Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRockpool Acqui Regulatory News (ROC)

  • This share is currently suspended. It was suspended at a price of 2.85

Share Price Information for Rockpool Acqui (ROC)

Share Price is delayed by 15 minutes
Get Live Data
2.85    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £362.66k
ROC Live PriceLast checked at - London Stock Exchange

Intraday Rockpool Acqui Share Chart

Drilling Update

22 Aug 2006 07:00

Hardman Resources Limited22 August 2006 STOCK EXCHANGE / MEDIA RELEASE RELEASE DATE: 22 August 2006 AUSTRALIAN CONTACT: Simon Potter Hardman Resources Ltd +61 8 9261 7600 LONDON CONTACT: Patrick Handley Brunswick Group (UK media relations) +44 207 404 5959 RE: UGANDA FLOW TEST AND MAURITANIA DRILLING UPDATE Hardman Resources Limited ("Hardman") provides the following update on its flowtesting and exploration drilling operations: Uganda: Mputa-1 Flow Test Update (Block 2) Hardman has completed a successful testing campaign at the Mputa-1 discoverywell. Since our last announcement on 15 August, the upper sand interval has nowbeen tested on natural flow. Results from both zones tested are summarisedbelow: Test Perforated Interval Choke Flow Rate Oil Quality (metres) (bopd) o APILower Sand Zone (DST 2)1,118.0 - 1,126.0 32/64" 300 32Upper Sand Zone (DST 3)966.5 - 974.5 40/64" 820 33 TOTAL 1,120 The test results prove not only that the oil at Mputa is mobile, but also thatthe reservoir sands are capable of producing dry oil under natural flow atpotentially commercial rates. The latter aspect is particularly significant,given that the Mputa reservoirs are at shallower depth, and are hence at lowerpressure and temperature than the corresponding reservoir units at Waraga. Thispositive test result therefore expands the operating envelope over which typicalWaraga and Mputa crudes (32 degrees API) can be produced and eliminates pre-testconcerns over oil viscosity and fluid properties at these shallower depths. Although laboratory confirmation is still awaited, the gravity of all oil flowedat Mputa is similar to that found in the lower units of the Waraga-1 well and islikely to be of similar origin. The Mputa-1 well is located 220 kilometresnorthwest of the Ugandan capital Kampala and 8 kilometres from the shore of LakeAlbert. The Waraga-1 well is located 19 kilometres to the northeast of Mputa-1. This concludes the testing programme at Mputa-1. The well is presently beingsuspended and the rig and test crew are being stood down. Initial guidance onvolumes will be included in the company's Half Yearly Report on 29 August 2006. Hardman Resources Managing Director and CEO, Simon Potter, commented: "The positive test results from Mputa are particularly important given that wemap more oil in place in this resource than at Waraga. Natural flow from thereservoir at these pressures and temperatures are indicative that productionrates could potentially be commercial. Further, collectively the results to-dateindicate that oil from the source interval deep under the lake can migrate allthe way across the rift valley to the boundary fault and thus potentially overthe whole licence, considerably upgrading remaining prospectivity. The joint venture has presented potential forward options to the Government andis currently in discussions concerning the way forward on each of exploration,further appraisal and potential development concepts." Equities in Block 2 are: Block 2Hardman Petroleum Africa Pty Ltd (Operator) 50.0%Tullow Oil 50.0% Times and dates for Ugandan wells refer to Uganda time (GMT+3 hours), five hoursbehind Western Standard Time (Perth). Mauritania: Exploration Drilling Update - Flamant-1 (Block 8) Since the last report, Flamant-1 has drilled ahead in 26" hole to a depth of1,867m where the 20" casing was run and cemented. As at Midnight on the 21stAugust, preparations were underway to drill ahead in the 17 1/2" hole. Flamant-1 will target Cretaceous Carbonates and has a planned total depth3,370m. The well is located in 1414m of water, approximately 210km from theshore and 195 km North-West from Pelican-1, a Cretaceous gas discovery drilledin Block 7. Equities in Block 8 are: Block 8Dana Petroleum (Operator) 41.5%Hardman Resources Ltd 18.0%Roc Oil Company 2.0%Wintershall 25%Gaz de France 13.5% Times and dates for Mauritania wells refer to GMT (Mauritania time), 8 hoursbehind Western Standard Time, Perth. SIMON POTTERManaging Director and CEO Note: (1) In accordance with the ASX Listing Rules, the geological informationsupplied in this report has been based on information provided by geologists whohave had in excess of five years experience in their field of activity. (2) In accordance with the AIM Rules, the information in this report hasbeen reviewed and signed off by Mr Andrew Patterson, B Eng., Technical Manager at Hardman Resources, who is a member of the Petroleum Exploration Society of Australia and has at least 5 years relevant experience within the sector. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
4th May 20077:01 amRNSInvestor Presentation -May 07
4th May 20077:01 amRNSSubstantial ShareholderUpdate
1st May 20077:03 amRNSDrilling Update: Perth Basin
27th Apr 20077:02 amRNS1st Quarter Results
23rd Apr 20077:02 amRNSDrilling Update: Perth Basin
17th Apr 20072:09 pmRNSNotice of Change of Directors
17th Apr 20077:03 amRNSDrilling Update: Perth Basin
13th Apr 20074:30 pmRNSBlocklisting Interim Review
10th Apr 20078:00 amRNSSubstantial ShareholderNotice
10th Apr 20077:02 amRNSDrilling Update: Perth Basin
5th Apr 20077:01 amRNSDrilling Activity Update
5th Apr 20077:01 amRNSAnnual Report & Notice of AGM
27th Mar 20077:05 amRNSActivity Update
26th Mar 20077:03 amRNSNotice of Change of Directors
26th Mar 20077:03 amRNSWEBCAST - COO Interview
13th Mar 20079:57 amRNSCompletion of Acquisition
13th Mar 20077:03 amRNSDrilling Update: Western Aust
7th Mar 20077:03 amRNS2007 Annual General Meeting
28th Feb 20077:04 amRNSWEBCAST Financial Results
28th Feb 20077:04 amRNS06 Financial Results Summary
28th Feb 20077:04 amRNS2006 Annual Financial Report
27th Feb 20077:05 amRNSZhao Dong Development Project
23rd Feb 20077:03 amRNSNew Appointment
15th Feb 20077:02 amRNSDirector's Dealings
1st Feb 20077:02 amRNSWEBCAST - CEO Interview
31st Jan 20077:02 amRNS4th Quarter Activities Report
30th Jan 20077:02 amRNSDrilling Report
24th Jan 200711:22 amRNSMauritania Drilling Update
24th Jan 20077:01 amRNSMauritania-Chinguetti-18 Well
18th Jan 20078:50 amRNSUpdate - Angola
9th Jan 20077:01 amRNSMauritania Drilling Update
2nd Jan 20077:01 amRNSDrilling Report
13th Dec 20062:23 pmRNSHolding(s) in Company
11th Dec 20063:26 pmRNSRights Issue
11th Dec 20063:25 pmRNSDirector/PDMR Shareholding
11th Dec 20067:02 amRNSDirectors' Interests
11th Dec 20067:02 amRNSAllotment of Shares
5th Dec 20067:02 amRNSDrilling Update: Mauritania
5th Dec 20067:02 amRNSRights Issue Bookbuild
5th Dec 20067:00 amRNSMauritania Drilling Update
4th Dec 20067:02 amRNSClosing of Rights Issue
27th Nov 20067:02 amRNSExtension to RI Timetable
21st Nov 20067:02 amRNSDrilling Update: Mauritania
21st Nov 20067:00 amRNSMauritania Drilling Report
16th Nov 20067:02 amRNSCEO Interview
14th Nov 20067:04 amRNSDrilling Update: Mauritania
14th Nov 20067:00 amRNSHardman Drilling Programme
7th Nov 20067:02 amRNSOffshore Update - Mauritania
7th Nov 20067:00 amRNSHardman drilling programme
2nd Nov 20067:02 amRNSFurther Info re Rights Issue

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.