Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksROSE.L Regulatory News (ROSE)

  • There is currently no data for ROSE

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Additional High-grade Uranium Results, Wate Pipe

1 Jul 2010 07:00

RNS Number : 5812O
Vane Minerals PLC
01 July 2010
 



1st July 2010

VANE Minerals plc (AIM:VML)

("VANE" or the "Company")

Additional High-grade Uranium Drilling Results, Wate Breccia Pipe

Arizona, USA

 

HIGHLIGHTS

·; Hole WT-37; 18.5 feet @ 0.35% U3O8 from 1,299.5 - 1,318.0 feet

11.5 feet @ 1.25% U3O8 from 1,362.5 - 1,374.0 feet

 

VANE Minerals today announces continued successful results from further delineation drilling at the Wate project. The Company's wholly-owned subsidiary, VANE Minerals (US) LLC, has encountered two significant ore-grade intercepts in Hole WT-37. On the 25th of May 2010, the Company announced the completion of an NI43-101 resource of 695,000 lbs U3O8 grading 0.80% U3O8 on the Wate Pipe which is located on state lands held in the joint venture (JV) with Uranium One Exploration U.S.A. Inc (U1). The JV intends to complete limited additional drilling in order to increase the resource to 1 million pounds U3O8 which is the resource needed, based on internal guidelines, to move the project to prefeasibility.

The collar of Hole WT-37 is located 30 feet west of previously identified mineralization. The hole encountered two main mineralized zones as follows using a cutoff grade of 0.20% U3O8:

1,299.5 - 1,318.0 feet (18.5 feet) @ 0.35% U3O8

1,362.5 - 1,374.0 feet (11.5 feet) @ 1.25% U3O8

 

 

Due to hole deviation at depth, the mineralized intercepts are approximately 35 feet, S55°W from where the hole was collared. These new intercepts add significantly more dimension to the mineralization and pipe diameter in a southwest direction. The next hole is planned for a location designed to test for mineralization in the inferred location of the southeast part of the pipe. As new mineralized intercepts are encountered, the data will be provided to SRK to update the resource model until the 1mm lbs total is obtained. With this additional drilling, management anticipates converting the "inferred resource" into "indicated resource". The planned prefeasibility study could then convert the resources into reserves in line with NI 43-101 rules.

Previous drilling from surface by Rocky Mountain Energy (RME) resulted in resources calculated by RME of between 1.1mm and 2.4mm lbs U3O8 grading 0.80% to 0.83% U3O8. It is important to note that historically, delineation drilling from underground of similar pipe ore bodies has resulted in the deposit enlarging by an average of 3.5 times.

 

Kristopher K. Hefton, Chief Operating Officer VANE Minerals (US) LLC, BSc Geology, who meets the criteria of a qualified person under the AIM Rules - Guidance for Mining, Oil and Gas Companies, has reviewed and approved the technical information contained within this announcement. VANE Minerals, as operator of the joint venture, is responsible for the contents of this press release

 

Steve Van Nort, CEO, commented: "These results are encouraging in that high-grade mineralization was encountered and the pipe dimensions were increased. Our plan remains to delineate 1mm lbs of U3O8 from our surface drilling and to initiate the Arizona State Mineral Development Report which will lead to a Mineral Lease at which time underground development work would begin. We also look forward to announcing results from our Mexican precious metals production expansion

JV and our US porphyry copper portfolio over the coming months. "

For further information, please contact:

VANE Minerals Plc

+44 (0) 20 7667 6322

Matthew Idiens

 

Arbuthnot Securities

+44 (0) 20 7012 2000

Richard Johnson/ Antonio Bossi

 

Threadneedle Communications

+44 (0) 20 7653 9850

Laurence Read/ Beth Harris

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQBLFXBQFBBBB
Date   Source Headline
3rd Aug 202012:51 pmRNSChange of Name to Zephyr Energy plc & website
29th Jul 20203:17 pmRNSResult of AGM
30th Jun 20207:00 amRNSFinal Results and notice of AGM
8th Jun 20204:30 pmRNSHolding(s) in Company
29th May 20207:00 amRNSGrant of options
5th May 20204:20 pmRNSHolding(s) in Company
1st May 20207:00 amRNSOperations and Strategy Update
10th Feb 20207:00 amRNSUpdate on restructuring of the Paradox project
10th Feb 20207:00 amRNSUpdate on McCoy Lease Working Interest Acquisition
31st Dec 20191:00 pmRNSTotal Voting Rights
3rd Dec 201912:27 pmRNSIssue of Equity and change to TVR
29th Nov 20195:00 pmRNSTotal Voting Rights
22nd Nov 20194:52 pmRNSHolding(s) in Company
21st Nov 201912:43 pmRNSResult of General Meeting and change to TVR
14th Nov 20192:10 pmRNSHolding(s) in Company
8th Nov 20194:12 pmRNSHolding(s) in Company
4th Nov 20192:16 pmRNSDirector/PDMR shareholding
4th Nov 20197:05 amRNSIssue of equity and notice of general meeting
4th Nov 20197:00 amRNSProposed Acquisition-McCoy Interest & Fundraising
14th Oct 20197:00 amRNSRestructuring of the Paradox project
30th Sep 20197:00 amRNSHalf-year Report
3rd Sep 20197:00 amRNSDirectorate Changes and Board Restructuring
2nd Sep 201910:59 amRNSHolding(s) in Company
30th Aug 20195:00 pmRNSTotal Voting Rights
22nd Aug 20197:00 amRNSIssue of equity and change to total voting rights
30th Jul 201912:46 pmRNSResult of AGM and update on Board composition
10th Jul 20193:01 pmRNSHolding(s) in Company
28th Jun 20197:00 amRNSBoard appointment and update
28th Jun 20197:00 amRNSFinal Results
27th Jun 20197:00 amRNSNotice of Annual Results
3rd Jun 20197:00 amRNSTotal Voting Rights
24th May 20197:00 amRNSSubscription completion, board appointment & TVR
20th May 20197:00 amRNSIssue of equity and Board Changes
30th Apr 20197:00 amRNSUpdated Corporate Presentation
23rd Apr 20197:00 amRNSDirectorate Change
12th Apr 20193:40 pmRNSHolding(s) in Company
12th Apr 20197:00 amRNSDirector/PDMR Shareholding
11th Apr 20197:00 amRNSIssue of equity and Board Changes
28th Mar 20197:00 amRNSUpdate & Proposed Board Changes
26th Mar 20199:41 amRNSHolding in Company - Correction
12th Mar 20194:17 pmRNSHolding(s) in Company
5th Mar 20196:09 pmRNSHolding(s) in Company
5th Mar 20199:12 amRNSHolding(s) in Company
11th Jan 20197:00 amRNSAcquisition of additional acreage in Paradox Basin
7th Jan 20197:00 amRNSSchlumberger Study Results
6th Dec 20187:00 amRNSOperations Update
27th Nov 20187:00 amRNSDatabase Agreement & North Wash Vanadium update
1st Nov 20187:00 amRNSBLM Approval for Permit to Drill GV 22-1 well
3rd Oct 20187:00 amRNSHolding(s) in Company
25th Sep 20187:00 amRNSHalf-year Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.