The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksROSE.L Regulatory News (ROSE)

  • There is currently no data for ROSE

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Additional High-grade Uranium Results, Wate Pipe

1 Jul 2010 07:00

RNS Number : 5812O
Vane Minerals PLC
01 July 2010
 



1st July 2010

VANE Minerals plc (AIM:VML)

("VANE" or the "Company")

Additional High-grade Uranium Drilling Results, Wate Breccia Pipe

Arizona, USA

 

HIGHLIGHTS

·; Hole WT-37; 18.5 feet @ 0.35% U3O8 from 1,299.5 - 1,318.0 feet

11.5 feet @ 1.25% U3O8 from 1,362.5 - 1,374.0 feet

 

VANE Minerals today announces continued successful results from further delineation drilling at the Wate project. The Company's wholly-owned subsidiary, VANE Minerals (US) LLC, has encountered two significant ore-grade intercepts in Hole WT-37. On the 25th of May 2010, the Company announced the completion of an NI43-101 resource of 695,000 lbs U3O8 grading 0.80% U3O8 on the Wate Pipe which is located on state lands held in the joint venture (JV) with Uranium One Exploration U.S.A. Inc (U1). The JV intends to complete limited additional drilling in order to increase the resource to 1 million pounds U3O8 which is the resource needed, based on internal guidelines, to move the project to prefeasibility.

The collar of Hole WT-37 is located 30 feet west of previously identified mineralization. The hole encountered two main mineralized zones as follows using a cutoff grade of 0.20% U3O8:

1,299.5 - 1,318.0 feet (18.5 feet) @ 0.35% U3O8

1,362.5 - 1,374.0 feet (11.5 feet) @ 1.25% U3O8

 

 

Due to hole deviation at depth, the mineralized intercepts are approximately 35 feet, S55°W from where the hole was collared. These new intercepts add significantly more dimension to the mineralization and pipe diameter in a southwest direction. The next hole is planned for a location designed to test for mineralization in the inferred location of the southeast part of the pipe. As new mineralized intercepts are encountered, the data will be provided to SRK to update the resource model until the 1mm lbs total is obtained. With this additional drilling, management anticipates converting the "inferred resource" into "indicated resource". The planned prefeasibility study could then convert the resources into reserves in line with NI 43-101 rules.

Previous drilling from surface by Rocky Mountain Energy (RME) resulted in resources calculated by RME of between 1.1mm and 2.4mm lbs U3O8 grading 0.80% to 0.83% U3O8. It is important to note that historically, delineation drilling from underground of similar pipe ore bodies has resulted in the deposit enlarging by an average of 3.5 times.

 

Kristopher K. Hefton, Chief Operating Officer VANE Minerals (US) LLC, BSc Geology, who meets the criteria of a qualified person under the AIM Rules - Guidance for Mining, Oil and Gas Companies, has reviewed and approved the technical information contained within this announcement. VANE Minerals, as operator of the joint venture, is responsible for the contents of this press release

 

Steve Van Nort, CEO, commented: "These results are encouraging in that high-grade mineralization was encountered and the pipe dimensions were increased. Our plan remains to delineate 1mm lbs of U3O8 from our surface drilling and to initiate the Arizona State Mineral Development Report which will lead to a Mineral Lease at which time underground development work would begin. We also look forward to announcing results from our Mexican precious metals production expansion

JV and our US porphyry copper portfolio over the coming months. "

For further information, please contact:

VANE Minerals Plc

+44 (0) 20 7667 6322

Matthew Idiens

 

Arbuthnot Securities

+44 (0) 20 7012 2000

Richard Johnson/ Antonio Bossi

 

Threadneedle Communications

+44 (0) 20 7653 9850

Laurence Read/ Beth Harris

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQBLFXBQFBBBB
Date   Source Headline
3rd Aug 20067:02 amRNSUranium Update
8th Jun 200612:38 pmRNSAnnual Report and Accounts
15th May 20066:06 pmRNSAGM Statement
10th May 20061:07 pmRNSHolding(s) in Company - Amend
9th May 20066:29 pmRNSHolding(s) in Company
24th Apr 20067:01 amRNSFreeport Agreement
6th Apr 20067:01 amRNSPreliminary Results
9th Mar 20069:01 amRNSProject Portfolio Update
16th Jan 20069:00 amRNSTrading Update
16th Jan 20067:01 amRNSChange of Adviser
17th Nov 20057:01 amRNSUranium Property Acquisition
10th Nov 20057:01 amRNSSampling Results
2nd Nov 20059:50 amRNSProduction at Diablito
5th Sep 20057:00 amRNSInterim Results
21st Jul 20057:00 amRNSAcquisition - Copper Prospect
18th Jul 20059:54 amRNSDrilling Report
4th Jul 200510:04 amRNSUpdate on Guadalcazar
26th May 20057:01 amRNSDrilling Report
12th May 200511:44 amRNSResult of AGM
11th May 20057:00 amRNSDiablito Mining Operations
3rd May 20057:00 amRNSUranium Properties Obtained
11th Apr 20058:36 amRNSUranium Update
8th Apr 20057:00 amRNSFinal Results
15th Mar 20059:23 amRNSDrilling Report
7th Mar 20057:01 amRNSNew Uranium Project
4th Mar 20057:00 amRNSDiablito Project Update
18th Feb 20057:02 amRNSDrilling Report
20th Jan 20057:00 amRNSFreeport Agreement Extended

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.