 20217:00 amRNSInvestee Entity Update - Elephant Oil Limited
30th Apr 20215:38 pmRNSTotal Voting Rights
29th Apr 20213:00 pmRNSUpdate: Australia

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.