Cobus Loots, CEO of Pan African Resources, on delivering sector-leading returns for shareholders. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRainbow Rare Earths Regulatory News (RBW)

Share Price Information for Rainbow Rare Earths (RBW)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 10.65
Bid: 10.30
Ask: 11.00
Change: -0.10 (-0.93%)
Spread: 0.70 (6.796%)
Open: 10.75
High: 10.75
Low: 10.65
Prev. Close: 10.75
RBW Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Gakara feasibility Study

23 Feb 2021 07:00

RNS Number : 9315P
Rainbow Rare Earths Limited
23 February 2021
 

Rainbow Rare Earths Limited

("Rainbow" or the "Company")

(LSE: RBW)

23 February 2021

 

Feasibility of 10,000tpa Gakara Down-Stream Processing Plant Confirmed

 

Rainbow Rare Earths Ltd is pleased to provide an update on the feasibility of a processing facility to produce a high-purity cerium-depleted mixed rare earth carbonate from the Company's Gakara Rare Earths Project ("Gakara").

Metallurgical Engineering Technology and Construction (Pty) Ltd ("METC") was engaged by Rainbow to re-validate and update a preliminary economic assessment ("PEA") conducted in 2015 by SGS Lakefield Canada Inc ("SGS"), providing an optimised scoping study ("the study").

Highlights

· The study has confirmed the feasibility of a 10,000tpa rare earths element ("REE") cracking plant (the "plant"), doubling its capacity from 5,000tpa, originally proposed in the SGS PEA, based on the Strong Acid Agitated Bake ("SAAB") process developed from the test work completed by SGS;

· METC optimised the process, incorporating newer technologies, to deliver a flowsheet capable of producing a high-grade cerium-depleted mixed rare earth carbonate, containing approximately 39% neodymium and praseodymium ("NdPr"), the critical input materials for permanent magnets required for electric vehicle ("EV") and wind turbine technology;

· The 2020 capital cost of US$35.2 million, estimated by METC, for a 10,000tpa plant (US$3,522 per tpa) compares favourably to the SGS 2015 estimate of US$22.3 million for a 5,000tpa plant (US$4,456 per tpa). The operating cost estimate produced by METC is US$1,279/t, compared to the original SGS estimate of US$1,654/t. This represents a 21% reduction in capital intensity and 23% in operating cost, providing an expected resilience to the project economics, even in the event of a volatile pricing environment; and

· The proposed plant location in South Africa would provide strong synergies with Rainbow's other rare earths project at Phalaborwa, contribute to the local economy and facilitate a sustainable, transparent rare earths supply chain.

 

George Bennett, CEO, said: "The validation of the feasibility of a 10,000tpa down-stream processing plant provides Rainbow with the opportunity to deliver a significantly higher share of the total contained metal value of the Gakara project for our shareholders. The estimated capital and operating costs of this plant would likely be some of the lowest in the industry and therefore viable even in the event of volatile rare earths prices. This confirms our belief that Gakara has the potential be a low capital intensity project.

Dave Dodd, Rainbow's Technical Director, commented: "The ability to produce a high-purity NdPr-rich, cerium-depleted, mixed rare earth carbonate product at low capital and operating costs demonstrates the potential of the robust, long-term economics of our Gakara project.

We already operate Africa's only producing rare earths operation at Gakara, via the current trial mining operations, which employ a simple, reagent-free, low capital and operating cost gravity concentration process. By further processing the concentrate, we have the potential to participate in a greater proportion of the value chain, producing the rare earth elements required to accelerate the global green energy transition. These factors combined serve to further strengthen our determination to confidently progress through to commercial scale production at Gakara."

 

SGS originally successfully tested five process routes and developed a flowsheet based on a SAAB process to produce a cerium-depleted mixed rare earth carbonate from a 5,000tpa plant with a capital cost of US$23 million.

In December 2020, METC updated and optimised the scoping study, by reviewing and analysing the process design criteria from the SGS PEA. As a result, METC upgraded the processing capacity of the rare earths elements cracking plant from the originally proposed 5,000tpa to 10,000tpa. Based on the work carried out to date, the plant demonstrates low capital intensity of US$35.2 million and operating costs of US$1,279/t.

By integrating the downstream processing of the Gakara rare earths concentrate into a cerium-depleted mixed rare earths carbonate into Rainbow's business model, the Company has the potential to participate in a larger segment of the overall value chain.

The study identified South Africa as an optimal location for the processing plant. This would facilitate significant synergies for the Company, given the location of its Phalaborwa Rare Earths Project, near Pretoria in South Africa. By locating the processing plant within the industrial hub of Johannesburg, the study confirmed that Rainbow would realise cost efficiencies in the areas of reagents, power and transport. Whilst power consumption is not expected constitute a significant proportion of the overall operating costs, the use of renewable energy would be considered, in line with Rainbow's commitments as an environmentally responsible producer.

 

**ENDS**

For further information, please contact

Rainbow Rare Earths Ltd

Company

George Bennett

Pete Gardner

+27 82 652 8526

 

SP Angel Corporate Finance LLP

Broker

Ewan Leggat

Charlie Bouverat

+44 (0) 20 3470 0470

Flagstaff Strategic and Investor Communications

 

Tim Thompson

Fergus Mellon

+44 (0) 207 129 1474

rainbowrareearths@flagstaffcomms.com

 

Notes to Editors:

Rainbow's strategy is to become a globally-significant producer of rare earth metals. NdPr are vital components of the strongest permanent magnets used for the motors and turbines driving the green technology revolution. Analysts are predicting demand for magnet rare earth oxides will grow substantially over the coming years, driven by increasing adoption of green technology, pushing the overall market for NdPr into deficit.

The Company's Gakara Project in Burundi, which produces one of the highest-grade concentrates in the world (typically 54% total rare earths oxides ("TREO")) through ongoing trial mining operations, is currently the only African producer of rare earths. The Gakara basket is weighted heavily towards NdPr, which account for over approximately 19.5% of the contained TREO and 85% of the value of the concentrate.

The Phalaborwa Rare Earths Project, located in South Africa, comprises approximately 35 million tonnes of gypsum tailings stacked in unconsolidated dumps derived from historic phosphate hard rock mining, containing rare earth elements with an initial estimated average in situ grade of 0.6% TREO, based on previous sampling campaigns, of which +/- 30% comprises high-value NdPr. The rare earths are contained in chemical form in the gypsum dumps, which is expected to deliver a higher-value rare earth carbonate, with lower operating costs than a typical rare earth mineral project.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSELFLEEFSEFE
Date   Source Headline
1st Nov 20227:00 amRNSDirector/PDMR Shareholding
27th Oct 20227:00 amRNSPublication of Annual Report & Notice of AGM
24th Oct 20227:00 amRNSPreliminary results for year-end 30 June 2022
3rd Oct 20227:00 amRNSPEA Confirms Robust Economics for Phalaborwa
30th Sep 202211:45 amRNSLondon South East Investor Webinar
30th Sep 20227:00 amRNSAppointment of Berenberg as Joint Corporate Broker
23rd Aug 20227:00 amRNSTechnical Report on Phalaborwa Process Flow Sheet
22nd Aug 20227:00 amRNSRainbow enters Rare Earths Extraction Agreement
16th Aug 20227:00 amRNSEuropean Raw Material Alliance Membership
7th Jul 20221:00 pmRNSNotice of Investor Presentation
28th Jun 20227:00 amRNSSuccessful Development of Extraction Flowsheet
6th Jun 20227:00 amRNSAccess to Rare Earth Opportunity in South Africa
29th Apr 20227:00 amRNSExercise of Share Options
1st Apr 202212:13 pmRNSChanges to Secretary, Registered Agent & Office
30th Mar 20227:00 amRNSRainbow Launches New Corporate Website
17th Mar 20227:06 amRNSInterim Results for six months to 31 December 2021
4th Mar 20224:40 pmRNSSecond Price Monitoring Extn
4th Mar 20224:35 pmRNSPrice Monitoring Extension
8th Feb 20227:00 amRNSPhalaborwa Test Work Update & Process Flow Sheet
3rd Feb 20227:00 amRNSIssue of Share Options
20th Jan 20221:00 pmRNSRetirement of Non Executive Director
19th Jan 20227:00 amRNSRainbow’s 70% share in Phalaborwa confirmed
23rd Dec 20213:42 pmRNSCorrection re Issue of Shares
23rd Dec 20217:00 amRNSIssue of Shares Pipestone Capital Inc Loan
1st Dec 20217:00 amRNSCOP 26 Resolutions
19th Nov 202110:27 amRNSIssue of Shares to TechMet
18th Nov 20217:00 amRNSResults of AGM
29th Oct 20217:00 amRNSPublication of ARA and notice of AGM
28th Oct 20217:00 amRNSPreliminary Results for year ended 30 June 2021
14th Oct 20217:00 amRNSInvestor Presentation
13th Oct 20217:00 amRNSPlacing raises £6.435 million at 15p per share
20th Sep 20217:00 amRNSRare Earths Separation Technology Agreement
9th Aug 20217:00 amRNSDirector Dealing
5th Aug 20219:56 amRNSMarket Update
29th Jul 20217:00 amRNSPhalaborwa PEA
19th Jul 20217:00 amRNSDirector Shareholding
16th Jul 20217:00 amRNSReported civil unrest in South Africa
14th Jul 20217:00 amRNSExercise of Share Options
7th Jul 20217:00 amRNSGrant of Share Options
29th Jun 20214:14 pmRNSMarket Update
25th Jun 20217:00 amRNSIssue of consideration shares for Phalaborwa
17th Jun 20212:05 pmRNSSecond Price Monitoring Extn
17th Jun 20212:00 pmRNSPrice Monitoring Extension
17th Jun 20217:00 amRNSResource Estimate for Phalaborwa Project
24th May 20219:05 amRNSSecond Price Monitoring Extn
24th May 20219:00 amRNSPrice Monitoring Extension
24th May 20217:00 amRNSInitial Metallurgical results for Phalaborwa
17th May 20217:00 amRNSAppointment of Non Executive Director
28th Apr 20217:00 amRNSPhalaborwa Positive Assay Results
15th Apr 20219:05 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.