Gakara feasibility Study

23 Feb 2021 07:00

RNS Number : 9315P
Rainbow Rare Earths Limited
23 February 2021
 

Rainbow Rare Earths Limited

("Rainbow" or the "Company")

(LSE: RBW)

23 February 2021

 

Feasibility of 10,000tpa Gakara Down-Stream Processing Plant Confirmed

 

Rainbow Rare Earths Ltd is pleased to provide an update on the feasibility of a processing facility to produce a high-purity cerium-depleted mixed rare earth carbonate from the Company's Gakara Rare Earths Project ("Gakara").

Metallurgical Engineering Technology and Construction (Pty) Ltd ("METC") was engaged by Rainbow to re-validate and update a preliminary economic assessment ("PEA") conducted in 2015 by SGS Lakefield Canada Inc ("SGS"), providing an optimised scoping study ("the study").

Highlights

· The study has confirmed the feasibility of a 10,000tpa rare earths element ("REE") cracking plant (the "plant"), doubling its capacity from 5,000tpa, originally proposed in the SGS PEA, based on the Strong Acid Agitated Bake ("SAAB") process developed from the test work completed by SGS;

· METC optimised the process, incorporating newer technologies, to deliver a flowsheet capable of producing a high-grade cerium-depleted mixed rare earth carbonate, containing approximately 39% neodymium and praseodymium ("NdPr"), the critical input materials for permanent magnets required for electric vehicle ("EV") and wind turbine technology;

· The 2020 capital cost of US$35.2 million, estimated by METC, for a 10,000tpa plant (US$3,522 per tpa) compares favourably to the SGS 2015 estimate of US$22.3 million for a 5,000tpa plant (US$4,456 per tpa). The operating cost estimate produced by METC is US$1,279/t, compared to the original SGS estimate of US$1,654/t. This represents a 21% reduction in capital intensity and 23% in operating cost, providing an expected resilience to the project economics, even in the event of a volatile pricing environment; and

· The proposed plant location in South Africa would provide strong synergies with Rainbow's other rare earths project at Phalaborwa, contribute to the local economy and facilitate a sustainable, transparent rare earths supply chain.

 

George Bennett, CEO, said: "The validation of the feasibility of a 10,000tpa down-stream processing plant provides Rainbow with the opportunity to deliver a significantly higher share of the total contained metal value of the Gakara project for our shareholders. The estimated capital and operating costs of this plant would likely be some of the lowest in the industry and therefore viable even in the event of volatile rare earths prices. This confirms our belief that Gakara has the potential be a low capital intensity project.

Dave Dodd, Rainbow's Technical Director, commented: "The ability to produce a high-purity NdPr-rich, cerium-depleted, mixed rare earth carbonate product at low capital and operating costs demonstrates the potential of the robust, long-term economics of our Gakara project.

We already operate Africa's only producing rare earths operation at Gakara, via the current trial mining operations, which employ a simple, reagent-free, low capital and operating cost gravity concentration process. By further processing the concentrate, we have the potential to participate in a greater proportion of the value chain, producing the rare earth elements required to accelerate the global green energy transition. These factors combined serve to further strengthen our determination to confidently progress through to commercial scale production at Gakara."

 

SGS originally successfully tested five process routes and developed a flowsheet based on a SAAB process to produce a cerium-depleted mixed rare earth carbonate from a 5,000tpa plant with a capital cost of US$23 million.

In December 2020, METC updated and optimised the scoping study, by reviewing and analysing the process design criteria from the SGS PEA. As a result, METC upgraded the processing capacity of the rare earths elements cracking plant from the originally proposed 5,000tpa to 10,000tpa. Based on the work carried out to date, the plant demonstrates low capital intensity of US$35.2 million and operating costs of US$1,279/t.

By integrating the downstream processing of the Gakara rare earths concentrate into a cerium-depleted mixed rare earths carbonate into Rainbow's business model, the Company has the potential to participate in a larger segment of the overall value chain.

The study identified South Africa as an optimal location for the processing plant. This would facilitate significant synergies for the Company, given the location of its Phalaborwa Rare Earths Project, near Pretoria in South Africa. By locating the processing plant within the industrial hub of Johannesburg, the study confirmed that Rainbow would realise cost efficiencies in the areas of reagents, power and transport. Whilst power consumption is not expected constitute a significant proportion of the overall operating costs, the use of renewable energy would be considered, in line with Rainbow's commitments as an environmentally responsible producer.

 

**ENDS**

For further information, please contact

Rainbow Rare Earths Ltd

Company

George Bennett

Pete Gardner

+27 82 652 8526

 

SP Angel Corporate Finance LLP

Broker

Ewan Leggat

Charlie Bouverat

+44 (0) 20 3470 0470

Flagstaff Strategic and Investor Communications

 

Tim Thompson

Fergus Mellon

+44 (0) 207 129 1474

rainbowrareearths@flagstaffcomms.com

 

Notes to Editors:

Rainbow's strategy is to become a globally-significant producer of rare earth metals. NdPr are vital components of the strongest permanent magnets used for the motors and turbines driving the green technology revolution. Analysts are predicting demand for magnet rare earth oxides will grow substantially over the coming years, driven by increasing adoption of green technology, pushing the overall market for NdPr into deficit.

The Company's Gakara Project in Burundi, which produces one of the highest-grade concentrates in the world (typically 54% total rare earths oxides ("TREO")) through ongoing trial mining operations, is currently the only African producer of rare earths. The Gakara basket is weighted heavily towards NdPr, which account for over approximately 19.5% of the contained TREO and 85% of the value of the concentrate.

The Phalaborwa Rare Earths Project, located in South Africa, comprises approximately 35 million tonnes of gypsum tailings stacked in unconsolidated dumps derived from historic phosphate hard rock mining, containing rare earth elements with an initial estimated average in situ grade of 0.6% TREO, based on previous sampling campaigns, of which +/- 30% comprises high-value NdPr. The rare earths are contained in chemical form in the gypsum dumps, which is expected to deliver a higher-value rare earth carbonate, with lower operating costs than a typical rare earth mineral project.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDSELFLEEFSEFE
Date   Source Headline
5th May 20267:00 amRNSEvaluation of a Listing in the USA
31st Mar 20267:15 amRNSInterim Results for six months to 31 December 2025
31st Mar 20267:00 amRNSSubscription raises £11.1m from investors
17th Mar 20267:00 amRNS-RPublication of New Investor Presentation
17th Mar 20267:00 amRNS-RPublication of New Investor Presentation
11th Mar 20267:00 amRNSMosaic Agreement and Uberaba Economic Assessment
11th Mar 20267:00 amRNSMosaic Agreement and Uberaba Economic Assessment
9th Feb 20267:00 amRNSPilot Plant Producing Commercial Mixed REE Product
14th Jan 20265:35 pmRNSPDMR Shareholding
13th Jan 20267:00 amRNSPilot Plant Commences Operations in Johannesburg
25th Nov 20257:00 amRNSSX Adoption Yields 99.5% Pure Rare Earth Products
24th Nov 20257:00 amRNSYttrium Price Surge Improves Phalaborwa Economics
12th Nov 20259:38 amRNSResults of Annual General Meeting
10th Nov 20257:00 amRNSPhalaborwa Resource Update to include Yttrium
27th Oct 20258:13 amRNSPublication of Annual Report and Notice of AGM
27th Oct 20257:00 amRNSPreliminary Results for Year-end 30 June 2025
22nd Sep 20257:00 amRNSFurther Major Advancement in Phalaborwa Test Work
1st Sep 20257:00 amRNSCIX Test Work shows Very High Purity Separation
4th Jul 20257:00 amRNSIssue of Shares to Directors under Incentive Plan
17th Jun 20257:00 amRNSEconomic Assessment for Uberaba Project in Brazil
3rd Jun 20257:00 amRNSUpdate on Laboratory Test Work in South Africa
29th May 20257:00 amRNS-RCollaboration with Curation Connect
21st May 20257:00 amRNS-RRainbow joins the Rare Earth Industry Association
19th Mar 20257:00 amRNSInterim Results for 6 Months to 31 December 2024
16th Dec 20247:00 amRNSInterim Study confirms Phalaborwa viability
7th Nov 20243:15 pmRNSResult of AGM
6th Nov 20247:00 amRNSDirector/PDMR Shareholding
23rd Oct 20249:00 amRNSPublication of Annual Report and Notice of AGM
18th Oct 20247:00 amRNSPreliminary Results for Year-end 30 June 2024
25th Sep 20247:00 amRNSCompletion of Ecora Royalty Transaction
18th Sep 20247:00 amRNSPhalaborwa Update
11th Sep 20247:00 amRNSUpdated Mineral Resource Estimate for Phalaborwa
3rd Sep 20247:00 amRNSGrant of Share Based Remuneration
1st Jul 20247:00 amRNSRoyalty Agreement with Ecora & US$10m raise
19th Jun 20247:00 amRNSPilot Plant Update
18th Apr 20243:50 pmRNSDirector/PDMR Shareholding
16th Apr 20247:00 amRNSPositive Initial Leaching and Mineralogy Results
28th Mar 20247:00 amRNSInterim Results
20th Mar 202411:37 amRNSPublication of Conference Presentation
26th Feb 20247:00 amRNSResource Update
5th Feb 20247:00 amRNSUpdate on Rare Earth Oxide Separation Progress
31st Jan 20247:00 amRNSPublication of Site Visit Presentation
18th Jan 20247:24 amRNSUS Congressional Delegation hosted at Phalaborwa
16th Jan 20247:00 amRNSAppointment of Stifel as Joint Broker
11th Jan 20247:00 amRNSRare Earth Oxide separation commences in the U.S.
6th Dec 20237:00 amRNSConditional shares issue & share options exercise
5th Dec 20237:00 amRNSDFC to fund proposed $50M TechMet investment
1st Dec 20237:00 amRNSRBW's partner K-Tech presents at Congress hearing
21st Nov 20237:00 amRNSResults of Annual General Meeting
8th Nov 20237:00 amRNSTechMet option to invest US$50m in Phalaborwa

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.