Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRockpool Acqui Regulatory News (ROC)

  • This share is currently suspended. It was suspended at a price of 2.85

Share Price Information for Rockpool Acqui (ROC)

Share Price is delayed by 15 minutes
Get Live Data
2.85    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £362.66k
ROC Live PriceLast checked at - London Stock Exchange

Intraday Rockpool Acqui Share Chart

Drilling Update

22 Aug 2006 07:00

Hardman Resources Limited22 August 2006 STOCK EXCHANGE / MEDIA RELEASE RELEASE DATE: 22 August 2006 AUSTRALIAN CONTACT: Simon Potter Hardman Resources Ltd +61 8 9261 7600 LONDON CONTACT: Patrick Handley Brunswick Group (UK media relations) +44 207 404 5959 RE: UGANDA FLOW TEST AND MAURITANIA DRILLING UPDATE Hardman Resources Limited ("Hardman") provides the following update on its flowtesting and exploration drilling operations: Uganda: Mputa-1 Flow Test Update (Block 2) Hardman has completed a successful testing campaign at the Mputa-1 discoverywell. Since our last announcement on 15 August, the upper sand interval has nowbeen tested on natural flow. Results from both zones tested are summarisedbelow: Test Perforated Interval Choke Flow Rate Oil Quality (metres) (bopd) o APILower Sand Zone (DST 2)1,118.0 - 1,126.0 32/64" 300 32Upper Sand Zone (DST 3)966.5 - 974.5 40/64" 820 33 TOTAL 1,120 The test results prove not only that the oil at Mputa is mobile, but also thatthe reservoir sands are capable of producing dry oil under natural flow atpotentially commercial rates. The latter aspect is particularly significant,given that the Mputa reservoirs are at shallower depth, and are hence at lowerpressure and temperature than the corresponding reservoir units at Waraga. Thispositive test result therefore expands the operating envelope over which typicalWaraga and Mputa crudes (32 degrees API) can be produced and eliminates pre-testconcerns over oil viscosity and fluid properties at these shallower depths. Although laboratory confirmation is still awaited, the gravity of all oil flowedat Mputa is similar to that found in the lower units of the Waraga-1 well and islikely to be of similar origin. The Mputa-1 well is located 220 kilometresnorthwest of the Ugandan capital Kampala and 8 kilometres from the shore of LakeAlbert. The Waraga-1 well is located 19 kilometres to the northeast of Mputa-1. This concludes the testing programme at Mputa-1. The well is presently beingsuspended and the rig and test crew are being stood down. Initial guidance onvolumes will be included in the company's Half Yearly Report on 29 August 2006. Hardman Resources Managing Director and CEO, Simon Potter, commented: "The positive test results from Mputa are particularly important given that wemap more oil in place in this resource than at Waraga. Natural flow from thereservoir at these pressures and temperatures are indicative that productionrates could potentially be commercial. Further, collectively the results to-dateindicate that oil from the source interval deep under the lake can migrate allthe way across the rift valley to the boundary fault and thus potentially overthe whole licence, considerably upgrading remaining prospectivity. The joint venture has presented potential forward options to the Government andis currently in discussions concerning the way forward on each of exploration,further appraisal and potential development concepts." Equities in Block 2 are: Block 2Hardman Petroleum Africa Pty Ltd (Operator) 50.0%Tullow Oil 50.0% Times and dates for Ugandan wells refer to Uganda time (GMT+3 hours), five hoursbehind Western Standard Time (Perth). Mauritania: Exploration Drilling Update - Flamant-1 (Block 8) Since the last report, Flamant-1 has drilled ahead in 26" hole to a depth of1,867m where the 20" casing was run and cemented. As at Midnight on the 21stAugust, preparations were underway to drill ahead in the 17 1/2" hole. Flamant-1 will target Cretaceous Carbonates and has a planned total depth3,370m. The well is located in 1414m of water, approximately 210km from theshore and 195 km North-West from Pelican-1, a Cretaceous gas discovery drilledin Block 7. Equities in Block 8 are: Block 8Dana Petroleum (Operator) 41.5%Hardman Resources Ltd 18.0%Roc Oil Company 2.0%Wintershall 25%Gaz de France 13.5% Times and dates for Mauritania wells refer to GMT (Mauritania time), 8 hoursbehind Western Standard Time, Perth. SIMON POTTERManaging Director and CEO Note: (1) In accordance with the ASX Listing Rules, the geological informationsupplied in this report has been based on information provided by geologists whohave had in excess of five years experience in their field of activity. (2) In accordance with the AIM Rules, the information in this report hasbeen reviewed and signed off by Mr Andrew Patterson, B Eng., Technical Manager at Hardman Resources, who is a member of the Petroleum Exploration Society of Australia and has at least 5 years relevant experience within the sector. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
27th Feb 20097:00 amRNS2008 Financial Results: Presentation and Webcast
27th Feb 20097:00 amRNS2008 Financial Results Summary
24th Feb 20097:00 amRNSWEBCAST: 2008 Full year Financial Results
5th Feb 20097:00 amRNSInvestor Presentation - February 2009
30th Jan 20097:00 amRNSReport for Quarter Ended 31 December 2008
8th Jan 20099:46 amRNSHolding(s) in Company
5th Jan 20098:39 amRNSSubstantial Shareholder Update
24th Dec 20087:02 amRNSSubstantial Shareholder Update
4th Dec 20087:00 amRNSZhao Dong Production Increase
3rd Dec 20087:00 amRNSBoard Movements
3rd Dec 20087:00 amRNSDrillingUpdate:BandaEast Appraisal Well Mauritania
26th Nov 20087:00 amRNSDrillingUpdate:BandaEast Appraisal Well Mauritania
24th Nov 20082:49 pmRNSAdditional Listing
19th Nov 20087:00 amRNSDrillingUpdate:BandaEast Appraisal Well Mauritania
18th Nov 200811:24 amRNSSubstantial Shareholder Notice
12th Nov 20087:00 amRNSDrillingUpdate:BandaEast Appraisal Well Mauritania
5th Nov 20087:00 amRNSDrillingUpdate:BandaEast Appraisal Well Mauritania
4th Nov 20089:57 amRNSDirector/PDMR Shareholding
31st Oct 200810:22 amRNSDirector/PDMR Shareholding
28th Oct 20087:00 amRNSReport for Quarter Ended 30 September 2008
24th Oct 20087:09 amRNSZhao Dong Development Project-Production Commences
23rd Oct 200812:38 pmRNSAdditional Listing
20th Oct 20082:11 pmRNSAdditional Listing
16th Oct 20087:00 amRNSInvestor Presentation - October 2008
13th Oct 200812:18 pmRNSAdditional Listing
8th Oct 20087:00 amRNSActivity Update: Drilling
7th Oct 200811:26 amRNSAdditional Listing
7th Oct 20087:30 amRNSSubstantial Shareholder Notice
7th Oct 20087:00 amRNSBlocklisting Six Monthly Return
7th Oct 20087:00 amRNSNotice Under ASX Listing Rule 3.3
2nd Oct 200811:50 amRNSAdditional Listing
2nd Oct 20087:00 amRNSNexus Energy accepts ROC's Takeover Offer for AZA
29th Sep 20081:33 pmRNSAdditional Listing
26th Sep 20087:00 amRNSNotice under s630(3) of the Corporations Act
25th Sep 20087:00 amRNSAppointment of Chief Executive Officer
25th Sep 20087:00 amRNSSubstantial Shareholder Notice
24th Sep 200811:09 amRNSHolding(s) in Company
24th Sep 20087:00 amRNSActivity Update: Drilling
23rd Sep 20087:00 amRNSLetters to AEL/AZA Shareholders
22nd Sep 200812:05 pmRNSAdditional Listing
22nd Sep 20089:17 amRNSChange in Board
22nd Sep 20087:00 amRNSSubstantial Shareholder Notice
19th Sep 20088:53 amRNSChange of Director's Interest
19th Sep 20088:52 amRNSActivity Update: Drilling
18th Sep 20084:21 pmRNSAdditional Listing
18th Sep 20089:11 amRNSConfirmation of Final Merger Ratio
9th Sep 20089:42 amRNSSubstantial Shareholder Notic
9th Sep 20087:00 amRNSSecond Supplementary Bidder's
8th Sep 20089:43 amRNSScheme becomes Effective and
8th Sep 20088:43 amRNSAZA Announces Target Statemen

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.