REMINDER: Our user survey closes on Friday, please submit your responses here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0475
Bid: 0.045
Ask: 0.05
Change: -0.005 (-9.52%)
Spread: 0.005 (11.111%)
Open: 0.0525
High: 0.0525
Low: 0.0475
Prev. Close: 0.0525
RRR Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Burkino Faso Exploration Update - Bilbale Project

6 Jan 2023 07:00

RNS Number : 8681L
Red Rock Resources plc
06 January 2023
 

Red Rock Resources PLC

("Red Rock" or the "Company")

Burkina Faso Exploration Update

Bilbale Project - Mineralisation Confirmed at Second Drill Target

 

6 January 2023

Red Rock Resources Plc ("Red Rock" or "the Company"), the natural resource development company with interests in gold, manganese and base metals, principally in Africa and Australia, announces further to the announcement made on 5th September 2021 the results of second batch of 380 samples (including QAQC) from its recently completed 2022 RC drilling exploration programme in Bilbale in Burkina Faso conducted by the Company's wholly owned subsidiary, Faso Greenstone Resources SARL ("FGR").

Highlights:

Ø Laboratory results from 380 samples from 3 RC holes totalling 358 metres completed at Bilbale artisanal mining site

Ø Samples collected at 1m interval depth and sent with duplicates, standards and blanks for testing at Ouagadougou laboratory of SGS Burkina SA

Ø BilR22-05 drillhole, results included:

11m at 0.26 g/t gold from 42 metres depth, including 2m at 0.5 g/t

4m at 0.77 g/t from 68 metres depth, including 1m at 2.68 g/t gold from 70 metres depth

Ø Ground geophysics will now be carried out and will be followed by further drill testing in a later programme

Red Rock Chairman Andrew Bell comments: "As Red Rock through its Australian gold joint venture began in December to drill for extensions of the old Berringa Mines in Victoria, further results from the Company's Autumn drilling of gold prospects in Burkina Faso were coming through.

In Burkina Faso, the initial scout drilling programme of seven holes across two locations in the extremely promising Bilbale licence produced, in the first phase at the Djikologo target, gold intersections in three of the four holes drilled, with three relatively high grade intersections in the BilR22-03 drillhole including 20m at 3.19 g/t gold from 22m depth.

This second phase intersected gold mineralisation in two of the three holes at the Bilbale artisanal area, but at more modest tenors. As we emphasise in early stage drilling, we are drilling at that point for structure and not grade, and any intersections over 1 g/t show we are in mineralisation and so are positive.

The results obtained across the two prospects from a small programme that, to meet spend commitments on an acquired licence, had been accelerated and so had not been preceded by any detailed geochemical and geophysical preparation, were good. The next stage will be some ground geophysics in preparation for further drilling."

 

Additional Information

The assets are held by Faso Greenstone Resources SARL ("FGR"), a wholly owned subsidiary of Faso Minerals Limited, which itself is currently wholly owned by Red Rock.

FGR is a company targeting the next significant gold discovery in Burkina Faso. FGR has consolidated two prospective project areas in the south-west of the country.

The licenses are situated in the south-west of Burkina Faso in the Boromo and Banfora greenstone belts.

Note: where rock geochemistry results are shown below or in the accompanying figures, these are rock chip samples chosen by the geologist on the ground not according to any systematic grid but because the rocks looked interesting. Rock chip sample results may indicate the presence of in situ or transported auriferous material at surface, and so are useful in early stage exploration, but provide no indication of extent or grade of any nearby mineralisation. Where historic results are shown, these have not been independently verified by the Company and are not to be relied upon, but have helped identify areas of interest.

Bilbale - Summary

With a surface of 183.62 km², the Bilbale project area is located in the prolific Boromo greenstone belt.

The region is a major gold producing district. The Gaoua gold deposit (4.4 Moz) is located 50 km to the south, and the Poura gold mine (3 Moz) is located 70 km to the north. The Wa gold deposit (>1 Moz) in Ghana is located 50 km to the south and the Konkera gold deposit (3.3 Moz) of Ampella Mining is located 110 Km to the south.

There is an extensive presence of artisanal gold working sites on the permit area.

Rock chip sampling in 2020 included samples reported at 8.1 g/tAu, 6.25 g/tAu, 2.57 g/tAu, 2.56 g/tAu, 1.74 g/t Au, and 1.19 g/tAu.

Historical geophysical airborne survey by Sarama Mining Burkina (2011) revealed curved faults and shear zones, N-S trending, through the entire permit.

Fig 1: Historic Exploration in the Bilbale Licence

http://www.rns-pdf.londonstockexchange.com/rns/8681L_1-2023-1-5.pdf

In 2022 the Company conducted mapping of the Bilbale Artisanal Area site, and rock geochemistry over some target areas, with 108 samples taken, together with termite mound sampling at the Bilbale Artisanal Area site, where 29 samples were taken, including:

 

Sample-ID

g/tAu

Zone

sample-Type

DD-006

11.4

Bilbale site

pit-dump

Bil-0000519

9.14

Bilbale_Principal site

pit-dump

000149

5.61

Bontioli_principal site

pit-dump

000143

3.65

Sêro orp. site

pit-dump

000148

3.36

Bontioli_principal site

pit-dump

Bil-0000528

3.05

Sêro orp. site

pit-dump

000107

2.82

Bilbale site

pit-dump

Bil-0000518

2.74

Bilbale_Principal site

pit-dump

000117

2.555

Bilbale site

pit-dump

000111

2.365

Bilbale site

pit-dump

DD-008

2.29

Bilbale site

pit-dump

000138

2.275

Koulagang orp. Site

pit-dump

000139

2.07

Koulagang orp. Site

pit-dump

Bil-0000521

2.02

Bilbale_Principal site

pit-dump

Table 1: 2022 Rock Geochemistry selected results

Fig 2: Rock Geochemistry in the Bilbale Licence, including 2022 work, and 2022 Drilling Locations

http://www.rns-pdf.londonstockexchange.com/rns/8681L_2-2023-1-5.pdf

The Drill Programme

The drilling was conducted under the supervision of FGR geologists by Forage Orbit Garant BF SAS with a reverse circulation drill and comprised a programme of four holes totalling 420 metres at the first location, Djikologo, and three holes (listed in Table 2 below) totalling 358 metres at the second location, Bilbale Artisanal Area.

 

Hole ID

Azimuth

Dip

Hole Depth (m)

Easting*

Northing*

Elevation

BilR22-05

290

-50

153

495316

1210793

314

BilR22-06

290

-50

85

495261

1210720

309

BilR22-07

290

-50

120

495342

1210883

315

Table 2: Drill Programme Collars at Bilbale

*Projection: WGS 84 UTM Zone 30 North

 

Samples with standards, duplicates and blanks were sent for fire assay analysis with atomic absorption finish at the Ouagadougou laboratory of SGS Burkina SA, an affiliate of the Société Générale de Surveillance.

Fig 3: Historic and current drillholes location at Bilbale's artisanal mining area

http://www.rns-pdf.londonstockexchange.com/rns/8681L_3-2023-1-5.pdf

Results from Bilbale have been received and significant gold intersections are reported here (see also Appendix 1 below):

Hole ID

From (m)

To (m)

Interval (m)

Au (g/t)

BilR22-05

42

53

11

0.26

and

68

72

4

0.77

and

102

104

2

0.24

BilR22-06

 

37

 

39

2

 

0.15

BilR22-07

No significant intersections

Table 3: Summary of Bilbale Drill Results

Appendix 1: Laboratory results for Bilbale drillholes

 

Hole ID

Sample ID

Weight

From

To

Au ppm

QAQC

BilR22-05

748

2.94

0

1

BilR22-05

749

2.44

1

2

BilR22-05

750

2.26

2

3

BilR22-05

751

2.56

3

4

BilR22-05

752

2.67

4

5

BilR22-05

753

2.83

5

6

BilR22-05

754

2.23

6

7

BilR22-05

755

2.16

7

8

BilR22-05

756

2.84

8

9

BilR22-05

757

2.79

9

10

BilR22-05

758

2.56

10

11

BilR22-05

759

2.73

11

12

0.01

BilR22-05

760

2.75

11

12

DUPLICATE

BilR22-05

761

2.84

12

13

BilR22-05

762

2.63

13

14

BilR22-05

763

2.63

14

15

BilR22-05

764

2.33

15

16

BilR22-05

765

2.42

16

17

BilR22-05

766

2.98

17

18

BilR22-05

767

2.14

18

19

0.02

BilR22-05

768

2.45

19

20

BilR22-05

769

2.4

20

21

BilR22-05

770

3.13

21

22

BilR22-05

771

2.93

22

23

0.02

BilR22-05

772

2.91

23

24

BilR22-05

773

3.16

24

25

BilR22-05

774

3.24

25

26

BilR22-05

775

2

BLANK

BilR22-05

776

2.85

26

27

BilR22-05

777

3.23

27

28

BilR22-05

778

3.06

28

29

BilR22-05

779

2.83

29

30

BilR22-05

780

0.05

4.55

STANDARD

BilR22-05

781

3.1

30

31

0.04

BilR22-05

782

2.94

31

32

BilR22-05

783

3.34

32

33

BilR22-05

784

3.07

33

34

BilR22-05

785

3.26

34

35

BilR22-05

786

2.47

35

36

BilR22-05

787

3.26

36

37

BilR22-05

788

2.44

37

38

BilR22-05

789

2.52

38

39

BilR22-05

790

2.54

39

40

BilR22-05

791

2.57

40

41

0.02

BilR22-05

792

2.26

41

42

0.03

BilR22-05

793

2.5

42

43

0.42

BilR22-05

794

2.51

43

44

0.15

BilR22-05

795

2.86

44

45

0.16

BilR22-05

796

2.4

45

46

0.22

BilR22-05

797

2.48

46

47

0.46

BilR22-05

798

2.3

47

48

0.53

BilR22-05

799

2.61

48

49

0.13

BilR22-05

800

2.54

49

50

0.08

BilR22-05

801

2.83

50

51

0.15

BilR22-05

802

3.13

51

52

0.41

BilR22-05

803

2.52

52

53

0.16

BilR22-05

804

2.68

53

54

0.06

BilR22-05

805

2.28

54

55

0.06

BilR22-05

806

3.21

55

56

0.04

BilR22-05

807

2.97

56

57

0.04

BilR22-05

808

2.95

57

58

0.03

BilR22-05

809

2.6

58

59

BilR22-05

810

2.75

59

60

BilR22-05

811

2.82

60

61

BilR22-05

812

2.54

61

62

BilR22-05

813

2.54

62

63

BilR22-05

814

3.31

63

64

0.04

BilR22-05

815

2.77

64

65

0.1

BilR22-05

816

2.89

65

66

BilR22-05

817

2.91

66

67

BilR22-05

818

2.26

67

68

BilR22-05

819

2.43

68

69

0.17

BilR22-05

820

3.04

69

70

0.05

BilR22-05

821

2.21

70

71

2.68

BilR22-05

822

2.35

71

72

0.18

BilR22-05

823

2.92

72

73

BilR22-05

824

2.13

73

74

BilR22-05

825

2.27

BLANK

BilR22-05

826

2.6

74

75

BilR22-05

827

3.09

75

76

BilR22-05

828

2.79

76

77

BilR22-05

829

2.25

77

78

BilR22-05

830

2.38

77

78

0.02

DUPLICATE

BilR22-05

831

2.35

78

79

BilR22-05

832

2.48

79

80

0.02

BilR22-05

833

2.22

80

81

0.07

BilR22-05

834

2.79

81

82

0.04

BilR22-05

835

2.73

82

83

0.1

BilR22-05

836

2.89

83

84

0.07

BilR22-05

837

1.98

84

85

0.2

BilR22-05

838

1.83

85

86

BilR22-05

839

2.19

86

87

0.02

BilR22-05

840

0.05

4.76

STANDARD

BilR22-05

841

2.67

87

88

0.03

BilR22-05

842

2.14

88

89

BilR22-05

843

1.88

89

90

BilR22-05

844

2.23

90

91

0.02

BilR22-05

845

3.12

91

92

BilR22-05

846

2.18

92

93

0.02

BilR22-05

847

3.22

93

94

BilR22-05

848

2.09

94

95

0.01

BilR22-05

849

3.15

95

96

BilR22-05

850

2.36

96

97

BilR22-05

851

3.2

97

98

0.02

BilR22-05

852

3.03

98

99

BilR22-05

853

1.95

99

100

BilR22-05

854

3.21

100

101

0.02

BilR22-05

855

2.86

101

102

BilR22-05

856

2.72

102

103

0.2

BilR22-05

857

2.82

103

104

0.29

BilR22-05

858

2.66

104

105

BilR22-05

859

2.35

105

106

BilR22-05

860

2.43

105

106

DUPLICATE

BilR22-05

861

2.84

106

107

BilR22-05

862

2.46

107

108

BilR22-05

863

2.42

108

109

BilR22-05

864

2.74

109

110

BilR22-05

865

2.84

110

111

0.02

BilR22-05

866

3.19

111

112

BilR22-05

867

2.62

112

113

0.02

BilR22-05

868

2.69

113

114

BilR22-05

869

2.82

114

115

0.02

BilR22-05

870

2.94

115

116

BilR22-05

871

2.31

116

117

BilR22-05

872

2.38

117

118

BilR22-05

873

2.9

118

119

BilR22-05

874

3.02

119

120

BilR22-05

875

2.26

BLANK

BilR22-05

876

2.59

120

121

BilR22-05

877

2.83

121

122

BilR22-05

878

2.95

122

123

0.36

BilR22-05

879

2.83

123

124

BilR22-05

880

0.05

4.62

STANDARD

BilR22-05

881

2.89

124

125

BilR22-05

882

2.8

125

126

BilR22-05

883

2.77

126

127

BilR22-05

884

3.16

127

128

BilR22-05

885

3.14

128

129

BilR22-05

886

2.6

129

130

BilR22-05

887

2.03

130

131

BilR22-05

888

2.29

131

132

BilR22-05

889

3.06

132

133

0.02

BilR22-05

890

3.16

133

134

0.02

BilR22-05

891

2.8

134

135

BilR22-05

892

2.7

135

136

BilR22-05

893

2.56

136

137

BilR22-05

894

2.35

137

138

BilR22-05

895

2.68

138

139

0.02

BilR22-05

896

2.53

139

140

0.02

BilR22-05

897

2.68

140

141

0.03

BilR22-05

898

3.38

141

142

0.02

BilR22-05

899

2.35

142

143

0.02

BilR22-05

900

2.44

143

144

BilR22-05

901

2.38

144

145

BilR22-05

902

2.1

145

146

BilR22-05

903

2.94

146

147

0.02

BilR22-05

904

3.07

147

148

0.02

BilR22-05

905

2.59

148

149

BilR22-05

906

3.17

149

150

BilR22-05

907

2.04

150

151

BilR22-05

908

2.34

151

152

BilR22-05

909

2.7

152

153

BilR22-06

910

0

1

LNR

BilR22-06

911

1

2

LNR

BilR22-06

912

2.59

2

3

BilR22-06

913

2.96

3

4

BilR22-06

914

2.46

4

5

BilR22-06

915

2.01

5

6

BilR22-06

916

2.41

6

7

BilR22-06

917

2.12

7

8

BilR22-06

918

2.27

8

9

BilR22-06

919

2.56

9

10

0.01

BilR22-06

920

2.28

10

11

0.02

BilR22-06

921

2.26

11

12

0.02

BilR22-06

922

2.3

12

13

0.03

BilR22-06

923

2.48

13

14

BilR22-06

924

2.8

14

15

0.02

BilR22-06

925

1.95

BLANK

BilR22-06

926

3

15

16

BilR22-06

927

2.5

16

17

BilR22-06

928

2.23

17

18

BilR22-06

929

2.53

18

19

BilR22-06

930

2.63

18

19

DUPLICATE

BilR22-06

931

2.21

19

20

BilR22-06

932

2.42

20

21

BilR22-06

933

2.38

21

22

BilR22-06

934

2.22

22

23

BilR22-06

935

2.4

23

24

BilR22-06

936

3.18

24

25

BilR22-06

937

2.3

25

26

BilR22-06

938

2.38

26

27

BilR22-06

939

2.34

27

28

BilR22-06

940

0.05

4.52

STANDARD

BilR22-06

941

2.64

28

29

BilR22-06

942

2.37

29

30

BilR22-06

943

3.03

30

31

BilR22-06

944

2.46

31

32

BilR22-06

945

2.47

32

33

BilR22-06

946

1.92

33

34

BilR22-06

947

2.07

34

35

BilR22-06

948

2.46

35

36

BilR22-06

949

2.32

36

37

BilR22-06

950

2.09

37

38

0.11

BilR22-06

951

2.11

38

39

0.19

BilR22-06

952

2.93

39

40

0.02

BilR22-06

953

2.06

40

41

BilR22-06

954

2.91

41

42

BilR22-06

955

2.91

42

43

BilR22-06

956

2.76

43

44

BilR22-06

957

3.17

44

45

BilR22-06

958

3.04

45

46

BilR22-06

959

2.62

46

47

0.03

BilR22-06

960

2.75

46

47

DUPLICATE

BilR22-06

961

2.93

47

48

BilR22-06

962

3

48

49

BilR22-06

963

2.36

49

50

BilR22-06

964

2.51

50

51

BilR22-06

965

2.84

51

52

BilR22-06

966

2.4

52

53

BilR22-06

967

3.04

53

54

0.02

BilR22-06

968

2.75

54

55

0.02

BilR22-06

969

2.8

55

56

BilR22-06

970

3.17

56

57

0.03

BilR22-06

971

2.18

57

58

BilR22-06

972

1.93

58

59

BilR22-06

973

2.17

59

60

BilR22-06

974

2.81

60

61

BilR22-06

975

1.96

BLANK

BilR22-06

976

2.47

61

62

BilR22-06

977

2.48

62

63

BilR22-06

978

2.67

63

64

BilR22-06

979

3.24

64

65

BilR22-06

980

0.05

4.68

STANDARD

BilR22-06

981

2.97

65

66

BilR22-06

982

2.51

66

67

BilR22-06

983

2.95

67

68

BilR22-06

984

2.79

68

69

BilR22-06

985

2.54

69

70

BilR22-06

986

2.14

70

71

BilR22-06

987

2.17

71

72

BilR22-06

988

2.51

72

73

BilR22-06

989

2.75

73

74

BilR22-06

990

2.99

74

75

0.05

BilR22-06

991

2.57

75

76

BilR22-06

992

3.22

76

77

BilR22-06

993

2.21

77

78

BilR22-06

994

2.79

78

79

BilR22-06

995

2.33

79

80

BilR22-06

996

2.34

80

81

0.06

BilR22-06

997

2.4

81

82

0.02

BilR22-06

998

2.89

82

83

BilR22-06

999

2.26

83

84

BilR22-06

1000

2.28

84

85

BilR22-07

1001

2.38

0

1

BilR22-07

1002

2.6

1

2

0.02

BilR22-07

1003

2.8

2

3

BilR22-07

1004

2.35

3

4

0.02

BilR22-07

1005

2.33

4

5

BilR22-07

1006

2.19

5

6

BilR22-07

1007

2.12

6

7

BilR22-07

1008

2.27

7

8

BilR22-07

1009

2.42

8

9

BilR22-07

1010

2.78

9

10

BilR22-07

1011

2.68

10

11

BilR22-07

1012

3.03

11

12

BilR22-07

1013

2.75

12

13

BilR22-07

1014

2.93

13

14

BilR22-07

1015

2.09

14

15

BilR22-07

1016

2.14

15

16

0.02

BilR22-07

1017

2.36

16

17

0.02

BilR22-07

1018

2.66

17

18

BilR22-07

1019

2.14

18

19

BilR22-07

1020

2.22

19

20

BilR22-07

1021

2.23

20

21

BilR22-07

1022

2.52

21

22

BilR22-07

1023

1.97

22

23

BilR22-07

1024

2.56

23

24

BilR22-07

1025

2.05

BLANK

BilR22-07

1026

2.25

24

25

BilR22-07

1027

2.24

25

26

BilR22-07

1028

2.02

26

27

BilR22-07

1029

2.94

27

28

BilR22-07

1030

2.99

27

28

DUPLICATE

BilR22-07

1031

2.24

28

29

BilR22-07

1032

2.98

29

30

BilR22-07

1033

3.16

30

31

BilR22-07

1034

3

31

32

BilR22-07

1035

2.87

32

33

0.02

BilR22-07

1036

2.62

33

34

BilR22-07

1037

2.92

34

35

BilR22-07

1038

2.79

35

36

BilR22-07

1039

1.92

36

37

BilR22-07

1040

0.05

4.53

STANDARD

BilR22-07

1041

2.54

37

38

BilR22-07

1042

2.78

38

39

BilR22-07

1043

1.92

39

40

BilR22-07

1044

2.5

40

41

0.04

BilR22-07

1045

3.18

41

42

0.02

BilR22-07

1046

3.02

42

43

BilR22-07

1047

2.28

43

44

0.02

BilR22-07

1048

2.44

44

45

0.02

BilR22-07

1049

2.37

45

46

0.04

BilR22-07

1050

2.97

46

47

BilR22-07

1051

2.63

47

48

BilR22-07

1052

2.94

48

49

BilR22-07

1053

2.76

49

50

0.02

BilR22-07

1054

3.06

50

51

0.04

BilR22-07

1055

3.04

51

52

0.02

BilR22-07

1056

2.74

52

53

BilR22-07

1057

2.74

53

54

BilR22-07

1058

2.17

54

55

0.02

BilR22-07

1059

2.94

55

56

0.06

BilR22-07

1060

2.9

55

56

0.06

DUPLICATE

BilR22-07

1061

2.97

56

57

0.04

BilR22-07

1062

2.74

57

58

0.02

BilR22-07

1063

2.8

58

59

0.04

BilR22-07

1064

2.22

59

60

0.04

BilR22-07

1065

2.92

60

61

0.04

BilR22-07

1066

3.15

61

62

BilR22-07

1067

2.27

62

63

BilR22-07

1068

2.82

63

64

BilR22-07

1069

2.66

64

65

BilR22-07

1070

2.29

65

66

BilR22-07

1071

2.99

66

67

BilR22-07

1072

2.62

67

68

0.02

BilR22-07

1073

2.77

68

69

BilR22-07

1074

2.33

69

70

BilR22-07

1075

2.03

BLANK

BilR22-07

1076

2.42

70

71

0.03

BilR22-07

1077

2.17

71

72

0.03

BilR22-07

1078

2.92

72

73

BilR22-07

1079

1.86

73

74

BilR22-07

1080

0.05

4.76

STANDARD

BilR22-07

1081

3.03

74

75

0.03

BilR22-07

1082

2.03

75

76

BilR22-07

1083

2.86

76

77

BilR22-07

1084

2.92

77

78

BilR22-07

1085

3.25

78

79

BilR22-07

1086

2.38

79

80

BilR22-07

1087

3.25

80

81

BilR22-07

1088

3.17

81

82

BilR22-07

1089

2.78

82

83

BilR22-07

1090

2.57

83

84

BilR22-07

1091

2.57

84

85

0.02

BilR22-07

1092

2.47

85

86

0.02

BilR22-07

1093

3.06

86

87

BilR22-07

1094

3.04

87

88

BilR22-07

1095

2.52

88

89

BilR22-07

1096

3.08

89

90

BilR22-07

1097

2.02

90

91

BilR22-07

1098

3.2

91

92

BilR22-07

1099

3.09

92

93

BilR22-07

1100

3.1

93

94

BilR22-07

1101

2.34

94

95

BilR22-07

1102

2.31

95

96

BilR22-07

1103

2.2

96

97

0.03

BilR22-07

1104

1.97

97

98

0.02

BilR22-07

1105

2.33

98

99

BilR22-07

1106

2.05

99

100

BilR22-07

1107

2.75

100

101

0.03

BilR22-07

1108

2.89

101

102

0.02

BilR22-07

1109

3

102

103

BilR22-07

1110

2.92

103

104

BilR22-07

1111

2.64

104

105

BilR22-07

1112

2.39

105

106

BilR22-07

1113

2.42

106

107

BilR22-07

1114

2.66

107

108

BilR22-07

1115

2.13

108

109

BilR22-07

1116

2.14

109

110

BilR22-07

1117

2.56

110

111

BilR22-07

1118

2.48

111

112

BilR22-07

1119

2.25

112

113

BilR22-07

1120

2.39

113

114

BilR22-07

1121

2.86

114

115

0.02

BilR22-07

1122

2.44

115

116

0.03

BilR22-07

1123

2.28

116

117

0.06

BilR22-07

1124

2.11

117

118

0.03

BilR22-07

1125

2.04

BLANK

BilR22-07

1126

2.91

118

119

BilR22-07

1127

2.65

119

120

0.02

LNR - Listed Not Received

This technical information in this announcement has been compiled by the Company's geological adviser on Burkina Faso, M. Dakissaga Dieudonné, MSc, a Member of the European Association of Geochemists, and has been reviewed by Mr Joseph Komu, a member of AusIMM and a Manager employed by the Red Rock group. Mr Komu is a member of a recognised professional organisation and has sufficient relevant experience to qualify as a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies published by AIM.

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

 

For further information, please contact:

Andrew Bell 0207 747 9990 Chairman Red Rock Resources Plc

Roland Cornish/ Rosalind Hill Abrahams 0207 628 3396 NOMAD Beaumont Cornish Limited

Jason Robertson 0207 374 2212 Broker First Equity Limited

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDZZGGMLKKGFZM
Date   Source Headline
29th Apr 20248:19 amRNSUpdate
22nd Apr 20247:00 amRNSIssue of Equity, Directors' Dealings and TVR
11th Apr 20247:00 amRNSIssue of Equity
5th Apr 20247:00 amRNSDRC and Gold Assets Update
28th Mar 20247:00 amRNSHalf-year Report
13th Mar 20247:59 amRNSConditional agreement, Australian gold subsidiary
6th Mar 20247:00 amRNSDRC and Gold Assets Update
27th Feb 20247:00 amRNSCo-operation in Next Phase at Bilbale
20th Feb 20243:26 pmRNSHolding(s) in Company
19th Feb 20247:00 amRNSResult of AGM
14th Feb 202412:21 pmRNSDRC and Australia Gold Asset Update
7th Feb 20246:10 pmRNSHolding(s) in Company
5th Feb 20243:45 pmRNSDRC Arbitration Process Continues
2nd Feb 202410:24 amRNSAppointment of Consultant
24th Jan 20242:03 pmRNSReplacement: West African Gold Licences Update
24th Jan 20247:00 amRNSCentral and West African Assets
19th Jan 20247:00 amRNSNotice of AGM
20th Dec 20237:00 amRNSFinal Results
15th Dec 20232:05 pmRNSHolding(s) in Company
14th Dec 20237:00 amRNSIssue of Equity, Total Voting Rights
12th Dec 20231:27 pmRNSHolding(s) in Company
11th Dec 20234:53 pmRNSIssue of Equity and Update
28th Nov 20237:00 amRNSWest African Gold Licences - Update
17th Nov 20235:25 pmRNSResult of Meeting
15th Nov 20232:09 pmRNSLithium Update - Exports
14th Nov 20233:03 pmRNSAsset review - current developments
1st Nov 202312:07 pmRNSNotice of GM
19th Oct 202312:00 pmRNSConvertible Loan Note Issue: first tranche closing
13th Oct 20233:12 pmRNSCentral Africa Update and comment on share price
20th Sep 20237:00 amRNSLithium Samples - Zimbabwe
4th Sep 20236:28 pmRNSHolding(s) in Company
31st Aug 20235:54 pmRNSTotal Voting Rights
22nd Aug 20233:50 pmRNSExercise of Convertible Loan Notes, TVR
18th Aug 20234:08 pmRNSLithium Update - Zimbabwe
7th Aug 20237:00 amRNSConvertible Loan Notes extension, conversion, TVR
2nd Aug 20232:21 pmRNSHolding(s) in Company
3rd Jul 20233:37 pmRNSLithium Update - Zimbabwe
3rd Jul 20232:34 pmRNSHolding(s) in Company
30th Jun 20234:03 pmRNSHolding(s) in Company
22nd Jun 20237:00 amRNSIssue of Equity and Total Voting Rights
21st Jun 20234:00 pmRNSHolding(s) in Company
21st Jun 202310:16 amRNSIssue of Equity and Total Voting Rights
20th Jun 20233:49 pmRNSHolding(s) in Company
19th Jun 20231:29 pmRNSResult of AGM
19th Jun 202312:30 pmRNSHolding(s) in Company
16th Jun 20234:00 pmRNSHolding(s) in Company
16th Jun 20232:57 pmRNSGrant of First Cote D'Ivoire Licence
15th Jun 202312:00 pmRNSLithium Update
2nd Jun 20233:27 pmRNSHolding(s) in Company
2nd Jun 20232:48 pmRNSNotice of General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.