Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRMM.L Regulatory News (RMM)

  • There is currently no data for RMM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Rambler Provides Positive Update

9 Sep 2014 12:30

RNS Number : 1794R
Rambler Metals & Mining PLC
09 September 2014
 



9 September 2014

 

Rambler Provides Positive Update on Company's Core Internal

Growth Project and Further Support from RDC

 

London, England & Baie Verte, Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ('Rambler' or the 'Company'), a copper and gold producer operating in Newfoundland and Labrador, Canada, today announces that, in conjunction with support from the Research & Development Corporation of Newfoundland and Labrador ('RDC'), the group will complete the final phase of test work to determine the operating parameters of pre-concentrating mineralized material from the Lower Footwall Zone ('LFZ') of the Company's operating Ming Mine through dense media separation ('DMS').

 

The economic viability of the LFZ, which has a measured and indicated resource estimate of 18.2 million tonnes grading 1.43 per cent copper, was first demonstrated in April 2012 through a Preliminary Economic Analysis ('PEA'). (See Company press release 30 April 2012)

 

In an effort to reduce the capital and operating costs associated with the LFZ as per the PEA, Rambler has been investigating cost-saving ore pre-concentration techniques that could significantly reduce material handling requirements and potentially enable the use of the Company's fully permitted and operating Nugget Pond Processing Facility in lieu of building a new stand-alone copper concentrator as was envisioned in the PEA.

 

The mineralization of the Lower Footwall Zone is characteristically different in that it consists of heavy lower grade copper rich stringer sulphides hosted within a lighter weight chlorite schist. The initial phase of bench scale and mini-pilot process, developed with the assistance of RDC funding, has revealed that physical separation of the heavier from the lighter rock using DMS is possible. Effectively, the DMS process will increase the grade of copper in the LFZ by removing 30 per cent to 40 per cent of the lighter waste host rock with copper recoveries averaging 95 per cent. In terms of grade improvement, the mini-pilot using run of mine material from the LFZ grading 1.39 per cent copper returned a pre-concentrate grade of 2.27 per cent copper (an upgrade ratio of 1.63).

 

As a continuation of RDC's previously successful DMS test work with Thibault and Associates Inc., the group is planning to implement an on-site demonstration DMS plant to scale-up the process and prove the technology for its application. Once the technology demonstration is complete and operating parameters are optimized, this project will serve as the basis of a pre-feasibility study with the goal of moving the LFZ resources into the mine reserve.

 

RDC's initial contribution of $250,000 in 2013 helped provide the groundwork for the on-site demonstration plant program scheduled for this fall, for which RDC has again provided support with an additional $750,000 investment.

 

 

Glenn Janes, Chief Executive Officer of RDC, commented,

"The use of a proven technology for this new application has tremendous potential. The possibility of adding years to the life of the mine has immense implications on the prospective long term economic benefit to the region, and on the mining industry in Newfoundland and Labrador."

Norman Williams, President and CEO of Rambler Metals and Mining, commented,

"Since the initial release of the LFZ Preliminary Economic Assessment in 2012 the group has been engaged in various optimization studies focused directly on reducing the capital requirements of a potential expansion into the sizeable LFZ resource, while better utilizing the existing infrastructure at the mine and mill sites.

"I am pleased to report that the group is on track to begin the demonstration plant project over the coming months, with results expected in the first half of calendar 2015.

"The pre-concentrate produced from the demonstration plant, approximately 200 metric tonnes per day, will be processed on top of the existing planned production presented in the fiscal guidance. A new two-stage crushing unit has been purchased which, in addition to providing various feed sizes for the DMS project, will be incorporated into the existing operation with an aim to further increase mill throughput.

"A full review of the possible increases in production will be evaluated following the completion of the DMS project."

 

RDC works with research and development stakeholders including business, academia and government agencies to make strategic investments in people, R&D opportunities, and infrastructure. Additional information on RDC can be found at: www.rdc.org.

 

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development Company that in November 2012 brought its first mine into commercial production. The group has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

The Company's Vision is to be Atlantic Canada's leading mine operator and resource developer through growth and expansion of its existing assets; discovering new deposits; strategic partnerships; mergers and acquisitions. In addition to the Ming Mine, Rambler has strategic investments in the former producing Hammerdown gold mine, Little Deer-Whales Back copper mines and the advanced Valentine Lake Gold Project.

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RMM.

 

 

For further information, please contact:

 

Norman Williams

President and CEO

Rambler Metals and Mining

Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Vice President and Corporate Secretary

Rambler Metals & Mining Plc

Corporate Office Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

Stewart Dickson / Jeremy Stephenson

Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Tim Blythe/Halimah Hussain

Blytheweigh

Tel No: +44 (0) 20 7138 3204

 

Website: www.ramblermines.com

 

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

 

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQKCDQCBKKDCK
Date   Source Headline
31st Aug 20213:09 pmRNSTotal Voting Rights
27th Aug 20216:03 pmRNSHolding(s) in Company
26th Aug 20213:40 pmRNSIssue of Equity
26th Aug 20213:09 pmRNSTechnical Report for the Little Deer Complex
25th Aug 20217:00 amRNSMing Mine Drilling Update
18th Aug 20213:08 pmRNSResult of General Meeting
18th Aug 202112:08 pmRNSIssue of Equity
18th Aug 202112:02 pmRNSPlacing and Subscription to raise £1.87 million
9th Aug 20215:09 pmRNSDrawdown of Convertible Note Financing
2nd Aug 20217:00 amRNSMing Mine Update
30th Jul 20216:30 pmRNSPosting of Circular and Notice of General Meeting
30th Jul 202112:19 pmRNSIssue of Shares and Total Voting Rights
27th Jul 20217:00 amRNSIssue of Equity
26th Jul 20212:29 pmRNSHolding(s) in Company
23rd Jul 202112:55 pmRNSInvestor Presentation
22nd Jul 20213:52 pmRNSRambler Announces Production Results for Q2/H121
20th Jul 20213:54 pmRNSHolding(s) in Company
12th Jul 20217:10 amRNSRambler Upgrades Mineral Resource for Little Deer
9th Jul 20214:45 pmRNSEarly Exercise of Warrants and TVR
6th Jul 202111:40 amRNSIssue of Equity
2nd Jul 20213:31 pmRNSRestricted Share Units and Ordinary Shares
1st Jul 20217:00 amRNSCompletion of Convertible Note Financing
30th Jun 20217:00 amRNSFinancing and Operations Update
28th Jun 202111:05 amRNSSecond Price Monitoring Extn
28th Jun 202111:00 amRNSPrice Monitoring Extension
28th May 20217:00 amRNSTotal Voting Rights
26th May 202112:48 pmRNSResult of AGM
26th May 20217:00 amRNSRambler Updates Mineral Resources for Ming Mine
7th May 20219:05 amRNSSecond Price Monitoring Extn
7th May 20219:00 amRNSPrice Monitoring Extension
7th May 20217:00 amRNSRambler Q1 2021 Performance and Outlook
30th Apr 20213:26 pmRNSIssue of Shares and Total Voting Rights
30th Apr 20217:00 amRNSPosting of Annual Report and Notice of AGM
27th Apr 20217:01 amRNSBlock Admission
27th Apr 20217:00 amRNSFinancial Results for Year Ended 31 December 2020
26th Apr 202111:57 amRNSExercise of Warrants and Total Voting Rights
21st Apr 20211:30 pmRNSExercise of Warrants and Total Voting Rights
20th Apr 202111:05 amRNSSecond Price Monitoring Extn
20th Apr 202111:00 amRNSPrice Monitoring Extension
20th Apr 20219:00 amRNSPrice Monitoring Extension
14th Apr 20214:40 pmRNSSecond Price Monitoring Extn
14th Apr 20214:35 pmRNSPrice Monitoring Extension
13th Apr 20217:00 amRNSRambler closes Asset Sale Agreement with Maritime
12th Apr 20212:29 pmRNSHolding(s) in Company
12th Apr 20217:00 amRNSExercise of Warrants and Total Voting Rights
31st Mar 20217:00 amRNSTotal Voting Rights
22nd Mar 20217:00 amRNSExercise of Warrants and Total Voting Rights
26th Feb 20219:03 amRNSTotal Voting Rights
22nd Feb 20217:30 amRNSHolding(s) in Company
22nd Feb 20217:30 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.