focusIR May 2024 Investor Webinar: Blue Whale, Kavango, Taseko Mines & CQS Natural Resources. Catch up with the webinar here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRMM.L Regulatory News (RMM)

  • There is currently no data for RMM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Rambler Provides Positive Update

9 Sep 2014 12:30

RNS Number : 1794R
Rambler Metals & Mining PLC
09 September 2014
 



9 September 2014

 

Rambler Provides Positive Update on Company's Core Internal

Growth Project and Further Support from RDC

 

London, England & Baie Verte, Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ('Rambler' or the 'Company'), a copper and gold producer operating in Newfoundland and Labrador, Canada, today announces that, in conjunction with support from the Research & Development Corporation of Newfoundland and Labrador ('RDC'), the group will complete the final phase of test work to determine the operating parameters of pre-concentrating mineralized material from the Lower Footwall Zone ('LFZ') of the Company's operating Ming Mine through dense media separation ('DMS').

 

The economic viability of the LFZ, which has a measured and indicated resource estimate of 18.2 million tonnes grading 1.43 per cent copper, was first demonstrated in April 2012 through a Preliminary Economic Analysis ('PEA'). (See Company press release 30 April 2012)

 

In an effort to reduce the capital and operating costs associated with the LFZ as per the PEA, Rambler has been investigating cost-saving ore pre-concentration techniques that could significantly reduce material handling requirements and potentially enable the use of the Company's fully permitted and operating Nugget Pond Processing Facility in lieu of building a new stand-alone copper concentrator as was envisioned in the PEA.

 

The mineralization of the Lower Footwall Zone is characteristically different in that it consists of heavy lower grade copper rich stringer sulphides hosted within a lighter weight chlorite schist. The initial phase of bench scale and mini-pilot process, developed with the assistance of RDC funding, has revealed that physical separation of the heavier from the lighter rock using DMS is possible. Effectively, the DMS process will increase the grade of copper in the LFZ by removing 30 per cent to 40 per cent of the lighter waste host rock with copper recoveries averaging 95 per cent. In terms of grade improvement, the mini-pilot using run of mine material from the LFZ grading 1.39 per cent copper returned a pre-concentrate grade of 2.27 per cent copper (an upgrade ratio of 1.63).

 

As a continuation of RDC's previously successful DMS test work with Thibault and Associates Inc., the group is planning to implement an on-site demonstration DMS plant to scale-up the process and prove the technology for its application. Once the technology demonstration is complete and operating parameters are optimized, this project will serve as the basis of a pre-feasibility study with the goal of moving the LFZ resources into the mine reserve.

 

RDC's initial contribution of $250,000 in 2013 helped provide the groundwork for the on-site demonstration plant program scheduled for this fall, for which RDC has again provided support with an additional $750,000 investment.

 

 

Glenn Janes, Chief Executive Officer of RDC, commented,

"The use of a proven technology for this new application has tremendous potential. The possibility of adding years to the life of the mine has immense implications on the prospective long term economic benefit to the region, and on the mining industry in Newfoundland and Labrador."

Norman Williams, President and CEO of Rambler Metals and Mining, commented,

"Since the initial release of the LFZ Preliminary Economic Assessment in 2012 the group has been engaged in various optimization studies focused directly on reducing the capital requirements of a potential expansion into the sizeable LFZ resource, while better utilizing the existing infrastructure at the mine and mill sites.

"I am pleased to report that the group is on track to begin the demonstration plant project over the coming months, with results expected in the first half of calendar 2015.

"The pre-concentrate produced from the demonstration plant, approximately 200 metric tonnes per day, will be processed on top of the existing planned production presented in the fiscal guidance. A new two-stage crushing unit has been purchased which, in addition to providing various feed sizes for the DMS project, will be incorporated into the existing operation with an aim to further increase mill throughput.

"A full review of the possible increases in production will be evaluated following the completion of the DMS project."

 

RDC works with research and development stakeholders including business, academia and government agencies to make strategic investments in people, R&D opportunities, and infrastructure. Additional information on RDC can be found at: www.rdc.org.

 

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development Company that in November 2012 brought its first mine into commercial production. The group has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

The Company's Vision is to be Atlantic Canada's leading mine operator and resource developer through growth and expansion of its existing assets; discovering new deposits; strategic partnerships; mergers and acquisitions. In addition to the Ming Mine, Rambler has strategic investments in the former producing Hammerdown gold mine, Little Deer-Whales Back copper mines and the advanced Valentine Lake Gold Project.

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RMM.

 

 

For further information, please contact:

 

Norman Williams

President and CEO

Rambler Metals and Mining

Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Vice President and Corporate Secretary

Rambler Metals & Mining Plc

Corporate Office Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

Stewart Dickson / Jeremy Stephenson

Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Tim Blythe/Halimah Hussain

Blytheweigh

Tel No: +44 (0) 20 7138 3204

 

Website: www.ramblermines.com

 

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

 

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCQKCDQCBKKDCK
Date   Source Headline
18th Jan 202210:56 amRNSOperational Results and Activities for Q4 2021
13th Jan 202212:35 pmRNSNew High-Grade Mineralization
4th Jan 20224:41 pmRNSSecond Price Monitoring Extn
4th Jan 20224:37 pmRNSPrice Monitoring Extension
4th Jan 20222:28 pmRNSOperations Update
31st Dec 20217:00 amRNSTotal Voting Rights
30th Dec 20217:00 amRNSHolding(s) in Company
23rd Dec 20212:33 pmRNSResult of General Meeting
21st Dec 20217:01 amRNSHolding(s) in Company
21st Dec 20217:00 amRNSHolding(s) in Company
21st Dec 20217:00 amRNSMineral Resource and Operations Update
9th Dec 20217:00 amRNSHolding(s) in Company
8th Dec 20217:00 amRNSHolding(s) in Company
8th Dec 20217:00 amRNSHolding(s) in Company
8th Dec 20217:00 amRNSHolding(s) in Company
7th Dec 20217:00 amRNSPosting of Circular and Notice of General Meeting
2nd Dec 20217:00 amRNSClosing of Debt and Equity Financing
30th Nov 20217:00 amRNSTotal Voting Rights
17th Nov 20212:00 pmRNSInvestor Presentation
17th Nov 20217:00 amRNSRambler Continues to Intersect High Grade Copper
15th Nov 20219:05 amRNSSecond Price Monitoring Extn
15th Nov 20219:00 amRNSPrice Monitoring Extension
15th Nov 20217:00 amRNSProduction Ramp-up in October 2021 & Investor Call
2nd Nov 20217:00 amRNSGrant of Options
1st Nov 20214:53 pmRNSResignation of Director
1st Nov 20214:17 pmRNSRepayment of Convertible Loan
1st Nov 202111:06 amRNSSecond Price Monitoring Extn
1st Nov 202111:00 amRNSPrice Monitoring Extension
29th Oct 20216:26 pmRNSFinancial Results for Half Year ended June 30,2021
29th Oct 20216:13 pmRNSClosing of Debt Financing
29th Oct 20217:00 amRNSTotal Voting Rights
27th Oct 202111:46 amRNSBlock Listing Six Monthly Return
21st Oct 20218:36 amRNSIssue of Equity
19th Oct 202112:08 pmRNSIssue of Equity
19th Oct 20219:05 amRNSSecond Price Monitoring Extn
19th Oct 20219:00 amRNSPrice Monitoring Extension
19th Oct 20217:00 amRNSDrill Holes In Excess of 20m of +2% Copper
14th Oct 20212:26 pmRNSIssue of Equity
14th Oct 20217:00 amRNSIssue of Equity
13th Oct 202111:05 amRNSSecond Price Monitoring Extn
13th Oct 202111:00 amRNSPrice Monitoring Extension
13th Oct 20217:00 amRNSBridge Loan Financing
8th Oct 20211:11 pmRNSOperational Results and Activities for Q3 2021
1st Oct 20217:00 amRNSUpdate on Financing
30th Sep 20217:00 amRNSTotal Voting Rights
29th Sep 20212:39 pmRNSIssue of Equity
28th Sep 20217:00 amRNSInterim Results Reporting Timeline
27th Sep 20217:00 amRNSRambler Provides Update Statement on Covid-19
22nd Sep 20212:48 pmRNSRambler Provides Statement on Covid-19
31st Aug 20214:56 pmRNSProgress Update on Debt Financing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.