Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.0255    0.0035 (15.91%)
Bid:
0.024
Ask:
0.027
Spread: 0.003 (12.50%)
Market Cap: £2.44m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Kenya Exploration Update

7 Jan 2022 07:00

RNS Number : 7076X
Red Rock Resources plc
07 January 2022
 

Red Rock Resources PLC

("Red Rock" or the "Company")

Kenya Exploration Update

Mikei Gold Project - Drill Programme Assay Results

 

7 January 2022

Red Rock Resources Plc ("Red Rock" or "the Company"), the natural resource development company with interests in gold and base metals, announces the results of the first batch of 950 samples from its recently completed 2021 phase 1 RC drilling exploration programme in the mid KKM prospect at the Mikei Gold Project ("MGP") in Kenya.

HIGHLIGHTS:

· A total of 20 drill holes totalling 2093 meters were completed as part of phase 1 RC Drilling Programme

 

· Sampling and logging was done at 1m intervals by our in-house geological team prior to being sent to SGS limited in Mwanza, Tanzania for accredited laboratory assay

 

· Results are of first batch of 950 samples from 9 out of the 20 drill holes. Final batch of Phase 1 drilling samples awaiting customs clearance.

 

· Highlight intercepts include (complete collar and assay tables available at the bottom of this release).

 

o KKRC102: 17m @ 1.02 g/t Au from 116m to 133m (including 1m @ 3.15 g/t Au)

o KKRC082: 6 m @ 1.17 g/t Au from 8m to 13m (including 1m @ 3.75 g/t Au)

o KKRC101: 4m @ 1.37 g/t Au from 83m to 87m (including 1m @ 2.7 g/t Au)

 

Red Rock Chairman Andrew Bell comments: "The drill programme was designed to test possible extensions of the mineralised zones and to infill some possible gaps where holes might previously have been drilled too far apart to allow an assumption of continuity of mineralisation in the Resource calculation.

A more powerful compressor had to be brought in part way through the programme, and the first nine holes for which we have results were those drilled while waiting for it to arrive. A comprehensive picture of the results of the programme awaits the results of the final eleven holes, including some deeper holes.

However these first nine holes were extremely encouraging, and take us some way towards our objectives for the programme. Seven of the drillholes intercepted gold mineralisation, including five at good grades.

We look forward to being able to announce the remaining results before long."

 

Programme Data:

Drill Programme assay table

Hole ID

From (m)

To (m)

Interval (m)

Au g/t

KKRC082

7

13

6

1.17

Incl.

12

13

1

3.75

KKRC083

98

101

3

0.5

KKRC084

No Significant intercepts

KKRC085

73

74

1

1.87

KKRC098

65

68

3

0.5

KKRC099

64

66

2

0.88

incl.

65

66

1

1.4

KKRC100

No Significant intercepts

KKRC101

83

87

4

1.37

incl.

84

85

1

2.71

 

107

109

2

0.9

KKRC102

116

133

17

1.02

incl.

124

125

1

3.17

*All thicknesses are downhole lengths and true thickness are not known at this stage

Drill Programme collar table

Hole ID

Azimuth

Dip

Hole Depth (m)

Easting

Northing

Elevation

KKRC082

250

-600

100

643862

9889435

1191

KKRC084

250

-600

110

643967

9889409

1201

KKRC085

250

-600

85

643997

9889422

1203

KKRC101

250

-600

109

645382

9888747

1264

KKRC102

250

-600

133

645283

9888773

1261

KKRC083

250

-600

109

643897

9889444

1191

KKRC098

250

-600

85

644912

9889999

1258

KKRC099

250

-600

70

644955

9889041

1250

KKRC100

250

-600

60

644919

9889034

1249

*Projection: UTM Zone 36 South Arc 1960

QA/QC

Sampling was done at intervals of 1 metre, and the majority of samples were dry with good to excellent recoveries. The company included certified reference materials (CRM) in the sample stream and constitutes approximately 5-10% of the sample stream. Samples from this drilling programme were submitted to SGS Limited in Mwanza, Tanzania which is an ISO certified and accredited laboratory for sample preparation and analysis. In addition to the company's CRMs, the laboratory has additional checks.

Background

The MGP (100% beneficially owned by Red Rock) comprises two prospecting licences which cover approximately 245 km2, namely PL/2018/0202 and PL/2018/0203, over the Migori Greenstone Belt, and are located along the northern margin of the Tanzanian Craton. The licences extend 63 km along the strike of the belt, which also hosts the Kilimapesa Gold treatment plant several km to the east of the Company's licenses. The North Mara Gold Mine, which is operated by Barrick Gold, is located 30 km to the south of the MGP in Tanzania.

Regional exploration in the project area began in the early 1930s and culminated in the identification and subsequent mining of the Macalder volcanogenic massive sulphide (VMS) base metal mine.

In 2010, Red Rock began the extensive task of file organisation, data digitisation and compilation of available historical data, following which CSA Global (UK) Ltd performed cross-checks and validation steps prior to loading it into a Structured Query Language (SQL) database using Datashed. During 2011 and 2012, Red Rock undertook an infill drilling programme at all five of the lode gold prospects; MK, Kakula-Kalange-Munyu (KKM), Kakula-Kalange-Munyu West (KW), Nyanza (NZ), and Gori Maria (GM) within PL/2018/0202.The Report published earlier this year documented the results of Mineral Resource estimation work initially conducted in 2011 and 2012 and revised in 2021 in order to report the Mineral Resources according to JORC (2012) guidelines.

JORC (2012) differs from earlier editions of the JORC Code in that for a Mineral Resource to be estimated it requires the application of "reasonable prospects of eventual economic extraction" ("RPEEE") principles. This has resulted in the case of the Mikei MRE in the calculation of pit shells supported by conceptual cost and gold price forecast parameters. Any material outside or below the reporting pit shell was updated as "Not Classified" since it did not meet the criteria to be reported as a Mineral Resource. 

The total Mineral Resource Estimate, at both Inferred and Indicated levels, was estimated at:

15.13 Mt @ 1.49 g/t Au with contained metal content of 723 KOz Au

All prospects, except GM, were classified as Indicated and Inferred Mineral Resources. GM was classified as Inferred only, mainly due to the relatively low average RC drill recovery of 62%.

Due to the uncertain lateral extent and depth of artisanal mining at the Mikei prospects, and the lack of topographic data to accurately deplete the Mineral Resource, all oxidised material was classified as Inferred Mineral Resources.

The Mineral Resource was reported as that material within the RPEEE pit shells, and above a cut-off grade of 0.5 g/t Au. The Mineral Resource was reported as of 18 January 2021.

 

The technical information in this release has been reviewed by Mr Joseph Komu, a member of AusIMM and the Project Manager of the Project. He is a member of a recognised professional organisation and has sufficient relevant experience to qualify as a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies published by AIM.

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

For further information, please contact:

Andrew Bell 0207 747 9990 Chairman Red Rock Resources Plc

Roland Cornish/ Rosalind Hill Abrahams 0207 628 3396 NOMAD Beaumont Cornish Limited

Jason Robertson 020 7374 2212 Broker First Equity Limited

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLBKABDCBKDCDK
Date   Source Headline
2nd Jun 20266:14 pmRNSHolding(s) in Company
1st Jun 20265:15 pmRNSHolding(s) in Company
1st Jun 20263:56 pmRNSJoint Venture Provisional Award
28th May 20264:05 pmRNSIssue of Equity
8th May 20261:58 pmRNSHolding(s) in Company
7th May 202612:33 pmRNSHolding(s) in Company
5th May 20263:26 pmRNSHolding(s) in Company
30th Apr 202610:31 amRNSIssue of Equity
28th Apr 202611:35 amRNSHolding(s) in Company
27th Apr 202611:32 amRNSHolding(s) in Company
8th Apr 202612:02 pmRNSHolding(s) in Company
1st Apr 20267:00 amRNSHalf-year Financial Report
23rd Mar 202612:59 pmRNSHolding(s) in Company
18th Mar 20263:12 pmRNSHolding(s) in Company
11th Mar 20265:35 pmRNSHolding(s) in Company
11th Mar 20265:35 pmRNSHolding(s) in Company
3rd Mar 20265:22 pmRNSHolding(s) in Company
2nd Mar 202610:08 amRNSHolding(s) in Company
19th Feb 20264:01 pmRNSResult of AGM
19th Feb 20263:54 pmRNSHolding(s) in Company
11th Feb 20267:00 amRNSUpdate
21st Jan 202611:43 amRNSNotice of AGM
20th Jan 20262:43 pmRNSHolding(s) in Company
30th Dec 20253:24 pmRNSHolding(s) in Company
30th Dec 20253:24 pmRNSHolding(s) in Company
22nd Dec 20257:26 amRNSFinal Results
22nd Dec 20257:26 amRNSFinal Results
19th Dec 20255:57 pmRNSIssue of Shares and Other Matters
19th Dec 20255:57 pmRNSIssue of Shares and Other Matters
19th Dec 202511:44 amRNSIssue of Shares and Warrants
19th Dec 202511:44 amRNSIssue of Shares and Warrants
25th Nov 20254:40 pmRNS-RUpdate
23rd Oct 202511:03 amRNSProgress Implementing New JV in DRC
23rd Oct 202510:25 amRNSHolding(s) in Company
15th Oct 20257:00 amRNSConditional Sale of Ivory Coast Licences
25th Sep 20255:45 pmRNSHolding(s) in Company
22nd Sep 20252:51 pmRNSUpdate on certain transactions
12th Sep 20257:00 amRNSSale of Royalty
4th Sep 202512:29 pmRNSResult of AGM
8th Aug 202511:58 amRNSNotice of AGM
5th Aug 20251:29 pmRNS-RUpdate on Burkina Faso and Ivory Coast
21st Jul 20257:00 amRNSBusiness and Financial Review
7th Jul 20254:41 pmRNSIssue of Equity
12th Jun 20257:00 amRNSUpdate
15th May 20258:04 amRNSIssue of Equity and Warrants and update on DRC
2nd May 20251:58 pmRNSIssue of Shares
29th Apr 20256:28 pmRNSShare issue under SIP, Directors' dealings and TVR
31st Mar 20255:04 pmRNSHalf-year Report
25th Feb 20255:46 pmRNSIssue of Equity, Total Voting Rights
19th Feb 20256:05 pmRNS-RUpdate on DRC proceedings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.