Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRockpool Acqui Regulatory News (ROC)

  • This share is currently suspended. It was suspended at a price of 2.85

Share Price Information for Rockpool Acqui (ROC)

Share Price is delayed by 15 minutes
Get Live Data
2.85    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £362.66k
ROC Live PriceLast checked at - London Stock Exchange

Intraday Rockpool Acqui Share Chart

Drilling Update

22 Aug 2006 07:00

Hardman Resources Limited22 August 2006 STOCK EXCHANGE / MEDIA RELEASE RELEASE DATE: 22 August 2006 AUSTRALIAN CONTACT: Simon Potter Hardman Resources Ltd +61 8 9261 7600 LONDON CONTACT: Patrick Handley Brunswick Group (UK media relations) +44 207 404 5959 RE: UGANDA FLOW TEST AND MAURITANIA DRILLING UPDATE Hardman Resources Limited ("Hardman") provides the following update on its flowtesting and exploration drilling operations: Uganda: Mputa-1 Flow Test Update (Block 2) Hardman has completed a successful testing campaign at the Mputa-1 discoverywell. Since our last announcement on 15 August, the upper sand interval has nowbeen tested on natural flow. Results from both zones tested are summarisedbelow: Test Perforated Interval Choke Flow Rate Oil Quality (metres) (bopd) o APILower Sand Zone (DST 2)1,118.0 - 1,126.0 32/64" 300 32Upper Sand Zone (DST 3)966.5 - 974.5 40/64" 820 33 TOTAL 1,120 The test results prove not only that the oil at Mputa is mobile, but also thatthe reservoir sands are capable of producing dry oil under natural flow atpotentially commercial rates. The latter aspect is particularly significant,given that the Mputa reservoirs are at shallower depth, and are hence at lowerpressure and temperature than the corresponding reservoir units at Waraga. Thispositive test result therefore expands the operating envelope over which typicalWaraga and Mputa crudes (32 degrees API) can be produced and eliminates pre-testconcerns over oil viscosity and fluid properties at these shallower depths. Although laboratory confirmation is still awaited, the gravity of all oil flowedat Mputa is similar to that found in the lower units of the Waraga-1 well and islikely to be of similar origin. The Mputa-1 well is located 220 kilometresnorthwest of the Ugandan capital Kampala and 8 kilometres from the shore of LakeAlbert. The Waraga-1 well is located 19 kilometres to the northeast of Mputa-1. This concludes the testing programme at Mputa-1. The well is presently beingsuspended and the rig and test crew are being stood down. Initial guidance onvolumes will be included in the company's Half Yearly Report on 29 August 2006. Hardman Resources Managing Director and CEO, Simon Potter, commented: "The positive test results from Mputa are particularly important given that wemap more oil in place in this resource than at Waraga. Natural flow from thereservoir at these pressures and temperatures are indicative that productionrates could potentially be commercial. Further, collectively the results to-dateindicate that oil from the source interval deep under the lake can migrate allthe way across the rift valley to the boundary fault and thus potentially overthe whole licence, considerably upgrading remaining prospectivity. The joint venture has presented potential forward options to the Government andis currently in discussions concerning the way forward on each of exploration,further appraisal and potential development concepts." Equities in Block 2 are: Block 2Hardman Petroleum Africa Pty Ltd (Operator) 50.0%Tullow Oil 50.0% Times and dates for Ugandan wells refer to Uganda time (GMT+3 hours), five hoursbehind Western Standard Time (Perth). Mauritania: Exploration Drilling Update - Flamant-1 (Block 8) Since the last report, Flamant-1 has drilled ahead in 26" hole to a depth of1,867m where the 20" casing was run and cemented. As at Midnight on the 21stAugust, preparations were underway to drill ahead in the 17 1/2" hole. Flamant-1 will target Cretaceous Carbonates and has a planned total depth3,370m. The well is located in 1414m of water, approximately 210km from theshore and 195 km North-West from Pelican-1, a Cretaceous gas discovery drilledin Block 7. Equities in Block 8 are: Block 8Dana Petroleum (Operator) 41.5%Hardman Resources Ltd 18.0%Roc Oil Company 2.0%Wintershall 25%Gaz de France 13.5% Times and dates for Mauritania wells refer to GMT (Mauritania time), 8 hoursbehind Western Standard Time, Perth. SIMON POTTERManaging Director and CEO Note: (1) In accordance with the ASX Listing Rules, the geological informationsupplied in this report has been based on information provided by geologists whohave had in excess of five years experience in their field of activity. (2) In accordance with the AIM Rules, the information in this report hasbeen reviewed and signed off by Mr Andrew Patterson, B Eng., Technical Manager at Hardman Resources, who is a member of the Petroleum Exploration Society of Australia and has at least 5 years relevant experience within the sector. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
24th Jul 20067:02 amRNSActivity Update
19th Jul 20067:01 amRNSWei-6-12S-1 Oil Discovery
14th Jul 20067:39 amRNSDrilling Report
12th Jul 20067:01 amRNSDrilling Update: China
27th Jun 20067:02 amRNSROC to buy China Assets
13th Jun 20067:02 amRNSProduction Test Update: China
9th Jun 20067:01 amRNSInvestor Presentation June 06
7th Jun 20067:02 amRNSSigning of Revised PSCs
7th Jun 20067:00 amRNSSigned Revised Mauritania PSC
30th May 20067:02 amRNSUK Willows-1 Exploration Well
24th May 20067:03 amRNSUK: Willows-1 & Blane
24th May 20067:02 amRNSWei-6-12S-1, Offshore China
17th May 20067:02 amRNSAGM-CEO/Chairman's Addresses
17th May 20067:02 amRNSResolutions Put to AGM
17th May 20067:02 amRNSWei-6-12S-1 Oil Discovery
16th May 20067:01 amRNSAnnual General Meeting
16th May 20067:01 amRNSWillows-1 & Blane Oil Field
15th May 20067:03 amRNSDrilling Update - Cliff Head
10th May 20067:01 amRNSOil Discovery Offshore China
10th May 20067:01 amRNSDrilling Update: Willows-1 UK
8th May 20067:02 amRNSExploration Update: China
5th May 20067:01 amRNSExploration Drilling Update
3rd May 20067:02 amRNSExploration Drilling Update
2nd May 20067:02 amRNSCliffHead Commence Production
28th Apr 20067:03 amRNS1st Quarter Activities Report
26th Apr 20067:02 amRNSExploration Drilling Update
20th Apr 20067:01 amRNSDrilling Update - Jacala-1
19th Apr 20067:02 amRNSExploration Drilling Update
12th Apr 200610:00 amRNSAnnual Report & Notice of AGM
11th Apr 20067:01 amRNSExploration Drilling Update
4th Apr 20067:03 amRNSInvestor Presentation Apr 06
4th Apr 20067:03 amRNSJacala-1 Re-spuds Offshore WA
31st Mar 20067:03 amRNSResolution of Dispute
28th Mar 20067:04 amRNSDrilling Report
24th Mar 20067:02 amRNSJacala-1 Commences Drilling
8th Mar 20067:04 amRNS2005 Financial Results Summar
2nd Mar 20067:02 amRNSSuccessful Efforts Accounting
27th Feb 20067:02 amRNSActivity Update
3rd Feb 20067:01 amRNSMauritania -Notice of Dispute
2nd Feb 20067:01 amRNSChinguetti OilField Marketing
31st Jan 20067:02 amRNSReport for Quarter 31/12/05
30th Jan 20067:01 amRNSMauritania Drilling Update
25th Jan 20067:01 amRNSPlacement - 28 Million Shares
24th Jan 20067:01 amRNSMauritania Drilling Update
19th Jan 20067:01 amRNSLatest Investor Presentation
19th Jan 20067:01 amRNSIssue of Equity
18th Jan 20067:01 amRNSMauritania Media Speculation
17th Jan 20067:01 amRNSDrilling Report
11th Jan 20067:01 amRNSActivity and Portfolio Update
10th Jan 20067:01 amRNSDrilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.