Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRockpool Acqui Regulatory News (ROC)

  • This share is currently suspended. It was suspended at a price of 2.85

Share Price Information for Rockpool Acqui (ROC)

Share Price is delayed by 15 minutes
Get Live Data
2.85    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.00 (0.00%)
Market Cap: £362.66k
ROC Live PriceLast checked at - London Stock Exchange

Intraday Rockpool Acqui Share Chart

Drilling Update

22 Aug 2006 07:00

Hardman Resources Limited22 August 2006 STOCK EXCHANGE / MEDIA RELEASE RELEASE DATE: 22 August 2006 AUSTRALIAN CONTACT: Simon Potter Hardman Resources Ltd +61 8 9261 7600 LONDON CONTACT: Patrick Handley Brunswick Group (UK media relations) +44 207 404 5959 RE: UGANDA FLOW TEST AND MAURITANIA DRILLING UPDATE Hardman Resources Limited ("Hardman") provides the following update on its flowtesting and exploration drilling operations: Uganda: Mputa-1 Flow Test Update (Block 2) Hardman has completed a successful testing campaign at the Mputa-1 discoverywell. Since our last announcement on 15 August, the upper sand interval has nowbeen tested on natural flow. Results from both zones tested are summarisedbelow: Test Perforated Interval Choke Flow Rate Oil Quality (metres) (bopd) o APILower Sand Zone (DST 2)1,118.0 - 1,126.0 32/64" 300 32Upper Sand Zone (DST 3)966.5 - 974.5 40/64" 820 33 TOTAL 1,120 The test results prove not only that the oil at Mputa is mobile, but also thatthe reservoir sands are capable of producing dry oil under natural flow atpotentially commercial rates. The latter aspect is particularly significant,given that the Mputa reservoirs are at shallower depth, and are hence at lowerpressure and temperature than the corresponding reservoir units at Waraga. Thispositive test result therefore expands the operating envelope over which typicalWaraga and Mputa crudes (32 degrees API) can be produced and eliminates pre-testconcerns over oil viscosity and fluid properties at these shallower depths. Although laboratory confirmation is still awaited, the gravity of all oil flowedat Mputa is similar to that found in the lower units of the Waraga-1 well and islikely to be of similar origin. The Mputa-1 well is located 220 kilometresnorthwest of the Ugandan capital Kampala and 8 kilometres from the shore of LakeAlbert. The Waraga-1 well is located 19 kilometres to the northeast of Mputa-1. This concludes the testing programme at Mputa-1. The well is presently beingsuspended and the rig and test crew are being stood down. Initial guidance onvolumes will be included in the company's Half Yearly Report on 29 August 2006. Hardman Resources Managing Director and CEO, Simon Potter, commented: "The positive test results from Mputa are particularly important given that wemap more oil in place in this resource than at Waraga. Natural flow from thereservoir at these pressures and temperatures are indicative that productionrates could potentially be commercial. Further, collectively the results to-dateindicate that oil from the source interval deep under the lake can migrate allthe way across the rift valley to the boundary fault and thus potentially overthe whole licence, considerably upgrading remaining prospectivity. The joint venture has presented potential forward options to the Government andis currently in discussions concerning the way forward on each of exploration,further appraisal and potential development concepts." Equities in Block 2 are: Block 2Hardman Petroleum Africa Pty Ltd (Operator) 50.0%Tullow Oil 50.0% Times and dates for Ugandan wells refer to Uganda time (GMT+3 hours), five hoursbehind Western Standard Time (Perth). Mauritania: Exploration Drilling Update - Flamant-1 (Block 8) Since the last report, Flamant-1 has drilled ahead in 26" hole to a depth of1,867m where the 20" casing was run and cemented. As at Midnight on the 21stAugust, preparations were underway to drill ahead in the 17 1/2" hole. Flamant-1 will target Cretaceous Carbonates and has a planned total depth3,370m. The well is located in 1414m of water, approximately 210km from theshore and 195 km North-West from Pelican-1, a Cretaceous gas discovery drilledin Block 7. Equities in Block 8 are: Block 8Dana Petroleum (Operator) 41.5%Hardman Resources Ltd 18.0%Roc Oil Company 2.0%Wintershall 25%Gaz de France 13.5% Times and dates for Mauritania wells refer to GMT (Mauritania time), 8 hoursbehind Western Standard Time, Perth. SIMON POTTERManaging Director and CEO Note: (1) In accordance with the ASX Listing Rules, the geological informationsupplied in this report has been based on information provided by geologists whohave had in excess of five years experience in their field of activity. (2) In accordance with the AIM Rules, the information in this report hasbeen reviewed and signed off by Mr Andrew Patterson, B Eng., Technical Manager at Hardman Resources, who is a member of the Petroleum Exploration Society of Australia and has at least 5 years relevant experience within the sector. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
22nd Jun 20057:01 amRNSMauritania Drilling Update
15th Jun 20057:00 amRNSActivity Update: China
3rd Jun 20057:00 amRNSArdmore Re-development Update
11th May 20057:02 amRNSResult of AGM
11th May 20057:02 amRNSCEO & Chairmans AGM Addresses
11th May 20057:02 amRNSFarmin to Jacala, WA
29th Apr 20057:01 amRNS1st Quarter Activities Report
14th Apr 20057:01 amRNSActivity Update - Angola
14th Apr 20057:01 amRNSPresentation to Shareholders
13th Apr 20057:01 amRNSAnnual Report and Accounts
13th Apr 20057:01 amRNSNotice of AGM
12th Apr 20057:01 amRNSRoc acquires Option
29th Mar 20057:01 amRNSDrilling Report
24th Mar 20057:02 amRNSDrilling Update: Hadda-1, WA
21st Mar 20057:03 amRNSBlock Admission Return
21st Mar 20057:03 amRNSOpen Briefing
17th Mar 20057:04 amRNSHadda-1 Commences Drilling
14th Mar 20057:01 amRNSDrilling Update: Cliff Head-6
14th Mar 20057:01 amRNSCliff Head Development
10th Mar 20057:01 amRNSDrilling Update: Cliff Head-6
7th Mar 20057:02 amRNSDrilling Update: Cliff Head-6
1st Mar 20057:03 amRNSMauritania Drilling Update
28th Feb 20057:03 amRNSROC's 2004 Financial Results
28th Feb 20057:03 amRNSDrilling Update: Cliff Head-6
25th Feb 20057:01 amRNSDrilling Update: Cliff Head-5
23rd Feb 20057:02 amRNSDrilling Activity Update
22nd Feb 20057:02 amRNSWeekly Progress Report
22nd Feb 20057:02 amRNSMauritania Drilling Update
21st Feb 20057:01 amRNSCliffHead 5 Drilling Commence
18th Feb 20057:02 amRNSSubstantial Shareholders
15th Feb 20057:01 amRNSMauritania Drilling Update
14th Feb 20057:01 amRNS2005 A$50M Drilling Programme
8th Feb 20057:02 amRNSMauritania Drilling Update
1st Feb 20057:01 amRNSMauritania Drilling Update
31st Jan 20057:01 amRNSQuarterly Report to 31 Dec 04
31st Jan 20057:01 amRNSUK Onshore Drilling Update
28th Jan 20057:01 amRNSROC places approx 10 shares
24th Jan 20057:00 amRNSSale of Saltfleetby Gas Field
24th Jan 20057:00 amRNSUK Onshore Drilling Update
24th Jan 20057:00 amRNSROC places approx 10M shares
20th Jan 20057:01 amRNSUpdate on Operations
18th Jan 20057:00 amRNSMauritania Offshore Drilling
17th Jan 20057:00 amRNSUK Onshore Drilling Update
13th Jan 20057:01 amRNSMauritania Offshore Update
11th Jan 20057:01 amRNSMauritania Offshore Update
11th Jan 20057:00 amRNSUK Onshore Drilling Report
4th Jan 20057:00 amRNSMauritania Offshore Drilling
4th Jan 20057:00 amRNSUK Onshore Drilling Update
4th Jan 20057:00 amRNSMauritania Drilling Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.